Teton Energy Corp

Teton Energy — Investor Presentation (January 2008)

77 slides from Teton Energy's investor presentation, Jan 31, 2008

  1. Slide 1: Focus on Growth - Analyst Meeting

    Slide 1: Focus on Growth - Analyst Meeting

    "Focus on Growth" Karl Arleth, President & CEO Dominic Bazile, COO Lonnie Brock, CFO Rich Bosher, VP Business Development Bill Brand, Controller & CAO Analyst Meeting January 31, 2008 Denver, CO

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation is accompanied by slides. This presentation and the accompanying slides may contain "Forward-Looking Statements" within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. All statements other t

  3. Slide 3: Purpose of the Meeting

    Slide 3: Purpose of the Meeting

    Purpose of the Meeting Present a strategic roadmap for 2008 Provide an update on our 2007 results Provide an overview of our 2008 plans

  4. Slide 4: Agenda

    Slide 4: Agenda

    Agenda Strategy and Company Outlook Karl Arleth, CEO Asset and Operations Review Dominic Bazile, COO Financial Review Lonnie Brock, CFO - - -

  5. Slide 5: About Teton

    Slide 5: About Teton

    About Teton (1/25/08) Ticker Symbol: TEC Enterprise Value: $98 million Debt / Total Cap: 33% Market Cap: $80 million Daily Production, 2007 exit rate: 4.3 MMcfed Institutional Ownership: 29% Trading Volume: 61,000 sh / d

  6. Slide 6: Competitive Strengths

    Slide 6: Competitive Strengths

    Competitive Strengths Evaluating resource play risk Low entry cost into resource plays Acquiring repeatable drilling projects Track record of growth Maintaining focus and consistency Acquisition and capital discipline Speed and execution Managing non-operated properties Assembling teams Strategy (20

  7. Slide 7: Have resulted in...

    Slide 7: Have resulted in...

    Have resulted in... A portfolio of over 2,500 gross unrisked prospects Delivery on our operational goals and production targets Management team committed to growth and shareholder value 7 current projects (4 Operated, 3 Non-Operated) Low-cost entry into prolific resource plays Funded capital program

  8. Slide 8: Asset Evolution

    Slide 8: Asset Evolution

    Asset Evolution Williston Basin, ND 2006 acquisition 88,400 gross acres Bakken, Red River Production Non-operated "Proof of concept" stage Eastern Bighorn Basin, WY 2007 acquisition 16,400 gross acres Greybull sand-conventional Mowry Shale-horizontal Operated Resource potential Piceance Basin, CO 20

  9. Slide 9: Portfolio Risk

    Slide 9: Portfolio Risk

    Portfolio Risk Big Horn Basin Williston Basin DJ Basin Piceance Basin

  10. Slide 10: Production and Reserve Growth

    Slide 10: Production and Reserve Growth

    Production and Reserve Growth Production CAGR of 977 % ('04-'07) Reserve CAGR of 142% ('04-'07) * Sold down 50% of Piceance in October 2007 (Est.) * * After Piceance sale (Est.)

  11. Slide 11: Growth Catalysts

    Slide 11: Growth Catalysts

    Growth Catalysts Forecasted production increase to 2.0 Bcfe in 2008 (+60%) Visible growth from 2008 low-risk drilling inventory Piceance - 52 wells DJ - 180 wells Williston - 4 wells Big Horn - 4 wells Low-cost operations-LOE approximately $0.55 / Mcfe Active rigs: Piceance - 3, DJ - 3, Williston -

  12. Slide 12: Rockies Express Pipeline

    Slide 12: Rockies Express Pipeline

    Rockies Express Pipeline Rockies Express Pipeline Overthrust Lease Certificated Zone 1 Zone 2 Zone 3 Certificate I Segment (REX-West) Certificate II Segment (REX-West) REX - Certificated Segment 2 Approximate Locations of: Compressor Stations Hub Services Provided Market Hubs Proposed Interconnectio

  13. Slide 13: El Paso Corp. Proposed Pipeline

    Slide 13: El Paso Corp. Proposed Pipeline

    El Paso Corp. Proposed Pipeline Malin Opal Hub U T A H N E V A D A O R E G O N C O L O R A D O I D A H O C A L I F . W Y O M I N G CIG Kern River Paiute Tuscarora PG&E GTN General Ruby Route Opal to Malin WIC Cheyenne Plains Cheyenne Uinta Basin Piceance Basin 680 miles of 42-inch Opal to Malin 1.2

  14. Slide 14: Teton Growth Strategy

    Slide 14: Teton Growth Strategy

    Teton Growth Strategy Acquire - high repeatability resource play acreage at a risk- discounted price (Piceance: +12 x ROI on partial sale) Prove concept - build operated positions to a level of development where sale to a larger independent is accretive to cash flow (approximately 20%) Aggregate - a

  15. Slide 15: Agenda

    Slide 15: Agenda

    Agenda - - - Strategy and Company Outlook Karl Arleth, CEO Asset and Operations Review Dominic Bazile, COO Financial Review Lonnie Brock, CFO

  16. Slide 16: Overview Projects Outline

    Slide 16: Overview Projects Outline

    Overview Projects Piceance Basin DJ Basin Williston Basin Big Horn Basin Outline

  17. Slide 17: Proved Reserves

    Slide 17: Proved Reserves

    Proved Reserves * Sold down 50% of Piceance in October 2007 (Est.) * * After Piceance sale

  18. Slide 18: Reserve and Resource Summary

    Slide 18: Reserve and Resource Summary

    Reserve and Resource Summary (Bcfe) (12/31/07 est.) Grand Total - 359.2 Bcfe

  19. Slide 19: Value Creation - Acquisition to Development

    Slide 19: Value Creation - Acquisition to Development

    2006 2007 Piceance Basin DJ Basin Williston Basin Big Horn Basin February 2005, $6.2MM April 2005, $4.2MM May 2006, $6.1MM June 2007, $900,000 : Acquisition : Drill Value Creation - Acquisition to Development : Production : Sale of 50% of Asset (12.5% WI) 2005 3P 4P Bcfe 66.3 0 2.2 85.1 0.8 50.9 0 1

  20. Slide 20: Existing Wells & 2008 Drilling Program

    Slide 20: Existing Wells & 2008 Drilling Program

    Existing Wells & 2008 Drilling Program

  21. Slide 21: Operated vs. Non-Operated Control

    Slide 21: Operated vs. Non-Operated Control

    Operated vs. Non-Operated Control 1 2 1 2 Operated wells acquired from Delta Petroleum Wells drilled and operated by Teton

  22. Slide 22: Piceance Basin Overview

    Slide 22: Piceance Basin Overview

    Overview Projects Piceance Basin DJ Basin Williston Basin Big Horn Basin Outline Piceance Basin, CO 12.5% WI in 6,314 gross acres Proved Reserves: 11.9 Bcfe Probable Reserves: 31 Bcfe Current Production: 3.5 MMcfed

  23. Slide 23: Piceance Basin Non-Op

    Slide 23: Piceance Basin Non-Op

    Piceance Basin Non-Op Teton / Berry / Delta Cretaceous Williams Fork production 3.5 Mmcfed net to Teton 53 wells producing 52 wells to be drilled in 2008 Rulison Grand Valley Mamm Cr

  24. Slide 24: Asset Overview - Piceance Basin

    Slide 24: Asset Overview - Piceance Basin

    Asset Overview PICEANCE BASIN 12.5% WI in 6,314 gross acres Berry operates (50% WI); Delta 32.5% WI partner 207 gross future drilling locations on 10 acre spacing 1.3 Bcfe gross EUR, $2.5 MM to drill and complete 11.9 Bcfe of proved reserves as of 12/31/07 Drilling efficiencies and cost savings key

  25. Slide 25: Teton Results - Piceance Basin

    Slide 25: Teton Results - Piceance Basin

    Teton Results - Piceance Basin Acquired 6,314 gross non-producing acres in February 2005 Paid $6.2 MM, $4,000 per net acre for 25% non- operated interest Currently 53 producers, 100% success rate Reserves of 66.3 Bcfe (3P) Daily production rate of 3.5 net MMcfed Sold down 50% in October 2007 for $38

  26. Slide 26: Piceance Basin - 2008 Wells

    Slide 26: Piceance Basin - 2008 Wells

    Piceance Basin-2008 Wells Teton Acreage PDC Marathon Gathering Producing Wells WOC, WOPL, Drilling 2008 Drill Locations Remaining Locations Occidental Encana Williams Encana

  27. Slide 27: Piceance Basin - Production History

    Slide 27: Piceance Basin - Production History

    Piceance Basin - Production History

  28. Slide 28: Piceance Basin - Well Economics

    Slide 28: Piceance Basin - Well Economics

    Piceance Basin-Well Economics

  29. Slide 29: DJ Basin Overview

    Slide 29: DJ Basin Overview

    Overview Projects Piceance Basin DJ Basin Williston Basin Big Horn Basin Outline DJ Basin 25% WI in 330,152 gross acres, Noble DJ (Non-Op) 50% WI in 28,204 gross acres, Frenchman Creek (Op) 100% WI in 111,872 gross acres, South Frenchman Creek (Op) 100% WI in 499,904 gross acres, Delta transaction (

  30. Slide 30: Asset Overview - DJ Basin

    Slide 30: Asset Overview - DJ Basin

    Asset Overview DJ BASIN (Niobrara) 25% WI in 330,152 gross acres covered by AMI with Noble (75% WI operator) 1,300 + gross future drilling locations on 40 acre spacing 200 MMcfe gross EUR, $220 M to drill and complete 0.7 Bcfe of proved reserves as of 12/31/07 50% WI in 28,204 gross acres Frenchman

  31. Slide 31: Teton Results - DJ Basin

    Slide 31: Teton Results - DJ Basin

    Teton Results - DJ Basin Acquired 183,000 gross acres in eastern DJ block in 2005. Built up to 266,000 gross acres Concluded transaction with Noble Energy in 2006 Participated in 20 wells in Fall of 2006. (Noble-Teton) Participated in 90 wells in 2007 (Noble-Teton) Acquired 499,904 gross acres and 1

  32. Slide 32: DJ Basin - Well Economics

    Slide 32: DJ Basin - Well Economics

    DJ Basin—Well Economics (Gros EUR; 200 Nie — IGross iP: 88 Motps = [Dac capex: _$220m = 32 Teton Energy Corporation

  33. Slide 33: DJ Map

    Slide 33: DJ Map

    DJ Map DJ Basin Teton Acreage Greater Wattenberg Area Teton Washco Assets Teton / Noble AMI TetonSouth Frenchman Creek Teton Frenchman Creek

  34. Slide 34: Eastern DJ Basin Teton Acreage

    Slide 34: Eastern DJ Basin Teton Acreage

    Eastern DJ Basin Teton Acreage Eastern DJ Basin Teton Acreage Position Teton / Targe AMI Operated Niobrara Beecher Island Gas Fields Colorado Kansas Nebraska Teton / Noble AMI Non-operated 330,152 Gross Acres 103 Wells Drilled 362 Mcfd (Net) 30 sq. mi. 3D seismic acquired Teton / Targe AMI (Frenchma

  35. Slide 35: Eastern DJ Basin Non-Op

    Slide 35: Eastern DJ Basin Non-Op

    Eastern DJ Basin Non-Op Teton / Noble AMI Sharon Springs Niobrara Beecher Island Niobrara Beecher Island Chalk Production 362 Mcfd net 50 wells producing (12/31/07) 163 wells to be drilled in 2008

  36. Slide 36: DJ Basin Frenchman Creek Prospect

    Slide 36: DJ Basin Frenchman Creek Prospect

    DJ Basin Frenchman Creek Prospect Niobrara Beecher Island Structure Map Phillips County, Colorado DJ Basin Dip Line Frenchman Creek Prospect Strike Line Red=structural highs Strike Line # # SE Dip Line # High Amplitude Gas Signature Beecher Island Structural High EUR 0.2 Bcf / well Depths: 2,500' TD

  37. Slide 37: DJ Gathering System

    Slide 37: DJ Gathering System

    DJ Gathering System 10 Mmcfd capacity Current throughput 300 mcfd Soliciting 3rd party gas 10" tap into Cheyenne Plains Teton Gathering System Compressor Station Cheyenne Plains Pipeline Teton Gathering Pipeline System

  38. Slide 38: DJ Basin, Colorado Washco Acreage

    Slide 38: DJ Basin, Colorado Washco Acreage

    DJ Basin, Colorado Washco Acreage Teton Acreage Washco Assets 100 % Operated 499,904 Gross Acres 29 Producing Wells 1.0 MMcfed Niobrara Beecher Island Gas

  39. Slide 39: DJ Basin Washco Acreage Dakota Sand

    Slide 39: DJ Basin Washco Acreage Dakota Sand

    DJ Basin, Colorado Washco Acreage Dakota Sand Spotted Dog Field J Sand Producer Closed (4-Way) Structure Seismically Definable 700 MBO Cumulative (Current) 9 Wells Teton Acreage

  40. Slide 40: Western DJ Basin, Colorado

    Slide 40: Western DJ Basin, Colorado

    Western DJ Basin, Colorado Niobrara Beecher Island Production Structural control of Niobrara production 300 Mcfed net to Teton 20 producing wells Additional Niobrara Beecher Island potential Niobrara A' A A A'

  41. Slide 41: Williston Basin Overview

    Slide 41: Williston Basin Overview

    Overview Projects Piceance Basin DJ Basin Williston Basin Big Horn Basin Outline Williston Basin, ND 25% WI in 88,400 gross acres Proved Reserves: 0.13 Bcfe Probable Reserves: 0.31 Bcfe Possible Reserves: 0.33 Bcfe

  42. Slide 42: Asset Overview - Williston Basin

    Slide 42: Asset Overview - Williston Basin

    Asset Overview WILLISTON BASIN 25% WI in 88,400 gross acres targeting Bakken (Goliath Project) and Red River formations $6.1 million purchase price in May 2006 Bakken potential: 135 gross future locations on 640 acre spacing (258 MBO, $3.8 MM to drill and complete) Red River potential: 10 gross futu

  43. Slide 43: Teton Results - Williston

    Slide 43: Teton Results - Williston

    Teton Results - Williston Acquired 25% non-operated working interest in 2006 88,400 gross acres, $6.1 million, $420 per net acre Participated in tri-lateral Bakken exploratory well in September 2006 Participated in Marathon Bakken test in March 2007 Participated in Whiting Red River test in November

  44. Slide 44: Nesson Anticline Production

    Slide 44: Nesson Anticline Production

    Nesson Anticline Production Marathon 34-20H Whiting Solberg 32-2, Teton Participation, Red River Discovery Test: 2.1 Mmcfd, 408 Bod Teton Champion 1-25H Madison Oil Production Williston Basin Non-Op Teton / Evertson / AOG Red River 2 miles north of Solberg 32-2 1 Bakken well drilled to date Bakken P

  45. Slide 45: Williston Basin - Well Economics

    Slide 45: Williston Basin - Well Economics

    Williston Basin-Well Economics

  46. Slide 46: Eastern Bighorn Basin Overview

    Slide 46: Eastern Bighorn Basin Overview

    Overview Projects Piceance Basin DJ Basin Williston Basin Big Horn Basin Outline Eastern Bighorn Basin, WY 100% WI in 16,400 net acres No Current Proved Reserves Resource Potential: 155 Bcfe

  47. Slide 47: Asset Overview - Big Horn Basin

    Slide 47: Asset Overview - Big Horn Basin

    Asset Overview BIG HORN BASIN ~100% WI in 16,400 gross acres; currently seeking partner Greybull, Mowry Shale, and Peay Sand projects. ~68 potential Greybull & Mowry locations. Company plans to permit first Greybull test well in 1Q08 (4 2008 Big Horn wells in current Business Plan)

  48. Slide 48: Eastern Big Horn Basin, Wyoming - West Greybull Prospect

    Slide 48: Eastern Big Horn Basin, Wyoming - West Greybull Prospect

    Eastern Big Horn Basin, Wyoming West Greybull Prospect Cretaceous Greybull Sandstone Reservoir Isopach Big Horn County, Wyoming Big Horn Basin PROSPECT AREA Conventional Cretaceous Greybull sandstone Expect: 1.5 Bcf / well 100,000 BO / well 2 Greybull wells planned in 2008 Unconventional Cretaceous

  49. Slide 49: Big Horn Basin - Well Economics

    Slide 49: Big Horn Basin - Well Economics

    Big Horn Basin-Well Economics

  50. Slide 50: Agenda

    Slide 50: Agenda

    Agenda - - - Strategy and Company Outlook Karl Arleth, CEO Asset and Operations Review Dominic Bazile, COO Financial Review Lonnie Brock, CFO

  51. Slide 51: Key Operating Metrics (Est.)

    Slide 51: Key Operating Metrics (Est.)

    Key Operating Metrics (Est.)* * After Piceance Sale

  52. Slide 52: Key Operating Metrics (Est.)

    Slide 52: Key Operating Metrics (Est.)

    Key Operating Metrics (Est.)*

  53. Slide 53: Financial Metrics

    Slide 53: Financial Metrics

    Financial Metrics^^Year end 2007 Net debt / capitalization Net debt/MMcfe of PDP reserves Underlevered Optimum Range Overlevered 30% 50% $1.00 $2.00 33% $1.21

  54. Slide 54: 2008 CAPEX vs. Historical

    Slide 54: 2008 CAPEX vs. Historical

    2008 CAPEX vs. Historical Williston DJ Basin Piceance Bighorn *2008 forecasted **With partner **

  55. Slide 55: Teton Results - Financial

    Slide 55: Teton Results - Financial

    Teton Results - Financial Equity raises: 2006 - Petrie Parkman $11.9 million, Common 2007 - Commonwealth $9.0 million, Conv. Notes 2007 - Ferris Baker Watts & Commonwealth $4.9 million, Common Senior debt facility: 2006 - BNP Paribas $6.0 million, Sr. Borrowing Base 2007 - JP Morgan $10.0 million, S

  56. Slide 56: Sale of Piceance Assets

    Slide 56: Sale of Piceance Assets

    Sale of Piceance Assets October 1, 2007 completed sale of one-half of 25% working interest in Piceance assets for $38 million total consideration ($48,147 per net acre) $33 million cash $5 million value of DJ Basin production and acreage Producing properties (1.0 MMcfed) Undeveloped gross acres (504

  57. Slide 57: Teton's 2008 Capital Program

    Slide 57: Teton's 2008 Capital Program

    Teton's 2008 Capital Program * Partner interest TBD

  58. Slide 58: Capital Availability

    Slide 58: Capital Availability

    Capital Availability December 31, 2007 Cash $24.6 MM Borrowing base: Outstanding $8.0 MM Available $2.0 MM Estimated additions - 2008 $15.0 MM Total available $41.6 MM Plus cash flow from operations in 2008

  59. Slide 59: Selected Financial & Operational Results

    Slide 59: Selected Financial & Operational Results

    Q4-07* Q3-07 Q2-07 Q1-07 2006 2005 Revenue $2,085 $1,114 $833 $1,068 $3,529 $707 Net (Loss) N/A $(952) $(7,245) $(1,801) $(5,724) $(4,094) Cash flow from operations N/A $(243) $(1,466) $(152) $(1,779) $(2,796) CAPEX - Oil & Gas Properties $7,000 $13,370 $9,199 $5,734 $20,355 $11,302 Cash on Hand $24

  60. Slide 60: Quarterly Production & Revenue (Est.)

    Slide 60: Quarterly Production & Revenue (Est.)

    Quarterly Production & Revenue (Est.) * Including realized hedge gains

  61. Slide 61: Margin Analysis

    Slide 61: Margin Analysis

    Margin Analysis Margins aided by low LOE and production taxes Basis differentials to improve with expansion of takeaway capacity (Rocky Mountain Express 2008, 2009) *Includes realized gain on natural gas hedging contracts Average wellhead price* $ 4.89 Pipeline / gathering / fuel expenses $ 0.56 LOE

  62. Slide 62: Natural gas price chart

    Slide 62: Natural gas price chart

    x o ne} & 2 a n @ o) = of a n NGI + Henry Hub —=-RMTCIG + RMTOPAL nm em = wet | MEIN Jed 007/94 eoozzi/t e00z/e/t e00z/v/t sooziieret coozizzret coozieziet doozsviet zoozisviet Looznvet toozwet coozierzt zoozisz/tt soozsz/tt zoozivziut zooziuiet doozeuiet zoozie/tt zoozisitt ‘Trade Date (monthidayly

  63. Slide 63: CIG Basis Differentials

    Slide 63: CIG Basis Differentials

    CIG Basis Differentials = ° aorta oocd {s)1enueLeyIG OID sequiaides ysn6ny

  64. Slide 64: Hedge Position Analysis

    Slide 64: Hedge Position Analysis

    Hedge Position Analysis $- $1.00 $2.00 $3.00 $4.00 $5.00 $6.00 $7.00 $8.00 Sep-07 Oct-07 Nov-07 Dec-07 Jan-08 Feb-08 Mar-08 Apr-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 $- $1.00 $2.00 $3.00 $4.00 $5.00 $6.00 $7.00 $8.00 CIG- Actuals CIG - Forecast $6.00 / MMBtu CIG floor $5.78 / MM

  65. Slide 65: Natural Gas Leverage

    Slide 65: Natural Gas Leverage

    Natural Gas Leverage Pricing Leverage Production Leverage $0.50 / Mcfe change in price 1 MMcfe/d increase in production @ 4.2 MMcfe/d (Q4 2007) @ $4.89 (est. average 2007 price) $0.042 EPS change $0.074 EPS change $710,000 cash flow change $1,250,00 cash flow change With approximately 70% of our pro

  66. Slide 66: Why Buy Teton Today

    Slide 66: Why Buy Teton Today

    Why Buy Teton Today 60% production growth - 2.0 Bcfe (2008) 359 Bcfe opportunity (4P) Over 2,500 low-risk drilling prospects (10+ year inventory) Over 1,000,000 gross acres 123 producing wells (4.3 MMcfe/d, 2007 exit rate) Pricing uplift from Rockies Express in progress Capital budget of $36 MM fund

  67. Slide 67: Appendix

    Slide 67: Appendix

    Appendix 67 Teton Energy Corporation

  68. Slide 68: Gross & Net Acreage

    Slide 68: Gross & Net Acreage

    Gross & Net Acreage Acreage Piceance Basin Acreage Gross Net Garden Gulch Prospect 6.314 789 Undeveloped Acreage Du Basin Acreage Gross Net Frechman Creek Operated ‘South Frenchman Creek Operated Noble AMI Non Operated Washco Assets. DJ Basin Acreage Total 970,132 836,401 Undeveloped Acreage Willist

  69. Slide 69: Well Costs Valley

    Slide 69: Well Costs Valley

    Well Costs Valley DRILL & COMPLETE COSTS IN VALLEY 3250000 3000000 Estimates D&C a mrctus D&C 2300000 z2s0000 2000000 1750000, 1500000, 1250000, seco00 20000 ° 69 Teton Energy Corporation

  70. Slide 70: Well Costs Mesa

    Slide 70: Well Costs Mesa

    Well Costs Mesa

  71. Slide 71: Comparison Economics

    Slide 71: Comparison Economics

    Comparison Economics Piceance Basin Total Acquistion Cos Cost Per Net Acre: 2008 Capital Requirements: Gross Well Cost: sg 9,500" 14-43 Bet Spacing: Total Locations: 725 Mots 6.314 13% 9.88% sacre 6: 2008 Capital Requirements: Gross Well Cost: Well Depth: EUR: 420M ‘Average $10 / acre $16.6 om $220,

  72. Slide 72: Comparison Economics

    Slide 72: Comparison Economics

    Comparison Economics Williston Basin [= Total Acquistion Cost: '» Cost Per Net Act |» 2008 Capital Requirements: '+ Gross Well Cost (est): ‘= Welt Depth: '=_ EUR: 260 Bopa 88, 472 25% 20% 640 435 ‘Big Horn Basin '» Total Acquistion Cost: $800,000 ‘= Cost Per Net Act $75 acre '» 2008 Capital Requirem

  73. Slide 73: Rate of Return Sensitivity vs. Price

    Slide 73: Rate of Return Sensitivity vs. Price

    Rate of Return Sensitivity vs. Price

  74. Slide 74: Piceance Basin, Colorado Williams Fork Play Area

    Slide 74: Piceance Basin, Colorado Williams Fork Play Area

    Piceance Basin, Colorado Cretaceous Williams Fork Play Area

  75. Slide 75: DJ Basin Operated & Non-Operated Prospect Areas

    Slide 75: DJ Basin Operated & Non-Operated Prospect Areas

    DJ Basin, Colorado / Nebraska / Kansas Operated & Non-Operated Prospect Areas

  76. Slide 76: Williston Basin Bakken Shale / Red River Play Area

    Slide 76: Williston Basin Bakken Shale / Red River Play Area

    Williston Basin, North Dakota Bakken Shale / Red River Play Area

  77. Slide 77: Big Horn Basin - Well Economics

    Slide 77: Big Horn Basin - Well Economics

    Big Horn Basin-Well Economics

Source: SEC EDGAR · 8-K filed Jan 31, 2008

More decks from Teton Energy Corp