Broken Hill Mines Limited · ASX:BHM

Broken Hill Mines — Investor Presentation (August 2025)

23 slides from Broken Hill Mines's investor presentation, Aug 7, 2025

  1. Slide 1: Investor Presentation: Rasp & Pinnacles Ag-Pb-Zn Mines

    For personal use only Investor Presentation August 2025 Rasp & Pinnacles Ag-Pb-Zn Mines Consolidating one of Australia’s great mining jurisdictions

  2. Slide 2: Important Notice & Disclaimer

    Important Notice & Disclaimer Summary information Not a recommendation or financial product advice For personal use only This presentation has been prepared by Broken Hill Mines Limited (BHM or the Company) relating to the operation The information in this presentation is not a recommendation, wheth

  3. Slide 3: The Broken Hill Ore Body

    The Broken Hill Ore Body Largest and richest silver-lead-zinc ore body in the world For personal use only Broken Hill (c. 1896) Historical Snapshot • 300Mt at 15% Zn + Pb & 300g/t Ag • Continuous ore body growth over mine life • Mined for over 140 years (since 1885) • Production: >1 Billion Oz silve

  4. Slide 4: Broken Hill Mines Strategy

    Broken Hill Mines Strategy Consolidating operational Rasp Mine infrastructure with Pinnacles Mine mineral resource base For personal use only Broken Hill Tenement Map Consolidation of Rasp & Pinnacles Mines Rasp Pinnacles Mine Mine Main Lode Perseverance (underground) (underground) Western Min Pinna

  5. Slide 5: Capital Structure

    Capital Structure Completed reverse listing via the takeover of ASX-listed Coolabah Metals Ltd Board & Management For personal use only ASX Code BHM Track record in developing & operating world-class mature mines Patrick Walta Executive Chair Experience in M&A & large-scale Ag-Pb-Zn development & op

  6. Slide 6: Rasp Mine: Overview & Strategy for Life Extension

    Rasp Mine Overview & Strategy for Life Extension For personal use only Overview of Rasp Operation 6

  7. Slide 7: Rasp Mine Overview

    Rasp Mine Overview Broken Hill For personal use only Mineral Resources1 10.1 million tonnes at 9.4% ZnEq2 (5.7% Zn, 3.2% Pb & 48.5 g/t Ag) Pinnacles Mine Mining method Sub-level open stoping and up-hole stoping Processing method Grinding, flotation, thickening and filtration Rasp Mine Plant capacity

  8. Slide 8: Rasp Mine Historical Performance

    Rasp Mine Historical Performance 2023 affected by: macro factors (~26% Zn price ↓ & ~93% TC ↑), one-month For personal use only Ore throughput constrained to <400ktpa due to tailings management system (solar drying), with plant capacity of 750ktpa downtime & one-off costs inc. A$8m in redundancies 8

  9. Slide 9: Rasp Resources Overview

    Rasp Resources Overview LONG-TERM MINE LIFE EXTENSION FOCUS Western Min: Western Min: Western Min: Lowers South Lowers Siberia Centenary Western Min: For personal use only Centenary Deeps Uppers North CURRENT HIGH GRADE RESOURCE ZONE HIGH GRADE ‘LINE OF LODE’ REMNANT MINING OPPORTUNITY OPEN Current

  10. Slide 10: Main Lode Development Schematic

    Main Lode Development Schematic High Grade Main Lode 500m Access For personal use only Development to Main Lode Development Progress: Blackwoods Deposit be completed (Main Lode) • Byrnecut engaged to provide underground development works onto the high-grade Main Lode ore body • Total development req

  11. Slide 11: Rasp: Clear Growth Strategy With Significant Optionality

    Rasp: Clear Growth Strategy With Significant Optionality Rasp MRE: 10.1Mt @ 9.4% ZnEq (5.6% Zn, 3.2% Pb, 48g/t Ag) For personal use only Near-Term: Medium-Term: Long-Term: High-Grade Focus Underpin Production Continued Resource Growth Main Lode Western Mineralisation Centenary Initial focus of BHM d

  12. Slide 12: Rasp: Vast Sunk Capital & >10 Years of Operations

    New portal & decline (2022) Workshops, reagent stores & site lab Rasp: Vast Sunk Capital & >10 Years of Operations For personal use only BHM acquired a fully operational mine and processing infrastructure1: 750,000tpa capacity processing facility High grade concentrate production • 750,000tpa capaci

  13. Slide 13: Simple Processing of Zinc & Lead Concentrates

    Simple Processing of Zinc & Lead Concentrates For personal use only Modern, 750ktpa capacity plant using conventional comminution (coarse 200um grind) & sequential flotation Primary Crushing Lead Flotation Zinc Flotation Tailings & Backfill SAG & Bill Mill Grinding Concentrate Thickening & Filtratio

  14. Slide 14: South Australia Rail Overview

    South Australia Rail Overview Established Production & Logistics Supply Chain For personal use only • Zinc concentrate typical grade: 49-50% zinc • Lead concentrate typical grade: 65% Pb & 800 - 1,000g/t Ag Lead concentrate can be either transported to the Nyrstar Lead Smelter at Port Pirie or expor

  15. Slide 15: Pinnacles Mine JV

    Pinnacles Mine JV 70% Operating Profit Share Arrangement Over the Pinnacles Mine For personal use only Overview of Pinnacles Operation 15

  16. Slide 16: Pinnacles Mine Overview

    Pinnacles Mine Overview Broken Hill For personal use only Rasp Mine Mineral Resources1 6.0 million tonnes @ 10.9% ZnEq (4.7% Zn, 3.3% Pb & 132g/t Ag) 6.0 - 15.0 million tonnes @ 2.0 - 4.0% Zn, 3.0 - 6.0% Pb, 40 - Exploration Target2 125g/t Ag) Metamorphosed VMS (volcanic hosted massive sulphide) Min

  17. Slide 17: Mineral Resource Overview

    Mineral Resource Overview Pinnacles MLs & Resources For personal use only The Pinnacles Mines is considered to be one of the highest grade and shallowest deposits in Broken Hill Pinnacles Mining History: • Pinnacles mining started in 1884, to a depth of 80m below surface only • Only the high-grade s

  18. Slide 18: High-Grade & Shallow Intercepts

    High-Grade & Shallow Intercepts For personal use only Exceptional Historical (previously unassayed) Drilling Intercepts1:  8.9m @ 920g/t Ag, 12.2% Pb & 1.3% Zn (36.3% ZnEq) from 11m - PN311 o Incl. 5.9m @ 1,350 g/t Ag, 17.4% Pb, 1.9% Zn (52.8% ZnEq) from 14m  8.2m @ 763g/t Ag, 13.4% Pb & 1.7% Zn (

  19. Slide 19: Near Term Open Pit Potential

    Near Term Open Pit Potential For personal use only 19

  20. Slide 20: Development Timeline

    Development Timeline For personal use only Calendar Year 2025 2026 2027 Rasp Mine Western Mineralisation operations Main Lode development Main Lode operations Pinnacles Mine Drilling, studies & development Underground operations* * BHM assessing potential for near term (2026) open pit operations at

  21. Slide 21: For personal use only

    For personal use only Patrick Walta Shane Goodwin Executive Chairman Head of Corporate Affairs pwalta@brokenhillmines.com sgoodwin@brokenhillmines.com 21

  22. Slide 22: Unlocking the Full Potential of Broken Hill

    Unlocking the Full Potential of Broken Hill BHM agreements over the Rasp and Pinnacles Mines For personal use only Pinnacles JV Mining Broken Hill Consolation Rasp Mine Acquisition Agreement Strategy Acquisition Completed: Agreement Executed: Infrastructure Advantage: $1 consideration, BHM contribut

  23. Slide 23: Zinc Metal Equivalents (ZnEq)

    Zinc Metal Equivalents (ZnEq) For personal use only Metal recoveries used in the zinc equivalent (ZnEq) calculations for each element are based on the average metallurgical recoveries of Rasp achieved based on historical performance and applied to all ore types, including Pinnacles. ZnEq used in thi

Broken Hill Mines — Investor Presentation (August 2025) on 6ix