  1. Slide 1: Annual General Meeting Managing Director Presentation

    Slide 1: Annual General Meeting Managing Director Presentation

    ASX: BM1 rsonal use only HIGH-GRADE GOLD. GROWING. PERMITTED. DRILL & BUILD Annual General Meeting Managing Director Presentation 27 November 2026

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER The following notices and disclaimers apply to this Presentation ("Presentation") and you are therefore advised to read this NOT FINANCIAL PRODUCT ADVICE carefully before reading or making any other use of this Presentation or any information contained in this Presentation. This Presentat

  3. Slide 3: Disclaimer

    Slide 3: Disclaimer

    DISCLAIMER NO LIABILITY MINERAL RESOURCE ESTIMATE (MRE) The information contained in this Presentation has been prepared in good faith by Ballard. However, no guarantee, Information in this Presentation that relates to exploration results, the data and geological interpretation used as the basis of

  4. Slide 4: Three Strategic Pillars for CY2027

    Slide 4: Three Strategic Pillars for CY2027

    THREE STRATEGIC PILLARS FOR CY2027 Drill and Build rsonal use only Deliver Resource Continue Growth & Complete Feasibility base that supports de-risking drilling Study Standalone scale Drilling is the cheapest form of insurance ASX: BM1 4

  5. Slide 5: Corporate Summary

    Slide 5: Corporate Summary

    CORPORATE SUMMARY Board is mix of explorers, developers and operators. Building management team for operational readiness CORPORATE STRUCTURE BOARD & KEY MANAGEMENT PERSONNEL rsonal use only 523 Million 29 Million SIMON LILL PAUL BRENNAN TIM MANNERS Shares on issue Performance Rights & Options Non-E

  6. Slide 6: Plan A – Drilling for Standalone Scale

    Slide 6: Plan A – Drilling for Standalone Scale

    PLAN A – DRILLING FOR STANDALONE SCALE Drilling to test Resource extensions and increase Resource confidence at Mt Ida rsonal use only Refer to the Ballard Announcement dated 23 September 2026 and the Disclaimer and Appendix A for further information on the MRE 6

  7. Slide 7: Plan A – Standalone

    Slide 7: Plan A – Standalone

    PLAN A – STANDALONE. Baseload from Baldock supplemented by regional deposits Phase 1 and Phase 2 development concept focused on the existing Mineral Resource base (ignores any new discoveries) rsonal use only • Phase 1: Baldock OP + regional open pits (West Knell, Golden Vale & Kestrel – current dri

  8. Slide 8: Gold Resource Growth & Conversion

    Slide 8: Gold Resource Growth & Conversion

    GOLD RESOURCE GROWTH & CONVERSION Growth…. Growing existing Resources through extensional drilling Conversion…. Infill drilling targeting conversion of Inferred to Indicated Mineral Resources rsonal use only ` MRE MILESTONES GROW AND DEVELOP 1.0 Moz 1.5 Moz 2.0 Moz 2.5 Moz 3.0 Moz Drilling and Resou

  9. Slide 9: CY2027 Workstreams

    Slide 9: CY2027 Workstreams

    CY2027 WORKSTREAMS Internal studies underway on Sep 1.84 Moz MRE1 to inform Process Plant design parameters and support commencement of detailed engineering for the Process Plant Feasibility Study (FS) targeted for mid-CY2027 rsonal use only ` FY27 FY28 Drill and Build Sep Q Dec Q Mar Q Jun Q Sep Q

  10. Slide 10: Baldock – High Grade Cornerstone Deposit

    Slide 10: Baldock – High Grade Cornerstone Deposit

    BALDOCK – HIGH GRADE CORNERSTONE DEPOSIT 1.36 Moz @ 3.5 g/t gold, including 650 koz @ 3.9 g/t in the Indicated Mineral Resource category1 rsonal use only High-grade hits 300m along strike of the OPEN MRE and open below 600m vertical depth OPEN OPEN Baldock named after the St Kilda footballer Darrell

  11. Slide 11: Phase Development: Building Open Pit Indicated Inventory

    Slide 11: Phase Development: Building Open Pit Indicated Inventory

    Phase 1 Development: Building Open Pit INDICATED Inventory Baldock Open Pit + Golden Vale OP + West Knell OP + Kestrel OP. All on granted Mining Leases. • Current Baldock Indicated Mineral Resource 650koz @ 3.9 g/t1 rsonal use only • Initial Infill programs now complete at Golden Vale (124koz1) and

  12. Slide 12: Recent Kestrel Infill Results

    Slide 12: Recent Kestrel Infill Results

    Phase 1 Development: Building Open Pit INDICATED Inventory Recent Kestrel Infill Results1 - some of the widest intersections reported at Mt Ida (and shallow) • 32m @ 2.4 g/t from 59m • 27m @ 1.3 g/t from 60m rsonal use only 1. Refer to the Ballard Announcement dated 18 November 2026 for further info

  13. Slide 13: Permitted & Infrastructure Works Underway

    Slide 13: Permitted & Infrastructure Works Underway

    PERMITTED & INFRASTRUCTURE WORKS UNDERWAY Resource grade + Permitting status is our fundamental differentiator from other gold developers • All Mineral Resources on Granted Mining Leases rsonal use only • Approved Mining Proposal and Mine Closure Plan for open pit and underground mining at Baldock •

  14. Slide 14: Investment Highlights

    Slide 14: Investment Highlights

    INVESTMENT HIGHLIGHTS Drill and Build rsonal use only PRIME LOCATION 1.84 Moz & STANDALONE PERMITTED PROVEN TEAM MULTIPLE Heart of the WA GROWING SCALE All Mineral Resources Experienced gold VALUE DRIVERS Eastern Goldfields with +1.84 Moz MRE Building Resource scale on granted Mining mine developers

  15. Slide 15: Appendix A Mineral Resource Estimate

    Slide 15: Appendix A Mineral Resource Estimate

    STRICTLY CONFIDENTIAL | DRAFT rsonal use only Appendix A Mineral Resource Estimate 15 ballardmining.com.au

  16. Slide 16: Mineral Resource Estimate – September 2026

    Slide 16: Mineral Resource Estimate – September 2026

    MINERAL RESOURCE ESTIMATE – SEPTEMBER 2026¹ Indicated Inferred Total Cut-off` Deposit Tonnes (kt) Grade (g/t Au) Ounces (koz) Tonnes (kt) Grade (g/t Au) Ounces (koz) Tonnes (kt) Grade (g/t Au) Ounces (koz) Baldock 3,530 3.9 437 1,010 2.5 79 4,540 3.5 516 Kestrel 940 1.6 48 940 1.6 48 rsonal use only