  1. Slide 1: Perpetua Resources Investor Webinar Presentation

    Slide 1: Perpetua Resources Investor Webinar Presentation

    PERPETUA RESOURCES Investor Webinar Presentation - November 17, 2026 T S X : P P TA N A S D AQ : P P TA

  2. Slide 2: Forward-Looking Statements

    Slide 2: Forward-Looking Statements

    FORWARD-LOOKING STATEMENTS Information and statements contained in this presentation that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities legislation and the

  3. Slide 3: Cautionary Note & Technical Disclosure

    Slide 3: Cautionary Note & Technical Disclosure

    CAUTIONARY NOTE & TECHNICAL DISCLOSURE Cautionary Statement Regarding Reserve and Technical Information The material scientific and technical information in respect of the Stibnite Gold Project in this presentation, unless otherwise indicated, is based upon information contained in the technical rep

  4. Slide 4: Agenda and Speakers

    Slide 4: Agenda and Speakers

    AGENDA SPEAKERS Introduction Construction Update Tungsten Program Update Exploration Update Jon Cherry, Mark Murchison, President & CEO CFO 4

  5. Slide 5: Construction Update

    Slide 5: Construction Update

    CONSTRUCTION UPDATE 5

  6. Slide 6: Worker Housing Facility

    Slide 6: Worker Housing Facility

    WORKER HOUSING FACILITY First Phase of Construction Complete Worker Housing Facility KDR Facility Worker Housing Facility civil works are complete Foundation installation is complete for kitchen, Dormitories dining and recreation (KDR) facility, arctic corridor and dormitory wings Placement and erec

  7. Slide 7: Burntlog Route Progressing

    Slide 7: Burntlog Route Progressing

    BURNTLOG ROUTE PROGRESSING 5.4 Miles of New Road Completed Burntlog Route construction Burntlog Route (BLR) will provide year-round access to the Project with an upgraded road designed to handle heavier loads and larger equipment Road work ramped up over the summer as crews began construction along

  8. Slide 8: Powerline Construction Underway

    Slide 8: Powerline Construction Underway

    POWERLINE CONSTRUCTION UNDERWAY Power pole installation has begun Essential items such as power poles and ancillary equipment have been procured and delivered Power pole installation to Perpetua’s laydown areas Powerline construction was initiated in late September, with surveying and staking and pr

  9. Slide 9: Process Plant Engineering & Construction

    Slide 9: Process Plant Engineering & Construction

    PROCESS PLANT ENGINEERING & CONSTRUCTION Site Infrastructure Progress Process Plant and Infrastructure Significant portions of the process plant Process plant area site have been cleared in preparation for civil grading Pre-mobilization spot grading proceeding to ensure construction readiness for th

  10. Slide 10: Engineering & Procurement

    Slide 10: Engineering & Procurement

    ENGINEERING & PROCUREMENT Advancing engineering, planning, & fabrication Water treatment includes 3 plants: Concrete foundation works to commence in December – Fresh water treatment Treatment technologies include: – Sanitary water treatment – Reverse osmosis – Contact water treatment – Two stage pre

  11. Slide 11: Engineering & Procurement

    Slide 11: Engineering & Procurement

    ENGINEERING & PROCUREMENT Advancing engineering, planning, & fabrication More than 68 procurement packages are active and advancing; focus is on critical long-lead items such as autoclaves, mills, crushers, and screens Autoclave fabrication offsite is well underway with superstructure welding comple

  12. Slide 12: Tungsten Program Update

    Slide 12: Tungsten Program Update

    TUNGSTEN PROGRAM UPDATE

  13. Slide 13: Industrial Tungsten Program

    Slide 13: Industrial Tungsten Program

    INDUSTRIAL TUNGSTEN PROGRAM1 Strategic Asset Historical Tungsten Tungsten production at the Stibnite district dates to 1942 and Mining at Stibnite historical records suggest that ~50% of tungsten used by the United States during WWII and the Korean War was sourced from Stibnite2. Export restrictions

  14. Slide 14: Industrial Tungsten Program

    Slide 14: Industrial Tungsten Program

    INDUSTRIAL TUNGSTEN PROGRAM Multi-phase approach to assessing tungsten opportunity at Stibnite Tungsten program is designed in multiple phases: Phase 1: initial work expected to include exploration drilling, resource definition, metallurgical and processing testing, and underground decline design an

  15. Slide 15: Industrial Tungsten Program

    Slide 15: Industrial Tungsten Program

    INDUSTRIAL TUNGSTEN PROGRAM Recent drilling at Stibnite has identified high-grade zones of antimony and tungsten mineralization Perpetua’s recent drilling beneath the Hangar Flats deposit returned significant tungsten- antimony mineralization including*: – SB522: 9.8m @ 4.6% W + 8.3% Sb – SB519: 22.

  16. Slide 16: Exploration Update

    Slide 16: Exploration Update

    EXPLORATION UPDATE

  17. Slide 17: Extensive Exploration Upside

    Slide 17: Extensive Exploration Upside

    EXTENSIVE EXPLORATION UPSIDE1 S T I B N I T E G O L D P R OJ E C T M I N E R A L ENDOWMENT2 WITHIN EXISTING DEPOSITS: 12.0 Million gold ounces Northeast of Yellow Pine Deposit – CTFZ, Homestake, NMCFZ prospects 10.0 Below Hangar Flats Pit & Old Defense Minerals Drill program to establish 1.6 Gold Ex

  18. Slide 18: Exploration Update

    Slide 18: Exploration Update

    EXPLORATION UPDATE More than 16,000 meters of drilling completed in 2026 on targets at Clark Tunnel Fault Zone (CTFZ), Fiddle, Scout, and Hangar Flats New discoveries include high-grade gold- antimony mineralization at Fiddle and a new gold-tungsten discovery at CTFZ Upgraded on-site core cutting an

  19. Slide 19: High-Grade Mineralization Identified Near Yellow Pine Pit

    Slide 19: High-Grade Mineralization Identified Near Yellow Pine Pit

    HIGH-GRADE MINERALIZATION IDENTIFIED NEAR YELLOW PINE PIT (CTFZ, HFZ) The drill program is focused on adding high-grade feed to the front end of the mine plan to sustain high-production years and expand gold and antimony production later in mine life Drilling at Clark Tunnel Fault Zone (CTFZ) return

  20. Slide 20: High-Grade Mineralization Identified Near Yellow Pine Pit

    Slide 20: High-Grade Mineralization Identified Near Yellow Pine Pit

    HIGH-GRADE MINERALIZATION IDENTIFIED NEAR YELLOW PINE PIT (CTFZ, HFZ) Follow-up drilling from the Clark Tunnel Fault Zone (“CTFZ”) continued to demonstrate near-surface, high grades Recent drilling returned: – SB606: 25.4m @ 4.5 g/t Au – SB605: 25.0m @ 2.3 g/t Au* Given its combination of high grade

  21. Slide 21: Additional High-Grade Mineralization Around Hangar Flats Pit

    Slide 21: Additional High-Grade Mineralization Around Hangar Flats Pit

    ADDITIONAL HIGH-GRADE MINERALIZATION AROUND HANGAR FLATS PIT IDENTIFIED Hangar Flats remains open at depth and along strike and is a key focus for the 2026 drill program Recent drilling at Hangar Flats extensions including: SB584: 3.0m @ 14.5 g/t Au* Recent critical mineral-focused drilling** DMEA T

  22. Slide 22: New Gold-Antimony Discovery at Fiddle Prospect

    Slide 22: New Gold-Antimony Discovery at Fiddle Prospect

    NEW GOLD-ANTIMONY DISCOVERY AT FIDDLE PROSPECT BETWEEN YELLOW PINE AND HANGAR FLATS The Fiddle discovery hole is among the most significant mineralized intercepts encountered at the Perpetua site to date and adds a new target area to the Project’s North Tunnel growing in-pit and near-pit resource ba

  23. Slide 23: Mine Sequencing and Production Profile

    Slide 23: Mine Sequencing and Production Profile

    MINE SEQUENCING AND PRODUCTION PROFILE Gold Production and All-in Sustaining Costs Supplementing Production via Exploration* 600 $2,000 $/oz Gold Production, Koz 500 $1,542 $1,511 $1,500 400 $1,281 $1,338 $1,170 Gold Production (Koz) 300 $972 556 $883 Stockpile $1,000 512 447 396 processing All-in S

  24. Slide 24: Thank You

    Slide 24: Thank You

    THANK YOU

  25. Slide 25: Non-GAAP Measures

    Slide 25: Non-GAAP Measures

    NON-GAAP MEASURES This presentation includes disclosure of certain non-GAAP financial measures or ratios, including expected Cash Costs, Total Cash Costs, All-In Sustaining Costs (AISC), All-In Costs (AIC), Average Annual EBITDA and Average Annual Free Cash Flow (FCF) with respect to the expected re