Rox Resources Ltd · ASX:RXL

Rox Resources — Gold Coast Investment Showcase 2023

20 slides from Rox Resources's conference presentation, Jun 21, 2023

  1. Slide 1: Investor Presentation Gold Coast Investment Showcase 2023

    ASX: RXL Investor Presentation Gold Coast Investment Showcase 2023 21 June 2023 Robert Ryan Managing Director Exploring and Developing the High-Grade Youanmi Gold Project www.roxresources.com.au

  2. Slide 2: Disclaimers and Competent Person Statement

    Disclaimers and Competent Person Statement Forward-Looking Statements Competent Person Statements This presentation has been prepared by Rox Resources Limited. This document contains background information about Rox Exploration Results Resources Limited current at the date of this presentation. The

  3. Slide 3: Building Rox's Value

    Building Rox’s Value Simple Ownership • 100% ownership of the Youanmi Gold Project (OYG), post Venus transaction • Increased investor and capital markets appeal Significant Upside • Game changing discoveries in near mine areas: o Paddy’s Lode and Midway • Regional areas opportunities (Linda Gossan,

  4. Slide 4: ESG Framework

    ESG Framework We are pleased to align our reporting to the United Nations Sustainable Development Goals (SDG’s), the Global Reporting Initiative’s (GRI) Standards and the Task Force for Climate-related Financial Disclosures (TCFD) 2023 Goals Publish Sustainability insert within our Annual Report Est

  5. Slide 5: Project Location

    Project Location • Youanmi Gold Project located approximately 480km northeast of Perth and Mt Fisher – Mt Eureka Gold Project Jundee (5Moz) approximately 140km southeast of Wiluna Meekatharra Meekatharra Gold Mt Fisher – Mt Eureka (0.2Moz) Operation (3Moz) Cue Gold Operation (4Moz) Mt Magnet Mine (3

  6. Slide 6: Corporate Information

    Corporate Pro-forma Corporate Snapshot Current Pro-forma1 Information Shares Market Capitalisation (at 15/6/2023) 224.4m A$80.8m 334.4m A$120.4m Options 16.1m 16.1m Rox Resources Limited (ASX: RXL) is a West Australian focused gold exploration and development Company. It is in Performance Rights 13.

  7. Slide 7: Consolidating the Youanmi Gold Belt

    Consolidating the Youanmi Gold Belt • Rox to acquire 100% interest in the OYG and 90% to 100% gold interests in the regional tenure • Highly strategic consolidation of 697km2 and >60km of strike of the Youanmi Shear Zone • The belt is demonstrated to be host to extensive high-grade gold occurrences

  8. Slide 8: Historical High-Grade Production

    Historical High-Grade Production Over 660koz of historical production at high-grade, mine closed due to low gold price of ~A$450/oz 1908 –1921 Historical Shaft Mining Production 166koz @ 15.2g/t 1937 – 1942 Historical Shaft Mining Production 95koz @ 8.1g/t and 15koz @ 10.2g/t 1987 – 1993 Open Pit Mi

  9. Slide 9: Youanmi South Discovery – Paddy's Lode

    Youanmi South Discovery – Paddy’s Lode Paddy’s Lode Discovery • Bonanza intercept in discovery hole RXRC458: 28m @ 34.81g/t Au from 204m, including; o 18m @ 51.96g/t from 207m, including; o 10m@ 79.55g/t from 211m, including; o 3m @ 138.07g/t from 218m • Follow-up drilling confirms the discovery of

  10. Slide 10: Paddy's Lode Structure

    Paddy’s Lode Structure • The mineralised structure has been defined over 200m in strike at 200m to 250m in depth Paddy’s Lode • Follow-up RC drilling to commence to expand mineralisation up and down dip Potential • Southern extensions to Youanmi provide a potential unmined, high-grade mining area No

  11. Slide 11: Paddy's Lode – Extensive Growth Potential

    Paddy’s Lode – Extensive Growth Potential Mafic Granite Paddy’s Lode Extensive Growth Potential Volcanics • Paddy’s Lode structure has currently been intercepted along a 200m strike length. • The 3.2Moz Au Youanmi deposit sits in a structurally Paddy’s Lode complex setting with an array of E-W sinis

  12. Slide 12: Midway – An Emerging Discovery

    Midway – An Emerging Discovery Midway Discovery • Newly defined exploration corridor that is located within 300m of the hanging-wall of the Youanmi Main Lode and open in all directions • Recent results: o RXDD047: 2.86m @ 22.03 g/t Au from 356.39m and; o RXDD047: 3.73m @ 10.25 g/t Au from 405.80m o

  13. Slide 13: Link High-Grade Drilling Results

    Link High-Grade Drilling Results Resource Development Drilling • Drilling at Link intersecting thick, high-grade mineralisation with several standout intercepts: o RXDD052: 4.00m @ 14.85g/t Au o RXDD058: 6.53m @ 10.31g/t Au; and 7.61m @ 8.20g/t Au o RXDD059: 8.25m @ 8.54g/t Au o RXDD062: 22.00m @ 6.

  14. Slide 14: Youanmi Underground

    Youanmi Underground Youanmi Underground Overview • Refers to the underground lodes mined by GMA during the 1990’s. Above this lies the pre-1942 underground workings that contain remnant pillars left for structural support. • Shear zone hosted, sulphide replacement style of mineralisation. • Drilling

  15. Slide 15: Building Resource Confidence – Near Mine Exploration

    Building Resource Confidence – Near Mine Exploration Limited Near-Mine Exploration Current Resource Statement – April 20221 Kurrajong / United Hill Kurrajong / Rebel Kathleen Main Pit Bunker Rebel North End Kathleen United North Hill End Link April 2022 Tonnes Au Grade Au Metal Resource (Mt) (g/t) (

  16. Slide 16: Potential Upside to Scoping Study

    Potential Upside to Scoping Study Scoping Study Key Metrics Potential Upside – Resource Stope Optimisation Total Material Processed 3.9Mt @ 5.0g/t Au Annual Payable Metal 71koz pa Plant Throughput 480ktpa Processing Plant Layout All-In Sustaining Cost $1,538/oz Pre-Production Capex $99m Notes 1. Ref

  17. Slide 17: Regional Drilling Programme

    Regional Drilling Programme Linda Gossan Prospect Currans Find – Taylor’s Reef Sovereign Prospect • VMC054: 9m @ 15.6 g/t Au from surface • Historical production of 6,874 tons at a recovered average grade of 13 • RC result: including 3m @ 35.2 g/t Au from 1m g/t Au o YSRC014: 8m @ 5.03 g/t Au from 1

  18. Slide 18: Mt Fisher – Mt Eureka Gold Project

    Mt Fisher – Mt Eureka Gold Project (Non-Core Asset) Project Overview • 850km2 ground position in one of the least explored greenstone belts in the prolific Yilgarn Craton • Located immediately along strike of Cannon Resources’ nickel deposits (134kt of Ni at 1.8% Ni) with the host ultramafic unit ex

  19. Slide 19: Next Steps

    Next Steps Corporate Transaction • Finalise the consolidation of Youanmi Gold Project Resource Development and Exploration Drilling Programme Underway • Resource definition drilling near completion • Review and interpret drilling results at Paddy’s Lode and Midway • Review and update mineral resourc

  20. Slide 20: THANK YOU

    THANK YOU Level 2, 87 Colin Street, West Perth, WA 6005 (08) 9226 0044 admin@roxresources.com.au www.roxresources.com.au

Rox Resources — Gold Coast Investment Showcase 2023 on 6ix