Us1 Critical Minerals Limited · ASX:USC

Us1 Critical Minerals — Gladiator Resources — Investor Presentation (July 2025)

18 slides from Us1 Critical Minerals's investor presentation, July 2025

  1. Slide 1: Corporate Presentation July 2025

    C O R P O R AT E P R E S E N TAT I O N July 2025 – ASX: GLA

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared and issued Gladiator Resources Limited (the “Company") to inform interested parties about the Company and its progress. The material contained in this presentation sets out general background information on the Company and its activities. It does not co

  3. Slide 3: Uranium is the Future – and many countries are realizing this

    Uranium is the Future – and many countries are realizing this 60 New nuclear plants under construction CORPORATE PRESENTATION in 15 countries Spot Uranium price USD/lb v Uranium is settling above USD70/lb and on an upward trend driven by a supply gap ASX:GLA v 3

  4. Slide 4: Investment Summary

    Investment Summary • Uranium focused ASX-listed explorer • 1320 km2 under license in Tanzania • Permits within the proven Selous Basin (Karoo CORPORATE PRESENTATION Supergroup) of Tanzania • Mkuju Project is in same basin as nearby Uranium One’s 125 Mlb (U3O8) Nyota deposit1. • Mkuju incudes the 4.6

  5. Slide 5: Mkuju Project – at the heart of Tanzania's uranium province

    Mkuju Project – at the heart of Tanzania’s uranium province • 725km2 area 20km south of Uranium One’s massive Nyota deposit. Nyota Deposit • Sediments of the lower Karoo. These rocks host 125Mlb southern Africa’s sandstone hosted uranium deposits: U3O8*4 CORPORATE PRESENTATION o Kyelekera, Malawi (4

  6. Slide 6: Likuyu North Deposit

    Example uranium mineralised interval from Likuyu North (U3O8ppm) Likuyu North Deposit • JORC MRE of 7.7 Mt with an average grade of 267ppm U3O8 containing 4.6 Mlbs U3O8, within a ‘pit-shell’. CORPORATE PRESENTATION • Up to 8 extensive ‘stacked’ layers, gently dipping, hosted by permeable coarse- gra

  7. Slide 7: Likuyu North – Suited to In Situ Recovery (ISR)

    Likuyu North – Suited to In Situ Recovery (ISR) o Study by ERM (Perth) completed Nov 2024 indicates that Likuyu North is favorable for mining by ISR. o The geological and hydrogeological characteristics of the deposit appear to be ideally suited o ISR may ‘unlock’ the deposit as smaller deposits can

  8. Slide 8: Likuyu North Deposit Exploration

    *Grades are equivalent uranium (denoted by the prefix ‘e’). The gamma-ray tool is calibrated Likuyu North Deposit Exploration but may be subject to ‘radiogenic disequilibrium’ which can lead to overstatement or understatement of grade. Laboratory analyses are planned to be carried as verification ch

  9. Slide 9: SWC-Mtonya corridor and Likuyu South

    *Refer to GLA announcement dated 21 August 2023 SWC-Mtonya corridor and Likuyu South o Two 10-15 km long corridors with abundant uranium showings. o Likuyu South: Some drilling completed by Uranex pre-2013 but CORPORATE PRESENTATION needs further work, not tested by Gladiator. o Mtonya-SWC corridor.

  10. Slide 10: SWC-Mtonya corridor

    SWC-Mtonya corridor o Exploration to date has targeted the areas with surface uranium, possibly the tail and lateral zones. o Future focus should be at the SW end of the corridor targeting a classic nose ore zone. o Drilling on fence lines is recommended – low-cost drilling and downhole logging to m

  11. Slide 11: SWC target

    *Refer to GLA announcement dated 15 August 2024 SWC target o 2024 drilling suggests it is at the ‘tail’ of the system, High grade material at/near surface are the remains of a layer which is partially eroded and has been upgraded by supergene processes. SWC 2024 drilling highlights * o Focus should

  12. Slide 12: SWC-Mtonya roll-front model

    SWC-Mtonya roll-front model o A working model whereby the regional dip and the direction of groundwater flow is NE to SW. If there is a full roll-front nose zone then it may be expected in the southwest, beyond the Henri prospect? o Interpretation is that the primary uranium at the mid-sections of M

  13. Slide 13: Likuyu South – no work since 2009 despite positive indications

    Likuyu South – no work since 2009 despite positive indications o 10 km inferred redox front. Surface uranium may be the surficial remnants (behind the CORPORATE PRESENTATION present-day front, as per SWC- Mtonya model) o Four 2008 RC holes included 4m@167ppm U3O8 and 3m@156ppm U3O8 but not followed

  14. Slide 14: Eland – Early stage Niobium-Tantalum-Uranium project

    Eland – Early stage Niobium-Tantalum-Uranium project • Large quartz syenite intrusion with pyrochlore mineralisation. • Channel samples along line ELAND C3 indicate a 44m wide zone with an average of 174ppm U3O8, 953ppm Nb205 and 133ppm Ta2O51. CORPORATE PRESENTATION Map showing 2024 channel sample

  15. Slide 15: Foxy Project – Needs step-out drilling

    Foxy Project – Needs step-out drilling • 2025 radiometric survey revealed highly mineralized sandstones1. • Drilling of 19 holes by Western Metals Limited in 2008. No drilling since. • FRC014 intersected 6m with average of 213ppmU3O8 (by assay) including 2m with 405ppmU3O8. • Most holes ended at 70m

  16. Slide 16: Mineral Resource Estimates for Mkuju Project

    Mineral Resource Estimates for Mkuju Project JORC MRE for the Likuyu North Deposit • Reported in accordance with the JORC Code Grade Contained 100 pm U3O8 cut off Tonnes (millions) • Effective date 27 April 2022 U3O8 ppm U3O8 Mlbs • Note that these are not in addition to each other, the 200ppm cut-o

  17. Slide 17: Appendix - Board of Directors

    Appendix - Board of Directors Matthew Boysen – Non-Executive Chairman Matthew is a self-made sophisticated investor, owning and operating a highly successful retail business that has and continues to experience exponential growth on an annual basis. He has substantial marketing and communication exp

  18. Slide 18: Thank You

    THANK YOU Suite 1, Level 11, 1 Castlereagh St, Sydney NSW 2000 www.gladiatorresources.net Email: info@gladiatorresources.net

Gladiator Resources — Investor Presentation (July 2025) on 6ix