Badger Infrastructure Solutions Ltd · TSX:BDGI
Badger Infrastructure Solutions — Badger Daylighting — Investor Presentation (March 2016)
42 slides from Badger Infrastructure Solutions's investor presentation, March 2016
Slide 1: Badger Daylighting Corporate Presentation 2015
BADGERDAYLIGHTING Corporate Presentation 2015 1
Slide 2: Forward Looking Statements
Forward Looking Statements This presentation contains forward-looking statements reflecting certain current forecasts of certain aspects of the company’s future. It is based on current information that management has assessed, but which by its nature is dynamic and subject to rapid and even abrupt c
Slide 3: Financial Summary
Financial Summary Shares outstanding – at March 17, 2016 37,100,681 Share price range (52 weeks) – at March 17, 2016 $16.71 - $30.59 Market Capitalization - at March 17, 2016 $968M Net debt – at December 31, 2015 $79M Enterprise Value – at December 31, 2015 $1.0B Average Return on Equity (Last 5 Yea
Slide 4: What is Daylighting?
What is Daylighting? Daylighting is simply exposing underground facilities, such as utilities and pipelines, to daylight. 4
Slide 5: Badger Daylighting
Badger Daylighting Badger Daylighting is North America’s largest provider of non-destructive daylighting services. Badger’s primary customers are contractors and facility owners in the utility and petroleum sectors. 5
Slide 6: Badger Process
Badger Process Purpose built, productive Badger unit with well trained, professional operators. 6
Slide 7: Badger Process
Badger Process Pressurized water stream excavation. Nozzle design, pressure and volume is critical to prevent damage. 7
Slide 8: Badger Process
Badger Process Powerful vacuum system removes soil and debris. 8
Slide 9: Advantages of Badger Process
Advantages of Badger Process • Safe → Helps prevent damage to underground infrastructure • Saves time → Keeps projects on schedule • Increases efficiency of hand digging or mechanical excavation equipment when digging around underground utilities • Easy to use in constrained areas - can work 50’ dee
Slide 10: Opportunity: Safety
Ayu] FP Opportunity: Safety What we try to prevent — Accidents. Burnaby, BC July 2007 Sewer Contractor strikes Oil Pipeline
Slide 11: Opportunity: Aging Infrastructure
Opportunity: Aging Infrastructure • 112,000 miles of distribution gas mains need to be replaced.1 • 5.6M distribution gas services need to be replaced.1 • American Society of Civil Engineers estimates $3.6T investment needed in US infrastructure by 2020. 2 • 41,810 miles of pipeline planned or under
Slide 12: Opportunity: Safety
Opportunity: Safety 12
Slide 13: Opportunity: Safety
Opportunity: Safety June 2015 – Canmore, AB A third party contractor hit a 1 ¼” steel ATCO gas line and pulled it off the main. The resulting gas leak caused an explosion, spreading shrapnel around the neighborhood and severely damaging several homes. 13
Slide 14: Opportunity: Aging Infrastructure
Opportunity: Aging Infrastructure San Bruno, CA Sept 2010 NG Pipeline Rupture 14
Slide 15: 15
15
Slide 16: Badger Advantage: Water Main Break
Opportunity: Aging Infrastructure BADGER Advantage: Water Main Break • Expand road cut to 4’ x 4’ • Install shoring & complete repair • Water service restored 60% faster than traditional approach • Repair completed for 10% of cost of traditional approach 16
Slide 17: Badger Advantage: More Efficient Service
Opportunity: Increase Productivity BADGER Advantage: More Efficient Service • Contractor averaging 2-3 service trenches per day or 160-240 linear feet/day with hand digging • Hires Badger to dig trench • Badger averaged 7-10 trenches or 560-800 linear feet/day • Cleaner, neater and narrower trench •
Slide 18: Opportunity: Trenching
Opportunity: Trenching BADGER Advantage: • 11 cubic yards per day in congested conditions • Clean, neat and precise 18
Slide 19: Badger Advantage: Strength and Power
Opportunity: Alternative Solution BADGER Advantage: Strength and Power • Solution provider for unique and difficult projects • Excavated 70’ to sink down culvert in a landfill • No other option was available 19
Slide 20: Opportunity: Increase Productivity Nuclear Facility
Opportunity: Increase Productivity Nuclear Facility • Badger productivity is double what the contractor accomplished • Same application and soil conditions for both trucks 20
Slide 21: Opportunity: Debris Removal
Opportunity: Debris Removal BADGER Advantage: Strength & Power • Debris removal from inside caissons on a barge over 80’ deep • Drilling grout removal – over 10 cubic yards in less than 10 minutes 21
Slide 22: Badger Daylighting Markets
Badger Daylighting Markets 38 62 Petroleum-related infrastructure Utilities & other – 62% & oil field service – 38% (2014: (2014: 49%) 51%) 22
Slide 23: Diversified Market
Diversified Market UTILITIES OIL & GAS POWER GENERATION Gas Distribution Transmission Pipeline Nuclear Electric Distribution Refineries Coal Water & Sewer Production Wind Telecommunications Storage Solar TRANSPORTATION INDUSTRIAL ENGINEERING Rail (Freight, Subways, Light Rail) Manufacturing Transpor
Slide 24: Badger Daylighting Business Model
Badger Daylighting Business Model Vertically integrated service company • Designs and manufactures hydrovac units since 1992 • Lower capital cost investment, safer and more efficient equipment • Payback of capital cost in 3.5 to 4.0 years before tax • Hydrovac unit’s economic life is 10 years • Prov
Slide 25: North America-wide Coverage
North America-wide Coverage 25
Slide 26: Competitive Advantages
Competitive Advantages • Safety application knowledge and daylighting expertise gained from years of experience in different applications in North America • National service provider in US and Canada • MSA’s • Fleet coverage and North America wide service network • Ability to move trucks to increase
Slide 27: Competitive Advantage: Fleet Size
Competitive Advantage: Fleet Size North America’s Largest Hydrovac Fleet: • Badger’s large fleet size lets us respond to large projects with multiple units to get work done within tight project timelines. 27
Slide 28: Competitive Advantage: Technology/Truck Development
Competitive Advantage Technology/Truck Development • In-house design, research/development and manufacturing • Continuous improvement to enhance performance – ensure operator friendly • Other manufacturers sell - less motivation to enhance units • Lower capital cost 28
Slide 29: Red Deer Facility
Red Deer Facility • 69,200 square feet • Canadian administration, regional support, service shop and manufacturing • Design of trucks with professional engineering resource 29
Slide 30: Performance During Weak Economic Conditions
Performance During Weak Economic Conditions 2009 2015 Economic “The Great Recession” – global Oil production glut causes condition recession precipitated by US global oil producers to cut housing bust. investment by hundreds of billions of dollars. Badger • cut build to ~1.5 trucks per month • cut b
Slide 31: Earnings Statement
Earnings Statement $(000s) except EPS FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Revenue 194,178 239,228 324,594 422,219 404,620 Adjusted EBITDA 52,805 63,814 94,169 120,121 107,759 Profit before tax 35,813 42,008 57,827 73,519 38,488 EPS – Diluted $0.79 $0.80 $1.09 $1.43 $1.04 *Includes legal provisio
Slide 32: Balance Sheet
Balance Sheet ($000s) December 31, December 31, 2015 2014 Working capital 83,654 92,908 Long-term debt 103,852 124,358 Cash and cash equivalents (24,991) (19,152) Net debt 78,861 105,206 Equity 267,686 224,248 Net debt : Equity 0.29 : 1.00 0.38 : 1.00 Adjusted EBITDA 107,759 120,121 Net Debt : Adjus
Slide 33: Cash Available for Dividends and Growth Capex
Cash Available for Dividends and Growth Capex For the year ended ($000s) December 31, 2015 Cash flow from operating activities before non-cash working capital adjustments 75,516 Add: Proceeds on disposal of capital assets 737 Less: Required principal repayments of long-term debt - Less: Maintenance
Slide 34: Revenue per Truck per Month
Revenue per Truck per Month Multi Currency Metric 37,500 36,000 34,600 34,500 32,500 32,900 32,200 33,000 31,500 29,600 29,300 30,000 29,200 28,500 27,000 25,500 25,700 25,500 24,700 24,000 22,500 21,000 19,500 18,000 16,500 15,000 13,500 12,000 10,500 9,000 7,500 6,000 4,500 3,000 1,500 0 2006 2007
Slide 35: Hydrovac Units
Hydrovac Units Total Units: Canada & the U.S. 1,100 1,018 998 1,000 900 791 800 700 630 600 504 500 413 407 412 400 334 300 285 241 184 185 212 200 136 162 100 35
Slide 36: Total Daylighting Revenues
Total Daylighting Revenues Canadian $ millions 400 364 368 350 309 300 250 228 200 184 150 140 132 127 113 97 100 77 82 52 62 39 48 50 0 36
Slide 37: Daylighting Revenues U.S. & CDN
Daylighting Revenues U.S. & CDN 300 247.2 250 US Revenues 202162 200 Canadian Revenues 155 154 150 120.4 118 110 101 100 86 68 75 69 75 83 60 63 58 57 51 53 50 35 36 38 25 17 29 14 12 11 17 19 0 37
Slide 38: Deployment
Deployment As of December 31, 2015 TOTAL UNITS – 1,018 Canada 375 U.S. 645 38
Slide 39: Future Growth Opportunities
Future Growth Opportunities Targets • US - double size of fleet (from 2014 YE) within five years (1,200 trucks). • Canada – organic growth long term 10-15% per year. Actions • Develop organization to grow US customer base. • Enhance Business Development capability. • Remain flexible to take advantag
Slide 40: Questions and Answers
Questions and Answers 40
Slide 41: Sources
Sources 1 112,000 miles of distribution gas mains need to be replaced. 5.6M distribution gas services need to be replaced. As of 2011 The American Gas Foundation’s “Gas Distribution Infrastructure: Pipeline Replacement and Upgrades”, page 9, July 2012. Note: estimated to take three decades to comple
Slide 42: Sources
Sources 4. Experts: U.S. water infrastructure in trouble By Alison Kosik, CNN January 21, 2011 42
Badger Daylighting — Investor Presentation (March 2016) on 6ix