    Origin energy To Company Announcements Office Facsimite 1300 300 021 Company Australian Stock Exchange Limited Date 17 June 2005 From Bill Hundy Pages 15 Subject PRESENTATION Please find attached a presentation for an Investor Field Trip being heid by the Company today. A copy of the presentation ca

  2. Slide 2: Spring Gully Project

    SPRING GULLY PROJECT

  3. Slide 3: Spring Gully Development Area

    SPRING GULLY DEVELOPMENT AREA Wellhead 42 welis Gas Plant 3x3500 HP compression 36TJ/d capacity Evaporation Pond Pipeline 15-20,000 kl/d capacity 89km transmission pipeline — : @) rigi n 147km gathering system

  4. Slide 4: Delivered under EPCM project management philosophy

    Delivered under EPCM project management philosophy with key disciplines managed by Origin employees « Origin is Project Manager ¢ Multiple Contracting Philosophy « Shedden Uhde Management System - Cost Control - Contracting/Procurement/Expediting ~ Engineering Design ¢ Origin Staff Imbedded througho

  5. Slide 5: Spring Gully Project Schedule

    Spring Gully Project Schedule Forecast Date Actual Date Complete Detailed Jul 2004 Oct 2004 Engineering Complete Gathering Feb 2005 Feb 2005 System Complete Pipeline Nov 2004 March 2005 Construction Complete Gas Plant April 2005 May 2005 First gas July 2005 June 2005 Origin |

  6. Slide 6: Environmental Approvals

    Environmental Approvals « Extensive baseline environmental studies completed. - Hydrology ~ Flora/Fauna - Soils - Groundwater - European Heritage - Noise * Environmental Management Plan approved by regulatory authority and environmental licence issued. » Baseline studies identified two ecosystems an

  7. Slide 7: Native Title & Cultural Heritage Approvals

    Native Title & Cultural Heritage Approvals ¢ Cultural Heritage Agreements have been reached with the relevant Native Title parties for the area. « Representatives of Traditional Owner groups are employed to check all proposed new disturbances and monitor earthworks activities. ¢« An Indigenous Land

  8. Slide 8: How CSG is trapped

    How CSG is trapped Unlike conventional natural gas reservoirs, where gas is trapped by buoyancy underneath a sealing rock within the pores (holes) in the reservoir rock, gas in coals is adsorbed onto the surface of the coals (micropores and fractures) and held in place by the water pressure. This me

  9. Slide 9: CSG Vs Conventional Production

    CSG Vs Conventional Production Because the micropore surface area of coals is much larger than the porosity in conventional reservoirs, coals can retain much larger volumes of gas over the same thickness and area. However the production characteristics of a coal is more dominated by the fracture net

  10. Slide 10: Coal depth and typical well spacing

    COAL DEPTH ~700 - 800m le TYPICAL WELL SPACING 1.0 - 1.5krrv ,|

  11. Slide 11: Spring Gully Gathering Facilities

    Spring Gu Wellhead & Separator os ly Gathering Facilities Sales Gas Cot 4 | ! igging Facility | Sales Gas Pipetine Fresh Water to irrigation or creck discharge wp jemoss Preis Trial eso. Creek Disc harge & permeate (Salt Water) % to Evaporation Ponds Possibie re-injection of pond brine to depleted c

  12. Slide 12: Underream hole drilling

    ~ ONDER REAM HOLE: yee faydraulic drive ueit

  13. Slide 13: Cavitation Rig Layout

    Cavitation Rig Layout ia onl a an raya mana li He eee un eee CATWALK AND PIPE RACKS: ines

  14. Slide 14: Cavitation - Well Schematic

    Cavitation - Well Sc i i /) SURGES hematic

  15. Slide 15: Fracture Stimulation - Well Schematic

    Fracture Stimulation - Well Schematic l