  1. Slide 1: Right Project - Right Team - Right Strategy

    RIGHT PROJECT - RIGHT TEAM - RIGHT STRATEGY Sandy McVey, CEO 1 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF September 2026 smcvey@westvaultmining.com +1-778 388 2464

  2. Slide 2: Compliance with NI 43-101 and Cautionary Statements

    Compliance with NI 43-101 and Cautionary Statements Hasbrouck Project Pre-Feasibility Study, and Mineral Resource and Mineral Reserve Estimates. Certain information in this presentation has been taken from West Vault Mining’s news release of January 23 rd, 2023, “West Vault Mining Announces 51% IRR

  3. Slide 3: Forward-looking Statements and Cautionary Note to US Investors

    Forward-looking Statements and Cautionary Note to US Investors Forward-looking Information. This presentation contains forward-looking information or forward-looking statements (collectively, “forward-looking information”) within the meaning of applicable securities laws. Forward-looking information

  4. Slide 4: First - Get the Right Project

    FIRST - GET THE RIGHT PROJECT 4

  5. Slide 5: Right Location

    Right Location Nevada - the top mining address • Ranked #1 in investment attractiveness globally by Fraser Institute* • Ranked #4 in gold production globally** • Intersection of two prolific gold trends • Tonopah – a pro-mining town * Fraser Institute Annual Survey of Mining Companies, 2026 ** Nevad

  6. Slide 6: Right Physical Attributes

    Right Physical Attributes Three Hills Mine Deposits Two hills, 5 miles apart Geology + 600 boreholes, all-oxide 1:1.1 Strip Ratio, above Hasbrouck Mine Mining water table 13 test programs, 75% Metallurgy recovery Process Heap Leach Source – “Technical Report and Updated Preliminary Feasibility Study

  7. Slide 7: First Pit Layout / Second Pit Layout

    First Pit Layout Second Pit – Layout Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– produced by RESPEC, January 2023, with contributions from Thomas Dyer, P.E., J. Bickel, C.P.G., Mark Jorgensen, R.M., S

  8. Slide 8: Strong Metrics

    Strong Metrics Status - Permitted, ready-to-build Gold production* - 561,000 oz over 8 years Initial Capex* - US $66M All-in Sustaining Cost* - US $877/oz IRR, after-tax ($2,600 gold)* - 110% NPV (5%) ($2,600 gold)* - US $503M * Source – “Technical Report and Updated Preliminary Feasibility Study: H

  9. Slide 9: High Leverage to Gold Price

    High Leverage to Gold Price See cautionary language about the Technical High leverage to Report on page 2 Source – “Technical Report and Updated gold price Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– Will re-rate as produced by RESPEC, Jan

  10. Slide 10: Second - Get the Right Team

    SECOND - GET THE RIGHT TEAM 10

  11. Slide 11: Leadership & Management

    Leadership & Management Peter Palmedo Pierre Lebel, MBA Priscila Costa Lima, Frank Hallam, BBA, CA Sandy McVey, Stephen Quin, BSc, P.Geo LLB BBA, CPA, CMA P.Eng, PMP Chairman and Director Independent Director Independent Director Director, CFO and Corporate CEO and COO Independent Advisor Secretary

  12. Slide 12: Big Money Supports Our Thesis

    Big Money Supports Our Thesis 72% INSTITUTIONALLY HELD, 48% INSIDERS Sun Valley Gold 46% Ruffer 17% Eric Sprott 5% Konwave AG (Gold 2000) 4% Management & Insiders 2% Sandy McVey, CEO 12 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcvey@westvaultmining.com +1-778 388 2464

  13. Slide 13: Third – Get the Right Strategy

    THIRD – GET THE RIGHT STRATEGY 13

  14. Slide 14: Our Strategy

    Our Strategy • We believe we are in a long-term secular gold bull market • Accordingly, we hold and acquire ready-to-build, profitable, safe gold in Nevada • We are patient and risk-averse – we will only build or sell when it is most beneficial to our shareholders Sandy McVey, CEO 14 www.westvaultmi

  15. Slide 15: West Vault Capital Structure

    West Vault Capital Structure Shares Outstanding 58M Market Cap US$84M Cash US$1.1M Debt None Low overhead US $1M/year Sandy McVey, CEO 15 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcvey@westvaultmining.com +1-778 388 2464

  16. Slide 16: Peer Comparison

    Peer Comparison P/NAV Typical permitted projects in good jurisdictions 0.45 x* Typical projects at first-pour-of-gold 1.0 x* Versus WVM – construction-ready, under-valued 0.14 x** * Market Multiples of Preproduction Gold Projects as of Sep 1 2021” – Joel Schneyer, Capstone Partners, presentation to

  17. Slide 17: Possible Catalyst

    Possible Catalyst • Higher gold price drives further value accretion – hold • Exploration on and near property, by us or others – enhance • Possible strategic partner or financing alternatives - transact • Possible M&A – transact Sandy McVey, CEO 17 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcv

  18. Slide 18: Summary

    Summary • Unique Property - simple project, robust economics, construction-ready, Nevada • Low risk – hold, pending decision to build or sell at right time • Strong support from gold-focused funds, long-term investors • No legacy liabilities or third-party encumbrances Sandy McVey, CEO 18 www.westva

  19. Slide 19: Thank you

    Thank you Sandy McVey, CEO & COO, M.Sc., P.Eng, PMP smcvey@westvaultmining.com P: 778 388 2464 TF: 1-866-899-5450 838 – 1100 Melville Street Vancouver, BC V6E 4A6 www.westvaultmining.com Sandy McVey, CEO 19 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcvey@westvaultmining.com +1-778 388 2464

  20. Slide 20: Additional information

    Additional information Sandy McVey, CEO 20 www.westvaultmining.com TSXV: WVM OTCQX:WVMDF smcvey@westvaultmining.com +1-778 388 2464

  21. Slide 21: Company Data

    Company Data Stock symbol TSXV: WVM OTCQX:WVMDF US$1.1m cash on hand C$1.76 Share price (September 10, 2026) 52-week high / low C$1.32 / C$2.79 Issued & outstanding 58,075,566 Options 1,747,331 Restricted Share Units 182,900 Fully diluted 60,005,797 Deferred Share Units 168,455 Market capitalization

  22. Slide 22: Hasbrouck Project in Nevada

    Hasbrouck Project in Nevada Three centres of mineralization 12,000 acres with exploration potential Hill of Gold – a small upside opportunity All necessary infrastructure nearby * See cautionary language about exploration targets on Slide 2 Sandy McVey, CEO 22 www.westvaultmining.com TSXV: WVM OTCQX

  23. Slide 23: First Pit - Simple, Profitable!

    First Pit - Simple, Profitable! 71,000 oz per year Modest initial capital (US$66M, 2023 study) No pre-strip, 0.9:1 strip ratio Run-of-mine heap leach Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Generates cash to build Hasbrouck Mine Three Hills Gold-Silver Pro

  24. Slide 24: First Pit Layout

    First Pit Layout Simple, quick - no gold plant, contractor mining ~12 months to first gold pour Admin & assay lab in Tonopah – 1 mile Grid power - 0.2 mile On-site ground water Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmera

  25. Slide 25: First Pit - Strong Exploration Potential

    First Pit - Strong Exploration Potential* Four targets Extensions to known mineralization Open high-grade corridors Potential high-grade structures See cautionary language about exploration targets on Slide 2 Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three H

  26. Slide 26: Three Hills Mine eastern expansion

    First pit - first 2 years Three Hills Mine eastern expansion from to intercept Au HOLE m m m g/t TH12R15 93 160 67 3.2 TH14MW-1 55 95 40 1.4 TH14R-007 107 125 18 1.5 TH14R-002 162 175 14 0.6 TH14R-003 145 175 30 0.5 TH14R-004 171 223 52 0.7 TH14R-005 180 192 12 0.6 TH14R-008 131 139 8 0.5 TH14R-008

  27. Slide 27: Second Pit – Simple, Profitable!

    Second Pit – Simple, Profitable! 71,000 oz per year Little pre-strip, 1.2:1 strip ratio Strong expansion potential Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– produced by RESPEC, January 2023, with co

  28. Slide 28: Second Pit – Layout

    Second Pit – Layout ~18 months to build Easy road access Grid power On-site water Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– produced by RESPEC, January 2023, with contributions from Thomas Dyer, P.E

  29. Slide 29: Hasbrouck Mine - strong expansion potential

    Second pit - final 6 years Hasbrouck Mine - strong expansion potential Multiple on-property exploration targets See cautionary language about exploration targets on Slide 2 29

  30. Slide 30: Hasbrouck Mine root potential

    Structural Second pit - final 6 years stratigraphic controls West high grade Hasbrouck Mine 39 m of 4.8 g/t Au Structural intersections creating high grade root potential Walker Lane structure exiting pit High-grade epithermal heater Structural intersection system controls high grade 5 m of 11.3 g/t

  31. Slide 31: 2023 Pre-feasibility summary

    2023 Pre-feasibility summary See cautionary language on Mineral Reserves on Page 2 Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– produced by RESPEC, January 2023, with contributions from Thomas Dyer, P.

  32. Slide 32: Mineral Resource

    Mineral Resource (Includes Reserve) See cautionary language on Mineral Reserves on Page 2 Source – “Technical Report and Updated Preliminary Feasibility Study: Hasbrouck and Three Hills Gold-Silver Project, Esmeralda County, Nevada”– produced by RESPEC, January 2023, with contributions from Thomas D

  33. Slide 33: Mineral Reserve

    Mineral Reserve (included in Measured and Indicated Resource) 1. The estimation and classification of proven and probable reserves was prepared in accordance with CIM standards by Thomas L. Dyer P.E. of Mine Development Associates, who is the independent qualified person for this Reserve statement.