West Vault Mining Inc · TSXV:WVM
West Vault Mining — Investor Presentation (April 2026)
24 slides from West Vault Mining's investor presentation, April 2026
Slide 1: A Great Project Needs a Solid Gold Strategy
a GREAT PROJECT needs A SOLID GOLD STRATEGY Sandy McVey, CEO 1 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF April 2026 smcvey@westvaultmining.com +1-778 388 2464
Slide 2: Compliance with NI 43-101 and Cautionary Statements
Compliance with NI 43-101 and Cautionary Statements Hasbrouck Project Pre-Feasibility Study, and Mineral Resource and Mineral Reserve Estimates. Certain information in this presentation has been taken from West Vault Mining’s news release of January 23 rd, 2023, “West Vault Mining Announces 51% IRR
Slide 3: Forward-looking Statements and Cautionary Note to US Investors
Forward-looking Statements and Cautionary Note to US Investors Forward-looking Information. This presentation contains forward-looking information or forward-looking statements (collectively, “forward-looking information”) within the meaning of applicable securities laws. Forward-looking information
Slide 4: Investment Highlights
Investment Highlights Hasbrouck Gold Project • A simple, ready-to-build project in Nevada, 100% owned • Strong economics (110% after-tax IRR at US$2,600 gold)* • Low corporate overhead, frugal management • High insider ownership (48%) • Patience is key - build or sell only when the time is right * S
Slide 5: Strong Economics (2023 Pre-Feasibility Study)
Strong Economics (2023 Pre-Feasibility Study) Gold production* - 71,000 oz/year for 8 years Initial Capex* - US$66M All-in Sustaining Cost* - US$877/oz IRR, after-tax ($2,600 gold)* - 110% NPV (5%) ($2,600 gold)* - US$503M * Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbr
Slide 6: Hasbrouck - both Profitable, and Highly Sensitive to Gold Price
Hasbrouck - both Profitable, and Highly Sensitive to Gold Price See cautionary language about the Technical High leverage to Report on page 2 Source – “Technical Report and Updated gold price Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– Wil
Slide 7: Big Money Supports Our Gold-in-Ground Strategy
Big Money Supports Our Gold-in-Ground Strategy 72% INSTITUTIONALLY HELD Sun Valley Gold 46% Ruffer 17% Eric Sprott 5% Konwave AG (Gold 2000) 4% Management & Insiders 1.6% Sandy McVey, CEO 7 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcvey@westvaultmining.com +1-778 388 2464
Slide 8: Market Positioning
Market Positioning • Unique Property - not many permitted, construction- ready gold developers in Nevada • Minimal risk - pending decision to build or sell • Strong visibility with gold-focused funds, long-term investors • No legacy liabilities or third-party encumbrances Sandy McVey, CEO 8 www.west
Slide 9: Possible Catalysts
Possible Catalysts • Higher gold price drives value accretion • Exploration on and near property, by us or others • Potential strategic partner or financing alternatives • Potential M&A Sandy McVey, CEO 9 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcvey@westvaultmining.com +1-778 388 2464
Slide 10: Capital Structure
Capital Structure Shares Outstanding 58M Market Cap US$84M Cash US$1.6M Debt None Low overhead US $1M/year Sandy McVey, CEO 10 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcvey@westvaultmining.com +1-778 388 2464
Slide 11: Why Invest Now
Why Invest Now 1. Undervalued against peers 2. Low-risk strategy – sell or build only at right time 3. Disciplined management 100% aligned with shareholders 4. Poised for re-rating as market recognizes upside potential Sandy McVey, CEO 11 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcvey@westvaul
Slide 12: Thank you
Thank you Sandy McVey, CEO & COO, M.Sc., P.Eng, PMP smcvey@westvaultmining.com P: 778 388 2464 TF: 1-866-899-5450 838 – 1100 Melville Street Vancouver, BC V6E 4A6 www.westvaultmining.com Sandy McVey, CEO 12 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcvey@westvaultmining.com +1-778 388 2464
Slide 13: Additional information
Additional information Sandy McVey, CEO 13 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcvey@westvaultmining.com +1-778 388 2464
Slide 14: Experienced, successful leadership
Experienced, successful leadership Peter Palmedo Pierre Lebel, MBA Priscila Costa Lima, Frank Hallam, BBA, CA Sandy McVey, Stephen Quin, BSc, P.Geo LLB BBA, CPA, CMA P.Eng, PMP Chairman and Director Independent Director Independent Director Director, CFO and Corporate CEO and COO Independent Advisor
Slide 15: Company Data
Company Data Stock symbol TSXV: WVM OTCQX:WVMDF US$1.6m cash on hand C$1.98 Share price (April 7, 2026) - no dilution for approximately 2 52-week high / low C$1.08 / C$2.79 years Issued & outstanding 58,075,566 Options 1,747,331 Restricted Share Units 182,900 Fully diluted 60,005,797 Deferred Share
Slide 16: First Pit - Simple, Profitable!
First Pit - Simple, Profitable! 71,000 oz per year Modest initial capital (US$66M, 2023 study) No pre-strip, 0.9:1 strip ratio Run-of-mine heap leach Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Generates cash to build Hasbrouck Mine Three Hills Gold-Silver Pro
Slide 17: First Pit Layout
First Pit Layout Simple, quick - no gold plant, contractor mining ~12 months to first gold pour Admin & assay lab in Tonopah – 1 mile Grid power - 0.2 mile On-site ground water Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmera
Slide 18: First Pit - Strong Exploration Potential
First Pit - Strong Exploration Potential* Four targets Extensions to known mineralization Open high-grade corridors Potential high-grade structures See cautionary language about exploration targets on Slide 2 Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three H
Slide 19: Second Pit – Simple, Profitable!
Second Pit – Simple, Profitable! 71,000 oz per year Little pre-strip, 1.2:1 strip ratio Strong expansion potential Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– produced by RESPEC, January 2023, with co
Slide 20: Second Pit – Layout
Second Pit – Layout ~18 months to build Easy road access Grid power On-site water Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– produced by RESPEC, January 2023, with contributions from Thomas Dyer, P.E
Slide 21: Second Pit - Strong Exploration Potential
Second Pit - Strong Exploration Potential* Three centres of mineralization 12,000 acres with exploration potential Hill of Gold – an upside opportunity All necessary infrastructure nearby * See cautionary language about exploration targets on Slide 2 Sandy McVey, CEO 21 www.westvaultmining.com TSXV:
Slide 22: 2023 Pre-feasibility summary
2023 Pre-feasibility summary See cautionary language on Mineral Reserves on Page 2 Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– produced by RESPEC, January 2023, with contributions from Thomas Dyer, P.
Slide 23: Mineral Resource
Mineral Resource (Includes Reserve) See cautionary language on Mineral Reserves on Page 2 Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– produced by RESPEC, January 2023, with contributions from Thomas D
Slide 24: Mineral Reserve
Mineral Reserve (included in Measured and Indicated Resource) 1. The estimation and classification of proven and probable reserves was prepared in accordance with CIM standards by Thomas L. Dyer P.E. of Mine Development Associates, who is the independent qualified person for this Reserve statement.
West Vault Mining — Investor Presentation (April 2026) on 6ix