Copper Road Resources Inc · TSXV:CRD
Copper Road Resources — Investor Presentation (May 2026)
19 slides from Copper Road Resources's investor presentation, May 2026
Slide 1: Exploring for World-Class Cu-Zn-Ag & Au
BEN NEVIS VOLCANIC COMPLEX — ABITIBI GREENSTONE BELT Exploring for World-Class Cu-Zn-Ag & Au TSXV: CRD | MAY 2026
Slide 2: Forward-Looking Statements
LEGAL DISCLOSURE Forward-Looking These forward-looking statements are based on the opinions, assumptions and estimates of management as of the date they are made and involve known and unknown risks, uncertainties and other factors that Statements may cause actual results, performance or achievements
Slide 3: Ben Nevis Project Abitibi Greenstone Belt
PROJECT OVERVIEW Ben Nevis Project Abitibi Greenstone Belt Home to some of the world’s greatest Volcanogenic Massive Sulphide (VMS) deposits and gold mines. Ben Nevis has the potential for both occurrences as well as Archean porphyry-style Cu-Au-Mo mineralization.c TSXV: CRD | www.copperroadresourc
Slide 4: Building Value Across a District-Scale Land Package
VALUE PROPOSITION Building Value Across a District-Scale Land Package 01 02 03 04 District-Scale Consolidation Large Land Position Historically Underexplored Excellent Infrastructure Total project includes 174 mining Past exploration and drilling has Accessible road, power, water First-ever consolid
Slide 5: Acquisition of the Ben Nevis Project
PORTFOLIO GROWTH Acquisition of the Ben Nevis Project A mirror image of the HIGHLIGHTS Noranda–LaRonde gold-rich VMS mining camps Copper Road has consolidated two entire townships that comprise the Ben Nevis Volcanic Complex Facilitates exciting exploration potential for Cu-Zn-Ag VMS deposits and fo
Slide 6: Building Momentum through each exploration phase
2026 EXPLORATION PROGRAM Building Momentum Underway through each exploration phase Phase 3 Field work, mapping, LiDAR survey and geophysics to finalize drill targets Completed Phase 1 2 3 4 Flew mobile MT survey 1 Pending Phase 4 Underway Phase 2 Initial drill program of up to 6,000 metres in Data i
Slide 7: Blake River Assemblage
REGIONAL GEOLOGIC SETTING Blake River Assemblage • A common setting for the Ben Nevis volcanic complex • The Noranda camp, 40 km to the east, is host to 23 VMS deposits • The Doyon-Bousquet-LaRonde VMS camp, 60 km east, hosts 11 VMS deposits • These deposits have produced 375 million tonnes of coppe
Slide 8: Ben Nevis Geology Map
PROPERTY GEOLOGY Ben Nevis Geology Map TSXV: CRD | www.copperroadresources.ca 08
Slide 9: Ben Nevis Property Map
PROPERTY DETAIL Ben Nevis Property Map TSXV: CRD | www.copperroadresources.ca 09
Slide 10: Capital Structure
CAPITAL STRUCTURE May 2026 Shares 101.5M Warrants @ $0.06 29.4M (expire May – November 2027) Options @ $0.09 5.7M Fully diluted 136.6M Sterling Metals (TSXV: SAG | OTCQB: SAGGF) shareholding is currently valued at approximately $2.7M — a liquid treasury asset. TSXV: CRD | www.copperroadresources.ca
Slide 11: Mount Jamie Project
SECONDARY PROPERTY Mount Jamie Project • Thirty (30) unpatented mining claims situated in Todd Township, Red Lake Mining Division, covering 440 hectares • The Company completed a 972-metre drill campaign in 2021 • Flew VTEM in 2024 • Copper Road invested $735,000 in the project, with $660,000 in the
Slide 12: Mount Jamie Red Lake Division
PROPERTY MAP Mount Jamie Red Lake Division 30 UNPATENTED CLAIMS 440 HECTARES Todd Township, Red Lake Mining Division, Northwestern Ontario. TSXV: CRD | www.copperroadresources.ca 12
Slide 13: Management & Board
Management & Board Brian Howlett, CPA | President and CEO Mr. Howlett is a seasoned professional with more than 30 years of senior management experience. Brian is the former President and Chief Executive Officer of Hemlo Explorers Inc. and Dundee Sustainable Technologies Inc. He previously served as
Slide 14: Board of Directors
Board of Directors J. Birks Bovaird, ICD.D | Independent Director Corporate finance and strategic planning expert with extensive public and private board experience. Current director of Energy Fuels Inc., Noble Mineral Exploration, and Homeland Nickel Inc. Background in banking, financial services,
Slide 15: Technical Team
Technical Team Michael P. Rosatelli, M.Sc., P.Geo. | Technical Advisor Professional Geologist with 30+ years of experience in mineral exploration and discovery. Former VP Exploration at Golden Valley Mines and Val-D'Or Mining. Extensive experience with major and junior mining companies including BHP
Slide 16: Why Invest in Copper Road Resources?
INVESTMENT CASE Why Invest in Copper Road Resources? Very prospective district-scale project in the heart of the Abitibi Greenstone Belt Ben Nevis Complex is located in the western extent of the Blake River Assemblage the most prolific gold and copper stratigraphy in the Abitibi Greenstone Belt, hom
Slide 17: Contact Us
Contact Us Brian Howlett, CPA President & CEO EMAIL brian@copperroadresources.ca PHONE 1-647-227-3035 @CopperRoadResourcesInc. @CopperRoadRes TSXV: CRD | www.copperroadresources.ca 17
Slide 18: Technical Maps
APPENDIX Technical Maps Figure 4: A map of apparent conductivity at 138 Hz overlapped with contours of Figure 5: Structural analysis results show conductive and resistive axes extracted magnetic anomalies derived from the total magnetic intensity. Note: In general, from a series of apparent conducti
Slide 19: Technical Maps
APPENDIX Technical Maps Figure 6: The Mobile MT survey provided new geophysical constraints on bedrock resistivity and magnetic Figure 7: See caption for Figure 6 on details – See Figure 9 for historical work results variations. This resistivity voxel and apparent conductivity map show here, highlig
Copper Road Resources — Investor Presentation (May 2026) on 6ix