Cyprium Metals Limited · ASX:CYM
Cyprium Metals — Investor Presentation (December 2021)
19 slides from Cyprium Metals's investor presentation, Dec 6, 2021
Slide 1: Building an Australian Copper Company
BUILDING AN AUSTRALIAN COPPER COMPANY CYM Investor Webinar December 2021 ASX: CYM 1
Slide 2: Important Notices and Disclaimer
Important Notices and Disclaimer IMPORTANT: You must read the following before continuing. This investor presentation (“Presentation”) has been prepared by Cyprium Metal s Limited (ABN 48 002 678 640) (“Cyprium” or “Company”). Summary information By reviewing or retaining these materials, or attendi
Slide 3: Cyprium Investment Overview
Cyprium Investment Overview Cyprium Metals – Building an Australian Copper Company ASX listed, West Australian focused copper developer and explorer Near term copper producer - heap leach operation targeting H1 2023 commissioning Portfolio of development opportunities with over +1.2Mt1 of contained
Slide 4: Corporate Overview
Corporate Overview Focused on building a mid-tier Australian copper mining business • Cyprium Metals (ASX:CYM) is an Australian copper developer and explorer Share Price Performance (as of 1/12/21) • Owns a portfolio of near-term development projects focussed in Western Australia $0.40 45 • Highly c
Slide 5: Board and Management
Board and Management A strong management team with experience in technically assessing, financing, building and operating successful copper mines Gary Comb Barry Cahill Nicholas Rowley Wayne Apted Peter van Luyt Non-Executive Chairman Managing Director Non-Executive Director CFO & Company Secretary
Slide 6: Nifty Copper Mine
Nifty Copper Mine Cyprium is focused on a near-term heap leach production strategy • Substantial Oxide and Sulphide Mineral Resource of over 732,000 tonnes of copper 1 which remains open • Discovered by WMC in 1981 with open pit and heap leach operation exploiting oxides commencing in 1993 • Since c
Slide 7: Nifty | Operational Update
Nifty | Operational Update Site activities at Nifty continue to accelerate towards production • Since completing the acquisition on 30 March 2021, Cyprium has rapidly advanced Nifty towards production • Significant work has been undertaken to proceed towards development and production ✓ Drill and ex
Slide 8: Nifty | Refurbishment has begun
Nifty | Refurbishment has begun Assessment and refurbishment of existing assets has commenced in anticipation of the start of construction Upgraded planes for expanded workforce Refurbishment of SX Native Copper from Heap RC Drill on Pit Edge and Refurbishment of SX in background 8
Slide 9: Nifty | Site Layout & Active Areas
Nifty | Site Layout & Active Areas Tailings Dam Waste Dumps Western Drill Program Mine Village Eastern Drill Program Sterilisation Drill Program Airstrip SXEW Plant Sonic Drilling of Heap Leach Pads 9
Slide 10: Nifty | Resource Expansion Drilling
Nifty | Resource Expansion Drilling Material drilling programs have expanded current resources and increased confidence • Resource Expansion Drilling continuing at Nifty − +20,000m of drilling already completed that successfully tested the expansion potential of the mineralisation − Current programm
Slide 11: Nifty | Optimising the Metallurgy
Nifty | Optimising the Metallurgy Optimising a Heap Leach that has successfully produced more than 200kt of Copper • Multiple work streams are underway to optimise Nifty Heap Leach Metallurgy − Utilising a significant amount of historical data − Applying modern techniques to a proven process • Bulk
Slide 12: Nifty | Project Timeline
Nifty | Project Timeline H2 2023 Production of copper plate H2 2022 Construction • Commissioning complete •Approvals finalised • Production ramp up H2 2021 •Construction commences Restart Study and Finance •Earthworks commences •Resource Review and Update •Mining pre-strip commences •Resource Drilli
Slide 13: Cyprium | Working to the Strategy
Cyprium | Working to the Strategy Cyprium has completed the ground work to build a mid tier copper company • Nifty progressing at an accelerated rate to production ✓ Mineral Resource expanding – +10,000 assays yet to be included +10,000 assays outstanding ✓ Metallurgical optimisation ongoing – core
Slide 14: Murchison Copper Project
Murchison Copper Project Hollandaire and Nanadie Well are complementary deposits that comprise the Murchison Copper Project • Murchison Copper Project is a resource development opportunity • Continued drilling success at Nanadie Well will form part of a Maiden JORC 2012 Mineral Resource Estimate, wh
Slide 15: Nanadie Well | A Sleeper
Nanadie Well | A Sleeper Cyprium continues to delineate extensive, shallow and broad copper-gold mineralisation • Highlights from the recent drill campaign include; − 143.8m @ 0.7% Cu from 25.0m in NWD2004 including: − 232m @ 0.4% Cu from 109.0m in NWD2001 including: • 2.5m at 2.1% Cu from 77.8m inc
Slide 16: Maroochydore Copper Project
Maroochydore Copper Project Potential to unlock value from a substantial copper resource • Diamond drilling completed for metallurgical testwork • Substantial shallow Oxide and Sulphide Mineral Resource of over 480,000 tonnes of copper1: − Originally discovered in 1984 − Mineralisation remains open
Slide 17: Paterson Exploration Project
Paterson Exploration Project Premier exploration destination in Australia - Cyprium leveraged to exploration success via Joint Venture with IGO • Exploration season has commenced, IGO Ltd (ASX: IGO) are completing; • Large regional soil sampling program • Air-core drilling of priority targets − Larg
Slide 18: Mineral Resource Estimate / Competent Persons Statement
Mineral Resource Estimate /Competent Persons Statement HOLLANDAIRE - 2012 JORC MINERAL RESOURCE ESTIMATE 1 NIFTY COPPER OPERATION - MINERAL RESOURCE ESTIMATE AT NOVEMBER 2021 2 Resource Ore C ut - O f f M e a s ure d Indic a t e d Inf e rre d T o tal Material type Volume Tonnes Cu % Cu Tonnes Au g/t
Slide 19: Cyprium Metals Limited
Cyprium Metals Limited 1 / 437 Roberts Road Subiaco WA 6008 T +61 8 6374 1550 E info@cypriummetals.com
Cyprium Metals — Investor Presentation (December 2021) on 6ix