Copano Energy L.L.C — Platts 5th Pipeline Development & Expansion Conference (September 2010)
15 slides from Copano Energy L.L.C's conference presentation, Sep 23, 2010
Slide 1: Copano's expansions in the Eagle Ford Shale, including a joint venture with Kinder Morgan
Copano’s expansions in the Eagle Ford Shale, including a joint venture with Kinder Morgan Platts 5 th Pipeline Development & Expansion Conference September 24, 2010 NASDAQ: CPNO
Slide 2: Disclaimer
Disclaimer This presentation includes “forward-looking statements,” as defined in the federal securities laws. Statements that address activities, or events that Copano believes will or may occur in the future are forward-looking statements. These statements include, but are not limited to, statemen
Slide 3: Introduction to Copano
Introduction to Copano Independent midstream company founded in 1992 ■ Best in class service to customers ■ Entrepreneurial approach ■ Focus on long-term accretive growth Provides midstream services in multiple producing areas through three operating segments ■ Texas ● South Texas conventional and E
Slide 4: Key Copano Metrics
Key Copano Metrics Service throughput volumes approximate 1.8 Bcf/d of natural gas (1) Approximately 6,700 miles of active pipelines 8 natural gas processing plants with over 1.1 Bcf/d of combined processing capacity One NGL fractionation facility with total capacity of 22,000 Bbls/d Equity market c
Slide 5: Copano in 1992
Copano in 1992 Copano began with a 23-mile pipeline in Copano Bay in
Slide 6: Copano Assets in South Texas - Pre-Eagle Ford
Copano Assets in South Texas - Pre-Eagle Ford Acquired and extended multiple gathering systems Acquired Houston Central plant in 2001 Developed KMTP relationship
Slide 7: Copano's Houston Central Complex
Copano’s Houston Central Complex 700 MMcf/d of processing capacity ■ 200 MMcf/d of readily available expansion capacity NGL fractionation and transportation ■ Newly commissioned 22,000 BPD fractionator (May 2010) ■ Ability to further expand fractionation facility ■ Over 250 miles of NGL pipelines pr
Slide 8: Eagle Ford Shale Development
Eagle Ford Shale Development
Slide 9: Eagle Ford Shale Advantages
Eagle Ford Shale Advantages Substantial infrastructure exists today Rich gas and condensate/crude provide drilling incentive to producers Lower break-even prices compared to most other shale and conventional plays Significant demand for natural gas and NGLs on the Texas Gulf Coast Historically fewer
Slide 10: 2010 - DeWitt-Karnes Header System
2010 - DeWitt-Karnes Header System Built Dewitt Karnes Header (45 miles of 24” pipeline) ■ In-service September Services the most prolific rich gas window of the Eagle Ford Shale Access to Houston Central complex via KMTP 30” pipeline
Slide 11: Why is the Joint Venture a Natural Fit?
Why is the Joint Venture a Natural Fit? Long-standing relationship between Copano and Kinder Morgan Copano ■ Gathering and processing expertise ■ Available processing and fractionation capacity ■ Multiple market access for natural gas and NGLs Kinder Morgan ■ Transmission expertise ■ Available pipel
Slide 12: Eagle Ford Gathering, LLC
Eagle Ford Gathering, LLC 50/50 Kinder Morgan/Copano ■ Initial build-out of 85 miles of 24” and 30” pipelines (expected completion: summer 2011) ■ Copano acts as operator and managing member ■ 520,000 MMBtu/d of capacity without compression Kinder Morgan and Copano share commercial development activ
Slide 13: Potential Extensions - 2012 and beyond
Potential Extensions - 2012 and beyond Copano 24” extensions (KM loop to HCP) Possible processing expansion
Slide 14: Eagle Ford Shale Expansion Summary
Eagle Ford Shale Expansion Summary Integrated midstream solutions throughout the Eagle Ford trend Immediately available capacity Readily expandable infrastructure Access to multiple markets for natural gas and NGLs
Slide 15: Contact Information
Contact Information Jim Wade Copano Energy - Texas President jim.wade@copanoenergy.com Duane Kokinda Kinder Morgan Texas Pipeline LLC President Duane.kokinda@kindermogan.com Brian Eckhart Copano Energy - Texas Senior Vice President, Supply and Transportation brian.eckhart@copanoenergy.com Bruce Boyd