Sunrise Energy Metals Limited · ASX:SRL
Sunrise Energy Metals — Clean TeQ Holdings — Macquarie Australia Conference 2018
30 slides from Sunrise Energy Metals's conference presentation, May 2018
Slide 1: Critical Raw Materials for the Battery Revolution
CRITICAL RAW MATERIALS FOR THE BATTERY REVOLUTION ASX/TSX:CLQ MACQUARIE AUSTRALIA CONFERENCE MAY 2018
Slide 2: Disclaimer
DISCLAIMER IMPORTANT INFORMATION This presentation has been prepared by the management of Clean TeQ Holdings Limited (the ‘Company’) in connection with meetings with investors and potential investors and not as specific advice to any particular party or person. The information is based on publicly a
Slide 3: Corporate Overview
CORPORATE OVERVIEW CAPITAL STRUCTURE SHARE PRICE PERFORMANCE ASX/TSX code CLQ $1.80 14 Share Price (2 May 2018) A$0.94 Shares on Issue (2 May 2018) 740.6 M $1.60 12 Options 14.1 M $1.40 Performance Rights 6.1 M 10 Volume (millions) $1.20 Market Capitalisation (undiluted) A$695 M Proforma Cash @ 2 Ma
Slide 4: Introduction
INTRODUCTION TECHNOLOGY IS OUR CORE CAPABILITY Clean-iX® ION EXCHANGE TECHNOLOGY Development ready nickel-cobalt-scandium project Innovative, low cost waste water treatment solutions - Large, high grade cobalt resource - Four projects currently under construction/development - Strategically located
Slide 5: The Battery Revolution
THE BATTERY REVOLUTION ELECTRIC VEHICLES DRIVING HUGE GROWTH IN RAW MATERIALS DEMAND Global EV Sales Projections EV related cobalt & nickel demand million vehicles projections (2018 – 2025) 16 90 350 14 80 300 293 70 12 60 250 10 50 215 8 200 ~ 4x Demand (kt) 40 6 30 150 ~ 3x 4 20 100 77.6 78 2 10 5
Slide 6: China Is Leading the Race
CHINA IS LEADING THE RACE EMISSIONS CONTROLS LEGISLATION DRIVING THE AGENDA ▪ New Energy Vehicle (NEV) mandate 3 best selling EV’s in China – Dec 20171 finalised 2017 to become effective in 2019 ▪ Credit based system targeting: BAIC EC Series ▪ 10% EV by 2019, 12% in 2020 Price: US$22,000 Range: 200
Slide 7: Cobalt
COBALT SUPPLY CONSTRAINED & GEOGRAPHICALLY CONCENTRATED ▪ Majority of global cobalt sourced from COBALT – GLOBAL RANKINGS DRC presenting major supply risk for end 2017 ESTIMATED MINE COUNTRY users TONNES Mutanda DRC 24,500 ▪ Security of supply Tenke Fungurume DRC 16,400 ▪ Auditability of supply chai
Slide 8: Nickel
NICKEL NICKEL SULPHATE CAPACITY NEEDS TO GROW ▪ Electric vehicles are heavy consumers of Forecast Mined Supply of Class 1 Ni Projects nickel sulphate 1,200 350 ▪ Next generation lithium ion batteries will be more nickel intensive 300 Nickel Production (excl FeNi/NPI), ktpa 1,150 Nickel Sulphate Dema
Slide 9: Scandium
SCANDIUM A NEW GENERATION OF LIGHTWEIGHT ALLOYS ▪ Sunrise is one of the world’s largest and Airbus Group’s Light-rider highest grade scandium resources ▪ Scandium is used to provide next generation lightweight aluminium alloys for key transportation markets ▪ Clean TeQ continues to promote the use a
Slide 10: Development Ready Nickel-Cobalt-Scandium Project
DEVELOPMENT READY NICKEL-COBALT-SCANDIUM PROJECT CLEAN TEQ PA G E 9
Slide 11: Project Overview
PROJECT OVERVIEW ADVANCED DEVELOPMENT PROJECT LOCATED IN NSW ▪ 100% owned by Clean TeQ Sunrise ▪ Located 350km west of Sydney in an Project established mining region ▪ Significant infrastructure in place including sealed road to site ▪ Laterite (iron-hosted) mineral resource, rich in nickel, cobalt
Slide 12: Key Advantages
KEY ADVANTAGES PRIMARY DRIVERS TO SUCCESS AT SUNRISE MINERALOGY • One of the highest grade cobalt resources outside of Africa • Very low in acid consuming elements (magnesium and calcium) • Near surface deposit with maximum depth of 40m FLOWSHEET • Proprietary Clean iX technology provides lowest cos
Slide 13: High Cobalt Grades
HIGH COBALT GRADES LARGEST AND HIGHEST GRADE PROJECT IN AUSTRALIA Cobalt/nickel ratio Selected development projects: Grade vs Size1 & contained cobalt of Australian laterites2 Idado Cobalt 0.50% 0.16% 0.50% 0.25 180,000 Mt Thirsty 160,000 0.14% Mutooroo Sunrise 0.40% 0.20 140,000 NICO Walford Creek
Slide 14: Low Risk Mining Operation
LOW RISK MINING OPERATION SIMPLE AND LOW COST OPEN-PIT MINING AT SHALLOW DEPTHS Mineral distribution and orebody extent ▪ Shallow deposit (<40m) allows for simple strip-mining method and is amenable to free digging ▪ Minimal grinding and beneficiation required Cross section of Sunrise orebody Source
Slide 15: Innovative Clean-iX Processing
INNOVATIVE CLEAN-iX® PROCESSING SULPHATE PRODUCTS DIRECT FROM PRIMARY ORE PROCESSING ▪ Clean–iX® process removes Ore Leach Slurry High Concentration Nickel / Cobalt Nickel & Cobalt intermediate processing Solution Sulphates steps HPAL Ion Purification / Exchange SX ▪ cRIP has 60+ years of operation
Slide 16: Sunrise Process Flowsheet
SUNRISE PROCESS FLOWSHEET FOUR-STAGE PROCESS FROM ORE DIRECT TO SULPHATES MINING 1 & BENEFICIATION Ore is mined, crushed and mixed with water to make a slurry HIGH PRESSURE 2 ACID LEACHING Slurry treated at high pressure, high temperature & low pH in autoclaves to leach metals CLEAN TEQ PA G E 1 5
Slide 17: Sunrise Process Flowsheet
SUNRISE PROCESS FLOWSHEET FOUR-STAGE PROCESS FROM ORE DIRECT TO SULPHATES METAL 3 EXTRACTION (Clean iX®) Ion-exchange used to extract nickel, cobalt and scandium from leached solution 4 REFINING Eluate processed via solvent extraction before separation & crystallisation CLEAN TEQ PA G E 1 6
Slide 18: Highly Attractive Project Economics
HIGHLY ATTRACTIVE PROJECT ECONOMICS LOW OPERATING COSTS AND HIGH RETURNS ▪ NI 43-101 Technical Report (October 2017) confirmed C1 Cash cost sensitivity to cobalt price2 highly favourable economics ▪ Targeting lowest quartile operating costs $6 Spot Cobalt Price US$40.26/lb ▪ Potential for significan
Slide 19: Accelerating Development
ACCELERATING DEVELOPMENT A$155 MILLION CAPITAL RAISING RECENTLY COMPLETED ▪ Equity raising to significantly advance and USE OF PROCEEDS accelerate development of Sunrise Detailed engineering and design for process ▪ Brings forward engineering and detailed plant and associated infrastructure design w
Slide 20: Project Financing
PROJECT FINANCING STRONG BANKING SUPPORT FOR PROJECT DEBT FACILITY ▪ Mandated Lead Arranger (MLA) group appointed November 2017 ▪ National Australia Bank ▪ Societe General ▪ Natixis ▪ International Commercial Bank of China (ICBC) ▪ US$500 million in indicative commitments received, prior to syndicat
Slide 21: Offtake & Investment Strategy
OFFTAKE & INVESTMENT STRATEGY CONSIDERABLE DEMAND FROM END USERS AND INTERMEDIARIES ▪ First offtake agreement with Beijing Easpring signed in 2017 ▪ Extensive due-diligence is ongoing by a range of parties considering product offtake Binding five-year offtake agreement for 20% of cobalt and nickel s
Slide 22: Project Is Development Ready
PROJECT IS DEVELOPMENT READY ALL KEY APPROVALS, PERMITS AND TESTING COMPLETE STUDIES WATER POWER & GAS OFFTAKE MINING LEASES Prefeasibility study 3.2GLpa water allocation Power and gas are Binding offtake signed Granted by NSW completed granted by the NSW within close proximity with Beijing Easpring
Slide 23: Indicative Project Schedule
INDICATIVE PROJECT SCHEDULE 2018 2019 2020 2021 DETAILED DEFINITIVE PROJECT CONSTRUCTION COMMENCE ENGINEERING FEASIBILITY FINANCING Commence formal COMMISSIONING FEED for process STUDY Secure project debt plant construction & RAMP UP plant and associated Due June 2018 finance via MLA group infrastru
Slide 24: Contact
Sam Riggall Chief Executive Officer M: +61 3 9797 6700 E: sriggall@cleanteq.com Clean TeQ Holdings Limited 12/21 Howleys Rd Notting Hill VIC 3000 AUSTRALIA www.cleanteq.com
Slide 25: Appendix
APPENDIX CLEAN TEQ PA G E 2 4
Slide 26: Leadership
LEADERSHIP EXPERTISE WHERE HIGH-TECH MEETS RESOURCE DEVELOPMENT MANAGEMENT TEAM Sam Riggall CHIEF EXECUTIVE OFFICER Ben Stockdale Tim Kindred Willem Vriesendorp CHIEF FINANCIAL OFFICER SUNRISE PROJECT & GENERAL MANAGER START-UP DIRECTOR WATER DIVISION BOARD Robert Friedland Zhaobai Jiang CO-CHAIR AN
Slide 27: Project Delivery Model
PROJECT DELIVERY MODEL TWO OPTIONS UNDER CONSIDERATION FOR PROJECT EXECUTION Alliance Delivery EPC Delivery ▪ Similar to conventional EPCM contract ▪ Fixed price lump-sum Engineering- Procurement-Construct (EPC) proposal under ▪ SNC Lavalin and CB&I selected to progress consideration first stage of
Slide 28: Proposed Site Layout
—— ROPOSED SITE LAYOUT e is Pipeline _—~ AMA (UNDER APPLICATION) ‘ilometres
Slide 29: Reserves and Resources
RESERVES AND RESOURCES COMPETENT & QUALIFIED PERSON CONSENTS The information in this document that relates to nickel-cobalt Mineral Resources from the 2016 Pre Feasibility Study is based on information compiled by Diederik Speijers and John McDonald, who are Fellows of The Australasian Institute of
Slide 30: Reserves and Resources
RESERVES AND RESOURCES COMPETENT & QUALIFIED PERSON CONSENTS Lynn Widenbar, Principal Consultant (Widenbar & Associates), BSc (Geology)(Hons), MSc (Mineral Exploration) (Hons), DIC, MAusIMM, MAIG, by virtue of his education, membership of a recognised professional association and relevant work exper
Clean TeQ Holdings — Macquarie Australia Conference 2018 on 6ix