Slide 1: Corporate Presentation
C O R P O R AT E P R E S E N TAT I O N November 2024 – ASX: GLA
Slide 2: Disclaimer
Disclaimer This presentation has been prepared and issued Gladiator Resources Limited (the “Company") to inform interested parties about the Company and its progress. The material contained in this presentation sets out general background information on the Company and its activities. It does not co
Slide 3: Gladiator Board of Directors
Gladiator Board of Directors • Previous Board replaced in July 2022 to re-focus and increase the Company’s activities. • The board brings specific uranium mining and exploration experience, and a successful African operational record. CORPORATE PRESENTATION Greg Johnson [ AUSTRALIA ] NON-EXECUTIVE C
Slide 4: Uranium is the Future – and many countries are realizing this
Uranium is the Future – and many countries are realizing this 60 New nuclear plants under construction CORPORATE PRESENTATION in 15 countries Spot Uranium price USD/lb Uranium price is likely to remain >80USD/lb 80 Uranium gaining 400 strength, prices up % >400% since 2018 ASX:GLA and steadily risin
Slide 5: Investment Summary
Investment Summary • Uranium focused ASX-listed explorer • 1320 km2 under license in Tanzania CORPORATE PRESENTATION • Permits within the proven Selous Basin (Karoo Supergroup) of Tanzania • Mkuju is in same basin as nearby Uranium One’s 125 Mlb (U3O8) Nyota deposit1 • Gladiators 4.6 Mlb Likuyu Nort
Slide 6: Mkuju Project – at the heart of Tanzania's uranium province
Mkuju Project – at the heart of Tanzania’s uranium province • 725km2 area 20km south of Uranium One’s massive Nyota deposit. Nyota Deposit • Sediments of the lower Karoo. These rocks host 125Mlb southern Africa’s sandstone hosted uranium deposits: U3O8*4 CORPORATE PRESENTATION o Kyelekera, Malawi (4
Slide 7: Likuyu North Deposit
Likuyu North Deposit Example uranium mineralised interval from Likuyu North (U3O8ppm) • JORC MRE of 7.7 Mt with an average grade of 267ppm U3O8 containing 4.6 Mlbs U3O8, within a ‘pit-shell’. CORPORATE PRESENTATION • Up to 8 extensive ‘stacked’ layers, gently dipping, hosted by permeable coarse- gra
Slide 8: Likuyu North Deposit Exploration
Likuyu North Deposit Exploration 2024 core drilling informs the next phase of exploration o ‘productive’ layers are within ~140m of surface and, o within the (front of) oxide and transitional oxidation state zones. E.g. the area NW (up-dip) of LNDD017 is prospective. o Drilling of several holes on f
Slide 9: SWC-Mtonya corridor
SWC-Mtonya corridor o Exploration to date has targeted the areas with surface uranium, possibly the tail and lateral zones. o Future focus should be at the SW end of the corridor targeting a classic nose ore zone. o Drilling on fence lines is recommended. SWC 2024 drilling highlights SWDD001: 3.8m @
Slide 10: SWC target
SWC target o 2024 drilling suggests it is at the ‘tail’ of the system, High grade material at/near surface are the remains of a layer which is partially eroded and has been upgraded by supergene processes. o Focus should be at the other end of the corridor – targeting the ‘front’ CORPORATE PRESENTAT
Slide 11: Likuyu North – Suited to In Situ Recovery (ISR)
Likuyu North – Suited to In Situ Recovery (ISR) o Study by ERM (Perth) completed Nov 2024 indicates that Likuyu North is favorable for mining by ISR. o The geological and hydrogeological characteristics of the deposit appear to be ideally suited o ISR may ‘unlock’ the deposit as smaller deposits can
Slide 12: Eland – Early stage Niobium-Tantalum-Uranium project
Eland – Early stage Niobium-Tantalum-Uranium project • Large quartz syenite intrusion with zones of high Nb, Ta, Uranium • 2022 Rock-chip samples with up to 4120ppm Nb2O5, 571ppm Ta2O5 and 832ppmU3O8*1 Highest grading 2022 rock-chip samples • Channel sampling (rock saw cut grooves) completed October
Slide 13: Mineral Resource Estimates for Mkuju Project
Mineral Resource Estimates for Mkuju Project JORC MRE for the Likuyu North Deposit • Reported in accordance with the JORC Code Grade Contained 100 pm U3O8 cut off Tonnes (millions) • Effective date 27 April 2022 U3O8 ppm U3O8 Mlbs • Note that these are not in addition to each other, the 200 ppm cut-
Slide 14: Appendix - Board of Directors
Appendix - Board of Directors Greg Johnson – Non-Executive Chairman With more than 25 years of experience in the fund’s management industry, Greg has held senior Capital Raising and client relationship roles at CORPORATE PRESENTATION Macquarie, Perpetual, and Dimensional, and has led Client Services
Slide 15: Appendix - Board of Directors
Appendix - Board of Directors Matthew Boysen – Non-Executive Director Matthew is a self-made sophisticated investor, owning and operating a highly successful retail business that has and continues to experience exponential growth on an annual basis. He has substantial marketing and communication exp
Slide 16: THANK YOU
THANK YOU Suite 1, Level 1, 1 Castlereagh St, Sydney NSW 2000 www.gladiatorresources.net Email: greg@gladiatorresources.net