Ballard Mining Limited · ASX:BM1

Ballard Mining — Diggers & Dealers Mining Forum 2026

17 slides from Ballard Mining's conference presentation, Jul 31, 2026

  1. Slide 1: High-Grade Gold. Growing. Permitted. Drill & Build.

    ASX: BM1 For personal use only HIGH-GRADE GOLD. GROWING. PERMITTED. DRILL & BUILD. Diggers & Dealers Mining Forum 3 – 5 August 2026 Management available for investor meetings: diggersmeetings@ballardmining.com.au

  2. Slide 2: Disclaimer

    DISCLAIMER The following notices and disclaimers apply to this Presentation ("Presentation") and you are therefore advised to read this NOT FINANCIAL PRODUCT ADVICE carefully before reading or making any other use of this Presentation or any information contained in this Presentation. This Presentat

  3. Slide 3: Disclaimer

    DISCLAIMER NO LIABILITY MINERAL RESOURCE ESTIMATE (MRE) The information contained in this Presentation has been prepared in good faith by Ballard. However, no guarantee, Information in this Presentation that relates to exploration results, the data and geological interpretation used as the basis of

  4. Slide 4: Simple Story: Drill and Build

    SIMPLE STORY Drill and Build For personal use only Funded to FID Permitted. Drilling for $62M at 30 June 2026 standalone scale 220,000m in 2026 ASX: BM1 4

  5. Slide 5: Corporate Summary

    CORPORATE SUMMARY De-risked balance sheet and share register. 24% institutional shareholders CORPORATE STRUCTURE BOARD & KEY MANAGEMENT PERSONNEL For personal use only 454 Million 22 Million Shares on issue Performance Rights & Options SIMON LILL PAUL BRENNAN TIM MANNERS Non-Executive Chair Managing

  6. Slide 6: Plan A – Targeting Standalone Scale

    PLAN A – TARGETING STANDALONE SCALE 220,000 metre drill program in CY2026 to drive resource growth For personal use only 6

  7. Slide 7: Mt Ida – Competitive Strengths

    MT IDA – COMPETITIVE STRENGTHS Funded to FID, Permitted and building standalone scale For personal use only 1.2MOZ MRE1 PERMITTED +50 TARGETS +1Moz @ 3.5g/t1 Mining Lease 53 Regional targets at the cornerstone application pending identified for testing Baldock deposit for West Knell UPSIDE POTENTIAL

  8. Slide 8: Baldock Deposit Growth Potential

    BALDOCK DEPOSIT GROWTH POTENTIAL Top 350m contains +1Moz @ 3.5 g/t, including 670koz @ 3.7 g/t in the Indicated category1 Dotted line is the February 2026 MRE outline (deeper sections informed by Lithium drilling) For personal use only High-grade hits 300m below and 200m along strike of the current

  9. Slide 9: Baldock Deposit Growth Potential

    BALDOCK DEPOSIT GROWTH POTENTIAL Orogenic deposits plumb deep • Mt Ida considered analogous to Gold Fields’ +10Moz Agnew gold camp by renowned For personal use only Structural Geologist Dr Sarah Jones o Same greenstone belt, same granite intrusion • Agnew 1.4km deep1 mine ~150km north • Ora Banda Ri

  10. Slide 10: Satellite Opportunities Emerging

    SATELLITE OPPORTUNITIES EMERGING The same rocks on both sides of the Copperfield Granite Holes Metres Avg Depth Max Depth Current MRE² For personal use only Baldock Shear 2,780 496,580 178m 1,249m 1,050oz Ballard Fault 774 88,899 114m 305m 120oz • Baldock has received 85% of drill effort for 90% of

  11. Slide 11: Satellite Opportunities Emerging

    SATELLITE OPPORTUNITIES EMERGING Ballard Fault: Shallow, high-grade mineralisation showing camp-scale potential For personal use only ASX: BM1 11

  12. Slide 12: Plan A – Standalone

    PLAN A – Standalone 1.5 Moz to bank it, 2.0 Moz by time it is built FY26 FY27 Top-down Goal: 100kozpa for 8-10 years Mar Q Jun Q Sep Q Dec Q Mar Q Jun Q MRE of 1.5 - 2.0 Moz will support this For personal use only Entire Ballard workforce incentivised with Final Investment Decision DFS & FID WINDOW

  13. Slide 13: Fully Permitted

    FULLY PERMITTED Fundamental differentiator from other gold developers • All Mineral Resources on Granted Mining Leases For personal use only • Approved Mining Proposal and Mine Closure Plan for open pit and underground mining at Baldock • Works Approval granted for 2.0 Mtpa Process Plant and tailing

  14. Slide 14: Growing Research Coverage

    GROWING RESEARCH COVERAGE Contact the following analysts for their perspective For personal use only Patrick Streater Kyle DeSouza Brad Watson Paul Howard Paul Hissey Management available for investor meetings at Diggers & Dealers Email us: diggersmeetings@ballardmining.com.au ASX: BM1 14

  15. Slide 15: Investment Highlights

    INVESTMENT HIGHLIGHTS Drill and Build For personal use only PRIME LOCATION GROWING TARGETING FULLY PROVEN TEAM MULTIPLE Heart of the WA RESOURCE STANDALONE PERMITTED Experienced gold UPCOMING Eastern Goldfields with 1.2Moz, including SCALE All Mineral Resources mine developers and CATALYSTS +15Mtpa

  16. Slide 16: Appendix – Mineral Resource Estimate

    ASX: BM1 For personal use only APPENDIX – MINERAL RESOURCE ESTIMATE

  17. Slide 17: Mineral Resource Estimate – February 2026

    MINERAL RESOURCE ESTIMATE – FEBRUARY 2026¹ Indicated Inferred Total Cut-off Deposit Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (‘000) g/t Au (‘000) (‘000) g/t Au (‘000) (‘000) g/t Au (‘000) For personal use only Baldock 2,916 3.9 362 395 2.6 33 3,311 3.7 395 Kestrel - - - 940 1.6 48

Ballard Mining — Diggers & Dealers Mining Forum 2026 on 6ix