Rox Resources Ltd · ASX:RXL

Rox Resources — Noosa Mining Conference 2026

22 slides from Rox Resources's conference presentation, Jul 21, 2026

  1. Slide 1: Unlocking Youanmi’s Growth Potential

    ASX: RXL Unlocking Youanmi’s Growth Potential Aspiring to 150kozpa and Beyond Noosa Mining Conference | July 2026

  2. Slide 2: Important Information and Disclaimer

    Important Information and Disclaimer ASX: RXL Important - you must read the following before continuing Not investment advice This presentation does not constitute investment advice and has been prepared without taking into account the recipient's The following notices and disclaimers apply to this

  3. Slide 3: Important Information and Disclaimer

    Important Information and Disclaimer ASX: RXL Production Target Metallurgical Results The Production Target (and forecast financial information derived from the Production Target) referred to in this announcement is The information in this presentation that relates to metallurgical results is based

  4. Slide 4: Aspiration to Grow Towards 150kozpa Gold Production

    Aspiration to Grow Towards 150kozpa Gold Production1 ASX: RXL Globally recognised, premier gold province Experienced team with proven record Located in the central Youanmi Greenstone Belt within Experienced team with proven record in developing the Southern Cross Province of the Archaean Yilgarn Aus

  5. Slide 5: Strong DFS to FID milestone

    Strong DFS to FID milestone1 ASX: RXL Low-cost, high-margin mine with a strong base plan and significant growth upside Low cost & Average 117koz pa Compelling NPV and High-grade reserve Fully high margin production profile IRR and resource funded • Low AISC of A$1,978/oz • Production profile of ~117

  6. Slide 6: Accelerated delivery of Youanmi

    Accelerated delivery of Youanmi ASX: RXL Execution-focused, proven development team with strong on-time, on-budget delivery to date Commenced Underground DFS & Construction Final Executed Mill under Management Start of Site Mining A$200m Permits Investment Fixed Cost Construction, Changes Dewatering

  7. Slide 7: Building high-grade ore stockpiles

    Building high-grade ore stockpiles ASX: RXL Ore development advancing with multiple high-grade mining fronts • Ore development now underway on two levels, with multiple ore drives • Orebody exhibits strong visual continuity, aligning closely with the geological model • Mining in all 3 declines under

  8. Slide 8: Significantly de-risked pathway to first gold

    Significantly de-risked pathway to first gold ASX: RXL CY25 CY26 CY27 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Key Project First Deliverables DFS Funding and FID Mill construction and commissioning Operating Milestones gold Drilling Definition, Extension, Growth Resource Definition, Growth and Exploration Drillin

  9. Slide 9: Growth Potential Beyond the DFS Mine Plan

    Growth Potential Beyond the DFS Mine Plan ASX: RXL The Company’s aspiration is to become a +150kozpa gold producer1 DFS Base Case Gold Produced (kozpa Au) The Opportunity: 150 Increasing Production Rates & Extending Mine Life • DFS mine plan throughput of 900ktpa vs 1,000ktpa name plate capacity 100

  10. Slide 10: Demonstrated High-Grade Beyond the Mine Plan

    Demonstrated High-Grade Beyond the Mine Plan ASX: RXL Base Mine Plan is the starting point • Underground drilling commenced • Surface infill programs ahead of mining completed • Nominal 20m x 20m spacing, tighter as required, intent to have +12mths drilled ahead of mining ~ 50,000m program • Positiv

  11. Slide 11: Pipeline to Lift Production & Extend Mine Life

    Pipeline to Lift Production & Extend Mine Life ASX: RXL Substantial pipeline of near- mine growth targets • Strong opportunities to unlock more potential in the Mine Plan with further planned drilling along strike and down dip • Underground drilling to fast-track reserve conversion across newly acce

  12. Slide 12: Regional exploration potential – unlocking a large system

    Regional exploration potential – unlocking a large system ASX: RXL >60km strike on Youanmi Shear Zone • Under explored ➢ 2025 Aeromagnetic interpretation identifies previously unidentified structural analogue to Youanmi ➢ Drilling historically focused around Youanmi and Penny • Upcoming works to foc

  13. Slide 13: Team, Vision, Mission

    Team, Vision, Mission ASX: RXL Board of Directors Management Experienced team Stephen Dennis Non-Executive Chair Greg Hoskins CFO & Company Secretary with proven record in developing Phillip Wilding Oliver Keene Australian gold Managing Director & CEO General Manager - Operations mines. Alan Rule Da

  14. Slide 14: Corporate information

    Corporate information ASX: RXL Capital structure (17 July 2026) Analyst Coverage Media Coverage Shares on Issue 1,390m Share Price A$0.38 Market Capitalisation A$528m Performance Rights 33.1m Cash and cash equivalents1 A$152.7m L1 Capital $0.70 50 Other 19.1% 45 $0.60 33.2% 40 $0.50 35 Hawke’s Volum

  15. Slide 15: Investment highlights

    Investment highlights ASX: RXL • Pre-production and stockpiling commenced Production • First gold pour mid-2027 pathway • Production ramp up from late 2027 with initial 7-year life-of-mine • High-grade ore reserve declared 4.4 MT @ 4.8 g/t for 674koz High-grade • Initial mine plan of 5.7MT @ 4.9 g/t

  16. Slide 16: Thank You

    ASX: RXL Thank You Level 1, 87 Colin Street, West Perth, Western Australia 6005 + 61 (8) 9226 0044 www.roxresources.com.au rox-resources admin@roxresources.com.au

  17. Slide 17: Low All-In Sustaining Cost and Capital

    Low All-In Sustaining Cost and Capital ASX: RXL Pre-Production Capital Costs A$m LOM C1 Cash Cost and AISC Breakdown1 Processing Facilities 217 (A$/oz) Site Infrastructure 17 $2,000 $209 $1,978 $179 Underground Mining 28 $1,800 $1,600 $93 $1,590 Tailings Storage Facility 12 $593 $1,400 Water Managem

  18. Slide 18: DFS Production target

    DFS Production target ASX: RXL Ounces (oz) Ounces Mined and AISC A$/ounce 200,000 $3,000 180,000 $2,700 160,000 $2,400 140,000 $2,100 120,000 $1,800 100,000 $1,500 80,000 $1,200 60,000 $900 40,000 $600 20,000 $300 - $0 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Ounces - Inferred

  19. Slide 19: Processing

    Processing ASX: RXL SIMPLE FLOWSHEET TO PRODUCE GOLD DORÉ AVERAGING 117KOZ PER ANNUM – RECOVERIES ESTIMATED AT 90.8%, WITH EXTRA PLANT CAPACITY Understood metallurgy, simple flowsheet 92% of gold associated with sulphides, 60% of gold classified as free milling Sulphide combination of Pyrite and Ars

  20. Slide 20: High-grade ore reserve

    High-grade ore reserve ASX: RXL Existing decline to ~600m below surface Ore Reserve Tonnes (Mt) Grade (g/t Au) Contained Ounces (koz) Proved Underground Ore Reserve - - - Probable Underground Ore Reserve 4.4 4.8 674 Total Underground Ore Reserve 4.4 4.8 674 Noosa Mining Conference | July 2026 20

  21. Slide 21: Plan view and United North section

    Plan view and United North section ASX: RXL Noosa Mining Conference | July 2026 21

  22. Slide 22: Sections Youanmi Main (Nth) and Prospect

    Sections Youanmi Main (Nth) and Prospect ASX: RXL Noosa Mining Conference | July 2026 22

Rox Resources — Noosa Mining Conference 2026 on 6ix