Perpetua Resources Corp. · TSX:PPTA
Perpetua Resources — Corporate Update (November 2026)
25 slides from Perpetua Resources's corporate update, Nov 17, 2026

Slide 1: Perpetua Resources Investor Webinar Presentation
PERPETUA RESOURCES Investor Webinar Presentation - November 17, 2026 T S X : P P TA N A S D AQ : P P TA

Slide 2: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Information and statements contained in this presentation that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities legislation and the

Slide 3: Cautionary Note & Technical Disclosure
CAUTIONARY NOTE & TECHNICAL DISCLOSURE Cautionary Statement Regarding Reserve and Technical Information The material scientific and technical information in respect of the Stibnite Gold Project in this presentation, unless otherwise indicated, is based upon information contained in the technical rep

Slide 4: Agenda and Speakers
AGENDA SPEAKERS Introduction Construction Update Tungsten Program Update Exploration Update Jon Cherry, Mark Murchison, President & CEO CFO 4

Slide 5: Construction Update
CONSTRUCTION UPDATE 5

Slide 6: Worker Housing Facility
WORKER HOUSING FACILITY First Phase of Construction Complete Worker Housing Facility KDR Facility Worker Housing Facility civil works are complete Foundation installation is complete for kitchen, Dormitories dining and recreation (KDR) facility, arctic corridor and dormitory wings Placement and erec

Slide 7: Burntlog Route Progressing
BURNTLOG ROUTE PROGRESSING 5.4 Miles of New Road Completed Burntlog Route construction Burntlog Route (BLR) will provide year-round access to the Project with an upgraded road designed to handle heavier loads and larger equipment Road work ramped up over the summer as crews began construction along

Slide 8: Powerline Construction Underway
POWERLINE CONSTRUCTION UNDERWAY Power pole installation has begun Essential items such as power poles and ancillary equipment have been procured and delivered Power pole installation to Perpetua’s laydown areas Powerline construction was initiated in late September, with surveying and staking and pr

Slide 9: Process Plant Engineering & Construction
PROCESS PLANT ENGINEERING & CONSTRUCTION Site Infrastructure Progress Process Plant and Infrastructure Significant portions of the process plant Process plant area site have been cleared in preparation for civil grading Pre-mobilization spot grading proceeding to ensure construction readiness for th

Slide 10: Engineering & Procurement
ENGINEERING & PROCUREMENT Advancing engineering, planning, & fabrication Water treatment includes 3 plants: Concrete foundation works to commence in December – Fresh water treatment Treatment technologies include: – Sanitary water treatment – Reverse osmosis – Contact water treatment – Two stage pre

Slide 11: Engineering & Procurement
ENGINEERING & PROCUREMENT Advancing engineering, planning, & fabrication More than 68 procurement packages are active and advancing; focus is on critical long-lead items such as autoclaves, mills, crushers, and screens Autoclave fabrication offsite is well underway with superstructure welding comple

Slide 12: Tungsten Program Update
TUNGSTEN PROGRAM UPDATE

Slide 13: Industrial Tungsten Program
INDUSTRIAL TUNGSTEN PROGRAM1 Strategic Asset Historical Tungsten Tungsten production at the Stibnite district dates to 1942 and Mining at Stibnite historical records suggest that ~50% of tungsten used by the United States during WWII and the Korean War was sourced from Stibnite2. Export restrictions

Slide 14: Industrial Tungsten Program
INDUSTRIAL TUNGSTEN PROGRAM Multi-phase approach to assessing tungsten opportunity at Stibnite Tungsten program is designed in multiple phases: Phase 1: initial work expected to include exploration drilling, resource definition, metallurgical and processing testing, and underground decline design an

Slide 15: Industrial Tungsten Program
INDUSTRIAL TUNGSTEN PROGRAM Recent drilling at Stibnite has identified high-grade zones of antimony and tungsten mineralization Perpetua’s recent drilling beneath the Hangar Flats deposit returned significant tungsten- antimony mineralization including*: – SB522: 9.8m @ 4.6% W + 8.3% Sb – SB519: 22.

Slide 16: Exploration Update
EXPLORATION UPDATE

Slide 17: Extensive Exploration Upside
EXTENSIVE EXPLORATION UPSIDE1 S T I B N I T E G O L D P R OJ E C T M I N E R A L ENDOWMENT2 WITHIN EXISTING DEPOSITS: 12.0 Million gold ounces Northeast of Yellow Pine Deposit – CTFZ, Homestake, NMCFZ prospects 10.0 Below Hangar Flats Pit & Old Defense Minerals Drill program to establish 1.6 Gold Ex

Slide 18: Exploration Update
EXPLORATION UPDATE More than 16,000 meters of drilling completed in 2026 on targets at Clark Tunnel Fault Zone (CTFZ), Fiddle, Scout, and Hangar Flats New discoveries include high-grade gold- antimony mineralization at Fiddle and a new gold-tungsten discovery at CTFZ Upgraded on-site core cutting an

Slide 19: High-Grade Mineralization Identified Near Yellow Pine Pit
HIGH-GRADE MINERALIZATION IDENTIFIED NEAR YELLOW PINE PIT (CTFZ, HFZ) The drill program is focused on adding high-grade feed to the front end of the mine plan to sustain high-production years and expand gold and antimony production later in mine life Drilling at Clark Tunnel Fault Zone (CTFZ) return

Slide 20: High-Grade Mineralization Identified Near Yellow Pine Pit
HIGH-GRADE MINERALIZATION IDENTIFIED NEAR YELLOW PINE PIT (CTFZ, HFZ) Follow-up drilling from the Clark Tunnel Fault Zone (“CTFZ”) continued to demonstrate near-surface, high grades Recent drilling returned: – SB606: 25.4m @ 4.5 g/t Au – SB605: 25.0m @ 2.3 g/t Au* Given its combination of high grade

Slide 21: Additional High-Grade Mineralization Around Hangar Flats Pit
ADDITIONAL HIGH-GRADE MINERALIZATION AROUND HANGAR FLATS PIT IDENTIFIED Hangar Flats remains open at depth and along strike and is a key focus for the 2026 drill program Recent drilling at Hangar Flats extensions including: SB584: 3.0m @ 14.5 g/t Au* Recent critical mineral-focused drilling** DMEA T

Slide 22: New Gold-Antimony Discovery at Fiddle Prospect
NEW GOLD-ANTIMONY DISCOVERY AT FIDDLE PROSPECT BETWEEN YELLOW PINE AND HANGAR FLATS The Fiddle discovery hole is among the most significant mineralized intercepts encountered at the Perpetua site to date and adds a new target area to the Project’s North Tunnel growing in-pit and near-pit resource ba

Slide 23: Mine Sequencing and Production Profile
MINE SEQUENCING AND PRODUCTION PROFILE Gold Production and All-in Sustaining Costs Supplementing Production via Exploration* 600 $2,000 $/oz Gold Production, Koz 500 $1,542 $1,511 $1,500 400 $1,281 $1,338 $1,170 Gold Production (Koz) 300 $972 556 $883 Stockpile $1,000 512 447 396 processing All-in S

Slide 24: Thank You
THANK YOU

Slide 25: Non-GAAP Measures
NON-GAAP MEASURES This presentation includes disclosure of certain non-GAAP financial measures or ratios, including expected Cash Costs, Total Cash Costs, All-In Sustaining Costs (AISC), All-In Costs (AIC), Average Annual EBITDA and Average Annual Free Cash Flow (FCF) with respect to the expected re
Source: company website
More decks from Perpetua Resources Corp.
Investor Presentation (November 2026)38 slides · Nov 17, 2026
Investor Presentation (September 2026)34 slides · September 2026
Investor Presentation (July 2026)34 slides · July 2026
Investor Presentation (April 2026)34 slides · April 2026
Investor Presentation (February 2026)34 slides · February 2026
Investor Presentation (December 2025)34 slides · December 2025