Taseko Mines Limited · TSX:TKO

Taseko Mines — BMO Capital Markets Global Metals & Mining Conference 2021

33 slides from Taseko Mines's conference presentation, March 2021

  1. Slide 1: Building North America's Low-Cost Multi-Asset Copper Producer

    BUILDING NORTH AMERICA’S LOW-COST MULTI-ASSET COPPER PRODUCER BMO Capital Markets Global Metals & Mining Conference March 1-5, 2021

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains forward-looking statements and forward-looking information (collectively referred to as “forward-looking statements”) within the meaning of applicable Canadian securities legislation and the United States Private Securities Legislation Reform Act of 1995, Sectio

  3. Slide 3: Presenting Management Team

    Presenting Management Team Stuart McDonald Brian Bergot President Vice President, IR CPA Mr. McDonald is a mining executive with 25 Mr. Bergot was appointed Vice President, years of experience in mining, financial, Investor Relations in March 2014 and has nearly corporate development and management

  4. Slide 4: Taseko in a Nutshell

    Taseko in a Nutshell C A N A D A Building a multi-asset copper producer in the world’s top mining jurisdictions B R I T I S H C O L U M B I A GIBRALTAR Highlights ALEY Experienced management team; proven operator NEW PROSPERITY YELLOWHEAD Gibraltar – Significant copper production / cash flow base –

  5. Slide 5: Copper Price Outlook

    Copper Price Outlook Cu Prices (US$/lb) – Historical and Forward Curve1 Copper prices declined in H1 2020 due to COVID-19 but have since rebounded to multi-year highs; all time highs denominated $4.50 Spot Copper: in C$ $4.11/lb $4.00 Favourable long-term supply-demand dynamics $3.50 ▪ Maturing glob

  6. Slide 6: Gibraltar Copper Mine – British Columbia

    Gibraltar Copper Mine – British Columbia A foundation of stable cashflow MINE TYPE Open Pit – Copper/Moly STAGE Producing PRODUCTION (LoM) 135Mlbs (~60kt Cu) CASH COSTS (LoM) US$1.80/lb Mine Life 18 Years Replacement Value +US$1 billion1 6

  7. Slide 7: Gibraltar Copper Mine

    Gibraltar Copper Mine Large-Scale, Steady-State Mine Value Creation Acquired Gibraltar in 1999 for $1 Restarted the mine in 2004 Between 2006 and 2013, invested C$800 million to expand and modernize the mine to 85,000 tons per day In 2010, sold 25% of the mine for C$187 million to a Japanese consort

  8. Slide 8: Gibraltar Copper Mine

    Gibraltar Copper Mine One of the Americas most efficient open pit copper mines Lowest Cost Open Pit Copper Mines in the Americas (US$/t milled) 1 Chapada $5.8/t Constancia $7.4/t On a cost per tonne milled basis, Gibraltar is one Gibraltar $8.3/t of the lowest cost operations in the world. This is M

  9. Slide 9: Resilient Through Copper Price Downturns

    Resilient Through Copper Price Downturns Positive operating cash flow generation through the cycle demonstrates Taseko’s operational flexibility and ability to adapt Taseko has been able to maintain positive operating cash flow $200 $4.50 throughout extended periods of weak copper prices through str

  10. Slide 10: Florence Copper Project - Arizona

    Florence Copper Project - Arizona MINE TYPE Pathway to a In-situ Leach STAGE low-cost future Development PROCESSING SX/EW PRODUCTION 85Mlb (~40kt) Cu / year ESTIMATED CASH COSTS US$1.10/lb LOM Mine Life 21 Years 10

  11. Slide 11: Florence Copper Project

    Florence Copper Project A near term, low cost copper project Location Central Arizona near the town of Florence Project Highlights Ownership 100% Over US$135 million was spent on the project by former owners (Conoco, Magma Copper, BHP Copper) 345 million tons grading 0.36% TCu (at a 0.05% total Mine

  12. Slide 12: In-Situ Copper Recovery ("ISCR")

    In-Situ Copper Recovery (“ISCR”) How does in-situ copper recovery work? Injection and recovery wells are drilled deep into the bedrock #1 where the oxide copper ore is situated Wells are concrete encased and sealed to protect water #2 quality Highly diluted acid (99.5% water, 0.5% acid) is pumped un

  13. Slide 13: Environmental Advantages of In-Situ Copper Recovery

    Environmental Advantages of In-Situ Copper Recovery ISCR – a green production method for the green metal of the future Illustrative Environmental Advantages of Florence ISCR Project1 Small Environmental Footprint Conventional Open Pit Mine Florence ISCR Numerous Site Redevelopment 41 Opportunities L

  14. Slide 14: Florence Copper Project

    Florence Copper Project A defined path to production 2017 2018 2019 2020 2021 2022 Technical work results in PTF development First cathode produced Completed PTF Aiming to complete First production from significant improvement in and construction starts in April 2019 production phase permitting in m

  15. Slide 15: Florence Copper Project

    Florence Copper Project Capital efficient, high return growth project Cu Price Pre-Tax NPV Pre-Tax Sensitivity (US$/lb) (US$M) IRR Value Creation Model $3.00 $916 44% +10% $3.30 $1,122 51% In 2014, Taseko acquired Florence Copper for C$80M and invested US$80M in the project to date, including US$25M

  16. Slide 16: Taseko Mines Looking to the Future

    Taseko Mines Looking to the Future 16

  17. Slide 17: Looking to the Future – Yellowhead

    Looking to the Future – Yellowhead Project Highlights Location 150km NE of Kamloops, British Columbia Advanced stage project acquired by Taseko in 2019 for ~C$13 million in Taseko shares Ownership 100% Located in close proximity to power, rail and highway 4.4 billion pounds recoverable copper Minera

  18. Slide 18: Looking to the Future – New Prosperity

    Looking to the Future – New Prosperity Project Highlights Location 125 km SW of Williams Lake, British Columbia One of the Largest Copper-Gold porphyries in the world Ownership 100% Life of mine average annual production of ~540,000 gold equivalent oz 1 7.7 million ounces recoverable gold Mineral Re

  19. Slide 19: Taseko Copper Reserves Guidance

    Taseko Copper Reserves Guidance +/-5% Significant Value in P&P Copper Reserves Nearly 15 billion pounds of copper in reserves, more than any of Taseko’s peers Current market cap implies value of C$0.04 per pound of copper, lower than peers 15 1.00 New 12 Prosperity 0.80 (Cents / Copper Lbs) (Billion

  20. Slide 20: Why Invest in Taseko

    Why Invest in Taseko Taseko Valuation Waterfall $1,800 $850 $1,600 $1,400 $1,335 Significant gap between asset NPV and market cap $1,200 $280 $1,000 ▪ Based on US$3.00/lb copper and not including Yellowhead, New $800 $745 ~C$700mm Gap Prosperity or Aley $600 $400 Near-term and medium-term copper pro

  21. Slide 21: Appendix

    Appendix 21

  22. Slide 22: Capital Structure & Coverage

    Capital Structure & Coverage Share Price C$2.13 Analyst Coverage Target Price & Recommendation 52 Week High / Low C$2.34 / 0.28 Liberum Buy C$3.08 (+45%) Jan ’21 BMO Buy C$1.90 (-5%) Jan ’21 Listed TSX:TKO / NYSE:TGB / LSE:TKO Cantor Fitzgerald Buy C$2.50 (+20%) Jan ’21 Shares Outstanding* 282M Para

  23. Slide 23: Improved Credit Profile

    Improved Credit Profile Substantial improvement in leverage metrics on the back of higher copper prices, Gibraltar mine plan optimization and enhanced liquidity Operational Improvement Taseko maintains reasonable leverage levels and balances LTM Adjusted EBITDA (US$M)1 capital needs through a combin

  24. Slide 24: Proactively Reducing Impact of Cu Price Volatility

    Proactively Reducing Impact of Cu Price Volatility Hedging policy in place to reduce the short term impact of a decline in the price of copper Defensive Hedging Strategy Historical Copper Hedging and Cu Production (Mlbs) Taseko’s hedging strategy is designed to secure a minimum price for a significa

  25. Slide 25: Building a Sustainable Business

    Building a Sustainable Business Copper is itself a sustainable material, like our company Published first ESG Report, titled Our Contribution to Sustainability, in May 2020 Employees Governance Health & Safety Policy ❖ Corporate Governance Policy ❖ Commitment to diversified workforce ❖ Director Inde

  26. Slide 26: A Proven Team of Mine Builders and Value Creators

    A Proven Team of Mine Builders and Value Creators Senior Management Russell Hallbauer Stuart McDonald Bryce Hamming CEO & Director President CFO P.Eng CPA CFA, CPA Board Professional engineer with 35 years’ Mining executive with 25 years of experience in Joined in 2018, with over 20 years experience

  27. Slide 27: Aley Niobium Project

    Aley Niobium Project Project Highlights 140 km north of Mackenzie, British Location Columbia The world's largest niobium deposit, outside the two operating mines in Brazil (site covers Ownership 100% ~433 km2) Mineral 84 million tonnes grading 0.50% Nb2O5 “Green" rare metal – metals like niobium, ar

  28. Slide 28: Jurisdiction Exposure – 2019 Fraser Institute

    Jurisdiction Exposure – 2019 Fraser Institute Taseko’s exposure sits on the 1st quartile of the Fraser Institute’s Investment Attractiveness Index • The Investment Attractiveness Index is a composite index that combines the Policy Perception Index and the Best Practices Mineral Potential Index, weig

  29. Slide 29: Adjusted EBITDA and Net Debt Reconciliation

    Appendix Adjusted EBITDA and Net Debt Reconciliation NINE MONTHS ENDED LAST TWELVE MONTHS YEARS ENDED DECEMBER 31 (CDN$ dollars in thousands) SEPTEMBER 30 March 31 June 30 September 30 2017 2018 2019 2019 2020 2020 2020 2020 Net income (loss) C$34,262 (C$35,774) (C$53,382) (C$43,451) (C$29,218) (C$9

  30. Slide 30: Reserves & Resources

    Appendix Reserves & Resources Gibraltar Florence Category Size Grade Recoverable Contained Category Size Grade Recoverable Metal Contained Metal (at 0.15% Cu cut-off) (M Tons) Metal1 Metal (at 0.05% TCu cut-off) (M Tons) (%TCu) Cu (B lbs) Cu (B lbs) Cu (%) Mo (%) Cu (B lbs) Cu (B lbs) Probable Reser

  31. Slide 31: Reserves & Resources

    Appendix Reserves & Resources Yellowhead New Prosperity Category Size Grade Recoverable Contained Category Size Grade Recoverable Metal Contained Metal (at 0.17% Cu cut- (M Tons) Copper Copper (M off) Tonnes) Au Cu Au Cu Au (g/t) Cu (%) Cu (%) Au (g/t) Ag (g/t) Cu Eq (%)* (B lbs) (B lbs) (M oz) (B l

  32. Slide 32: Reserves & Resources

    Appendix Reserves & Resources Aley Category Size Grade Recoverable Contained Metal (M Tonnes) Metal Nb205 (%) Nb (M kg) Nb (M kg) Proven 44 0.52 102 160 Probable 40 0.48 86 134 Total P&P Reserves 84 0.50 188 294 (at 0.30% Nb2O5 cut-off) Measured 113 0.41 - 323 Indicated 173 0.35 - 423 Total M&I Reso

  33. Slide 33: NI 43-101 Compliance

    Appendix NI 43-101 Compliance • Unless stated otherwise, Taseko Mines Limited (the “Company”) has prepared the technical information in this presentation including Mineral Reserve Mineral Resource estimates (“Technical Information”) based on information contained in the technical reports and news re

Taseko Mines — BMO Capital Markets Global Metals & Mining Conference 2021 on 6ix