    PERPETUA RESOURCES Investor Presentation - November 2026 T S X : P P TA N A S D AQ : P P TA

  2. Slide 2: Forward-Looking Statements

    Slide 2: Forward-Looking Statements

    FORWARD-LOOKING STATEMENTS Information and statements contained in this presentation that are not historical facts are “forward-looking information” or “forward-looking statements” (collectively, “Forward-Looking Information”) within the meaning of applicable Canadian securities legislation and the

  3. Slide 3: Cautionary Note & Technical Disclosure

    Slide 3: Cautionary Note & Technical Disclosure

    CAUTIONARY NOTE & TECHNICAL DISCLOSURE Cautionary Statement Regarding Reserve and Technical Information The material scientific and technical information in respect of the Stibnite Gold Project in this presentation, unless otherwise indicated, is based upon information contained in the technical rep

  4. Slide 4: Perpetua Resources Poised for Success

    Slide 4: Perpetua Resources Poised for Success

    NASDAQ: PPTA TSX:PPTA PERPETUA RESOURCES POISED FOR SUCCESS Stibnite Gold Project: World class gold-antimony project and national strategic asset with robust investor support Superb Economics1 Exploration Program Showing Critical Minerals Idaho: A Premier Mining High grade open-pit & large gold High

  5. Slide 5: Supportive Shareholder Base

    Slide 5: Supportive Shareholder Base

    SUPPORTIVE SHAREHOLDER BASE Capital Structure 1 Shareholders 2 Research Coverage Agnico Eagle, 6.4% ✓ Issued & Outstanding 125.1 Million Tidal Investments, 4.3% ✓ BMO – Brian Quast BlackRock, 3.7% ✓ Share Units 1.1 Million JPMorganChase, 3.6% ✓ B. Riley Financial – Nick Giles Capital Group, 2.8% ✓ W

  6. Slide 6: Idaho: A Premier Mining Jurisdiction

    Slide 6: Idaho: A Premier Mining Jurisdiction

    IDAHO: A PREMIER MINING JURISDICTION IDAHO ✓ Tier 1 Jurisdiction with low geopolitical risk Idaho silver belt Coeur d’Alene Lucky Friday (Hecla) ✓ Rich history >100 years of gold and critical mineral Golden Chest (Idaho Strategic) mining Sunshine Mine (Sunshine Silver) Galena Complex (Americas Gold

  7. Slide 7: Stibnite Gold Project Site Layout – Federally Permitted

    Slide 7: Stibnite Gold Project Site Layout – Federally Permitted

    STIBNITE GOLD PROJECT SITE LAYOUT – FEDERALLY PERMITTED Three open pits (Yellow Pine, Hangar Flats, West End) and reprocessing of historical tailings Highest grades sequenced at beginning of mine plan to boost project economics Centrally located ore processing plant Geosynthetic-lined tailings stora

  8. Slide 8: Largest Independent U.S. Gold Reserve

    Slide 8: Largest Independent U.S. Gold Reserve

    1 LARGEST INDEPENDENT U.S. GOLD RESERVE 1 Independent Gold Project Mineral Reserves 2 Perpetua (Stibnite) 4.8 Castle Mountain 4.1 3 Marigold 2.8 Round Mountain 1.9 Railroad-Pinion 1.5 Rochester 1.3 DeLamar 1.3 Wharf 1.3 Bald Mountain 1.2 North Bullfrog 1.1 Haile3 0.9 Florida Canyon 0.8 Hasbrouck 0.8

  9. Slide 9: Highest Grade Open Pit Gold Deposit

    Slide 9: Highest Grade Open Pit Gold Deposit

    HIGHEST GRADE OPEN PIT GOLD DEPOSIT1 1 Independent Open Pit Gold Deposits 2 Perpetua (Stibnite) Years 1-4 2.2 Haile3 1.6 2 Perpetua (Stibnite) Yrs LOM 1.4 Round Mountain 1.3 Railroad-Pinion 0.7 Wharf 0.7 Goldfield 0.7 Hasbrouck 0.6 Bald Mountain 0.6 3 Marigold 0.5 Castle Mountain 0.5 North Bullfrog

  10. Slide 10: Poised to Be Largest Independent U.S. Gold Producer

    Slide 10: Poised to Be Largest Independent U.S. Gold Producer

    1 POISED TO BE LARGEST INDEPENDENT U.S. GOLD PRODUCER 1 Independent Projects and Producing Gold Mines 3 Perpetua (Stibnite) Years 1-4 463 3 Perpetua (Stibnite) Yrs LOM 296 Castle Mountain* 220 Bald Mountain 179 Marigold 154 Round Mountain 143 Haile 4 110 Railroad-Pinion* 104 Wharf 97 DeLamar* 91 Mes

  11. Slide 11: Lowest All-In Sustaining Costs

    Slide 11: Lowest All-In Sustaining Costs

    1 LOWEST ALL-IN SUSTAINING COSTS Gold Projects with >150,000 ounce annual production in Tier 1 Jurisdiction 2 All-In Sustaining Costs ($/oz)1,2 Valuable antimony by-product credit of $222/oz over life of mine (assumes $10/lb antimony) Source: Peer data based on latest available company materials as

  12. Slide 12: Mine Sequencing and Production Profile

    Slide 12: Mine Sequencing and Production Profile

    MINE SEQUENCING AND PRODUCTION PROFILE Gold Production and All-in Sustaining Costs Supplementing Production via Exploration* 600 $2,000 $/oz Gold Production, Koz 500 $1,542 $1,511 $1,500 400 $1,281 $1,338 $1,170 Gold Production (Koz) 300 $972 556 $883 Stockpile $1,000 512 447 396 processing All-in S

  13. Slide 13: Stibnite Gold Project Financial Highlights

    Slide 13: Stibnite Gold Project Financial Highlights

    Early STIBNITE GOLD PROJECT Production Life-of-Mine Years 1-15 1,2 Years 1-4 FINANCIAL HIGHLIGHTS Recovered Gold Total Recovered Antimony3 Total 1,852 koz 69 Mlbs 4,223 koz 106 Mlbs 1. For additional information regarding the Technical Report Summary, including underlying assumptions and risks, see

  14. Slide 14: Stibnite Gold Project Cost Summary

    Slide 14: Stibnite Gold Project Cost Summary

    STIBNITE GOLD PROJECT COST SUMMARY1 Early Production Life of Mine Operating Years 1-4 Years 1-15 Capital Costs Initial Sustaining Closure Total Costs CAPEX2 CAPEX CAPEX3 CAPEX US$/st US$/oz US$/st US$/oz (US$M) (US$M) (US$M) (US$M) milled Au milled Au Mining $14.13 $248 $10.78 $295 Direct Costs - Mi

  15. Slide 15: Stibnite Gold Project Financing

    Slide 15: Stibnite Gold Project Financing

    STIBNITE GOLD PROJECT FINANCING Stibnite Gold Project Construction Capital Sources Strategic Investor Warrants Financing Component Cash Incl. Agnico Eagle & U.S. EXIM Senior Secured Loan JPMorganChase $2.9B2 Approved Amount $443M $172M1 ($2.4B of Construction Capital & $0.5B Interest & Fees During C

  16. Slide 16: Stibnite Gold Project Site Update

    Slide 16: Stibnite Gold Project Site Update

    STIBNITE GOLD PROJECT SITE UPDATE Worker Housing Facility First Phase of Construction Complete Worker Housing Facility Worker Housing Facility civil works are complete KDR Facility Foundation installation is complete for kitchen, Dormitories dining and recreation (KDR) facility, arctic corridor and

  17. Slide 17: Powerline Construction Underway

    Slide 17: Powerline Construction Underway

    POWERLINE CONSTRUCTION UNDERWAY Power pole installation has begun Essential items such as power poles and ancillary equipment have been procured and delivered Power pole installation to Perpetua’s laydown areas Powerline construction was initiated in late September, with surveying and staking and pr

  18. Slide 18: Process Plant Engineering & Construction

    Slide 18: Process Plant Engineering & Construction

    PROCESS PLANT ENGINEERING & CONSTRUCTION Site Infrastructure Progress Process Plant and Infrastructure Process plant area Significant portions of the process plant site have been cleared in preparation for civil grading Pre-mobilization spot grading proceeding to ensure construction readiness for th

  19. Slide 19: Perpetua Has Only U.S. Reserve of Antimony, with 149 Mlbs

    Slide 19: Perpetua Has Only U.S. Reserve of Antimony, with 149 Mlbs

    1 PERPETUA HAS ONLY U.S. RESERVE OF ANTIMONY, WITH 149 MLBS ANTIMONY - IT’S CRITICAL World Antimony 2025 Production (USGS)2 ✓ Antimony is essential to industrial and national defense Australia 1.2% Turkey 2.7% Rest of World 2.0% ✓ The United States has no large-scale domestic mined production Burma

  20. Slide 20: Industrial Tungsten Program

    Slide 20: Industrial Tungsten Program

    INDUSTRIAL TUNGSTEN PROGRAM1 Strategic Asset Historical Tungsten Tungsten production at the Stibnite district dates to 1942 and Mining at Stibnite historical records suggest that ~50% of tungsten used by the United States during WWII and the Korean War was sourced from Stibnite2. Export restrictions

  21. Slide 21: Industrial Tungsten Program: Multi-Phase Approach

    Slide 21: Industrial Tungsten Program: Multi-Phase Approach

    INDUSTRIAL TUNGSTEN PROGRAM Multi-phase approach to assessing tungsten opportunity at Stibnite Tungsten program is designed in multiple phases: Phase 1: initial work expected to include exploration drilling, resource definition, metallurgical and processing testing, and underground decline design an

  22. Slide 22: Antimony: Valuable By-Product Credit Provides Further Optionality

    Slide 22: Antimony: Valuable By-Product Credit Provides Further Optionality

    ANTIMONY: VALUABLE BY-PRODUCT CREDIT PROVIDES FURTHER OPTIONALITY TO HIGHER PRICES Stibnite Gold Project Base Case Price Assumption Cash Flow Model Sensitivities* Antimony price ($/lb) $10 $15 $20 $25 By-Product Credit ($ per gold ounce) $222 $331 $439 $547 Illustrative after-tax net present value (

  23. Slide 23: Extensive Exploration Upside

    Slide 23: Extensive Exploration Upside

    EXTENSIVE EXPLORATION UPSIDE1 S T I B N I T E G O L D P R OJ E C T M I N E R A L ENDOWMENT2 WITHIN EXISTING DEPOSITS: 12.0 Million gold ounces Northeast of Yellow Pine Deposit – CTFZ, Homestake, NMCFZ prospects 10.0 Below Hangar Flats Pit & Old Defense Minerals Drill program to establish 1.6 Gold Ex

  24. Slide 24: Exploration Update

    Slide 24: Exploration Update

    EXPLORATION UPDATE More than 16,000 meters of drilling completed in 2026 on targets at Clark Tunnel Fault Zone (CTFZ), Fiddle, Scout, and Hangar Flats New discoveries include high-grade gold- antimony mineralization at Fiddle and a new gold-tungsten discovery at CTFZ Upgraded on-site core cutting an

  25. Slide 25: High-Grade Mineralization Identified Near Yellow Pine Pit

    Slide 25: High-Grade Mineralization Identified Near Yellow Pine Pit

    HIGH-GRADE MINERALIZATION IDENTIFIED NEAR YELLOW PINE PIT (CTFZ, HFZ) The drill program is focused on adding high-grade feed to the front end of the mine plan to sustain high-production years and expand gold and antimony production later in mine life Drilling at Clark Tunnel Fault Zone (CTFZ) return

  26. Slide 26: Additional High-Grade Mineralization Around Hangar Flats Pit

    Slide 26: Additional High-Grade Mineralization Around Hangar Flats Pit

    ADDITIONAL HIGH-GRADE MINERALIZATION AROUND HANGAR FLATS PIT IDENTIFIED Hangar Flats remains open at depth and along strike and is a key focus for the 2026 drill program Recent drilling at Hangar Flats extensions including: SB584: 3.0m @ 14.5 g/t Au* Recent critical mineral-focused drilling** DMEA T

  27. Slide 27: New Gold-Antimony Discovery at Fiddle Prospect

    Slide 27: New Gold-Antimony Discovery at Fiddle Prospect

    NEW GOLD-ANTIMONY DISCOVERY AT FIDDLE PROSPECT BETWEEN YELLOW PINE & HANGAR FLATS The Fiddle discovery hole is among the most significant mineralized intercepts encountered at the Perpetua site to date and adds a new target area to the Project’s North Tunnel growing in-pit and near-pit resource base

  28. Slide 28: Illustrative Equity Valuation Once in Production

    Slide 28: Illustrative Equity Valuation Once in Production

    ILLUSTRATIVE EQUITY VALUATION ONCE IN PRODUCTION Illustrative Equity Valuation as of Year 1 of Operations* +266% $14.0 +211% Illustrative Equity Valuation as of $12.0 +156% Year 1 of Operations ($B) $10.0 $8.2 $8.0 $7.0 $5.8 $6.0 $4.0 $2.2 $2.0 $0.0 PPTA Market Cap $4,000/oz $4,500/oz $5,000/oz Gold

  29. Slide 29: Unlocking Value Through Development

    Slide 29: Unlocking Value Through Development

    UNLOCKING VALUE THROUGH DEVELOPMENT ARTEMIS SHARE PRICE PERFORMANCE G MINING SHARE PRICE PERFORMANCE SKEENA SHARE PRICE PERFORMANCE C$/share C$/share C$/share $45.00 $50.00 $45.00 $44.81 $40.53 $40.00 $38.36 $45.00 $40.00 +476% $40.00 +1,456% +593% $35.00 $35.00 $35.00 $30.00 $30.00 $30.00 $25.00 $2

  30. Slide 30: Gaining Momentum with Recent Catalysts

    Slide 30: Gaining Momentum with Recent Catalysts

    1,2 GAINING MOMENTUM WITH RECENT CATALYSTS KEY STIBNITE GOLD MILESTONES: KEY STIBNITE GOLD PROJECT CATALYSTS: ✓ Selected as Priority Project by White House (Apr 2025) ✓ Final Record of Decision (Jan 2025) and Final Federal Permit (May ✓ Received Preliminary Project Letter and Indicative Term Sheet 2

  31. Slide 31: Appendix

    Slide 31: Appendix

    APPENDIX

  32. Slide 32: Leading Perpetua Forward

    Slide 32: Leading Perpetua Forward

    LEADING PERPETUA FORWARD Leader Biography Experience & Expertise • 35+ years of experience developing mining projects, including extensive U.S. permitting ✓ U.S. Permitting Jon Cherry experience President, ✓ Stakeholder Relations CEO & Director • Most recently served as Chairman, President and CEO o

  33. Slide 33: Key Development Team Leaders

    Slide 33: Key Development Team Leaders

    KEY DEVELOPMENT TEAM LEADERS Team lead Prior Experience Experience & Expertise 25+ years of project construction and engineering, delivering large-scale projects in the U.S., ✓ Project Development Jim Norine Sr. VP, Projects recent roles include Regional Director at Hatch (including Hermosa Project

  34. Slide 34: Experienced Board of Directors

    Slide 34: Experienced Board of Directors

    EXPERIENCED BOARD OF DIRECTORS Board of Directors Prior Experience Experience & Expertise • Joined Perpetua as Director in 2016 and became Chair in 2020. Partner at Paulson & Co., Perpetua’s largest investor. ✓ Executive Leadership Marcelo Kim • Oversees Paulson & Co.’s global macro-economic and nat

  35. Slide 35: Improving a Legacy

    Slide 35: Improving a Legacy

    IMPROVING A LEGACY P R OJ E C T M I N E P L A N D E S I G N E D W I T H P O ST M I N I N G R E STO R AT I O N G OA L S I N M I N D • Address historical impacts from legacy mining incl. sedimentation repair and reprocessing 10.5M tons of tailings • Support a self-sustaining natural environment • Rein

  36. Slide 36: Ore Processing - Gold & Antimony

    Slide 36: Ore Processing - Gold & Antimony

    ORE PROCESSING-GOLD & ANTIMONY Crushing, SAG FLOW SHEET & Ball Milling High Sb Antimony Stibnite Flotation Sulfide Concentrate Low Sb Sulfide Pyrite Flotation Oxide Transitiona POX l Residuals Gold Leach Electrowinning Dore The information in this presentation is subject to the assumptions, exclusio

  37. Slide 37: Non-GAAP Measures

    Slide 37: Non-GAAP Measures

    NON-GAAP MEASURES This presentation includes disclosure of certain non-GAAP financial measures or ratios, including expected Cash Costs, Total Cash Costs, All-In Sustaining Costs (AISC), All-In Costs (AIC), Average Annual EBITDA and Average Annual Free Cash Flow (FCF) with respect to the expected re

  38. Slide 38: Thank You

    Slide 38: Thank You