Teton Energy — IPO Roadshow (July 2007)
26 slides from Teton Energy's IPO roadshow presentation, Jul 23, 2007

Slide 1: Teton Update
TETON ENERGY CORPORATION TETON ENERGY CORPORATION TETON ENERGY CORPORATION Karl F. Arleth President & CEO Dominic Bazile EVP & COO Bill Pennington EVP & CFO Toby Schultz Vice President of Production June 27, 2007 Teton Update

Slide 2: Forward Looking Statements
Forward Looking Statements This presentation may contain "Forward-Looking Statements" within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. All statements other than statements of historical facts included in this release may constitu

Slide 3: Presentation Outline
Presentation Outline Company Overview Operational Review Financial Review Conclusion TETON ENERGY CORPORATION www.teton-energy.com AMEX : TEC

Slide 4: The Teton Story
The Teton Story 2004 - Divested Russian assets 2005 - Core acquisitions-Rockies 2006 - Begin drillbit growth cycle 2007 - Significant drillbit, acquisitions growth COMPANY OVERVIEW www.teton-energy.com AMEX : TEC

Slide 5: Strategy
Strategy 2005-2006: Goal-Relaunch the company Acquire high value non-operated working interests Leverage cash resources by focusing on resource plays Acquire risk discounted opportunities through negotiation-no auctions 2007-2010: Goal-Significant Market Capitalization Growth Drive growth through hi

Slide 6: Q1 2007 Highlights
Q1 2007 Highlights www.teton-energy.com AMEX : TEC Drilled 8 wells in Piceance Connected initial pilot area in DJ Basin to sales Commenced testing on initial well in Williston Basin For the first time, reported Q1 gas sales in the DJ, oil sales in the Williston Hired Chief Operating Officer CORPORAT

Slide 7: Presentation Outline
Presentation Outline Company Overview Operational Review Financial Review Conclusion TETON ENERGY CORPORATION www.teton-energy.com AMEX : TEC

Slide 8: Company Profile
87,032 gross acres 1 well testing (Bakken) Testing for commercial viability Williston Basin 6,314 gross acres 27 wells producing 3.4 MMcfd 36 wells planned for 2007 Piceance Basin Company Profile OPERATIONS REVIEW Market cap - $80* million Shares outstanding - 16.1** MM Stockholders' equity - $34.7*

Slide 9: Piceance Basin
2007 IPAA Small Cap Piceance Basin *Well locations are approximate Garden Gulch Road Road Extension Gathering AMI Producing Wells WOC, WOPL, Drilling 2007 Proposed Locations Remaining Locations Infrastructure Status: Access road completed Phase 1 mesa gathering completed Mesa water line complete www

Slide 10: Piceance Topography
2007 IPAA Small Cap Piceance Topography OPERATIONS REVIEW MESA VALLEY Well Depth: 11,500' Well Depth: 9,000' www.teton-energy.com AMEX : TEC

Slide 11: Piceance Production / Drilling Profile
Piceance Production / Drilling Profile www.teton-energy.com AMEX : TEC OPERATIONS REVIEW 27 15 Average Daily Production by Quarter (MMCFD) 3.42 MMCFD (5/16/07)

Slide 12: Proved Reserves (Piceance Only)
2007 IPAA Small Cap Proved Reserves (Piceance Only) www.teton-energy.com AMEX : TEC OPERATIONS REVIEW

Slide 13: Piceance Recap
2007 IPAA Small Cap Piceance Recap www.teton-energy.com AMEX : TEC Core Asset-5-7 year low risk drilling inventory 36 well program in 2007 Exit production 2005: 500 MCFD net 2006: 2.4 MMCFD net Q1 2007: 2.2 MMCFD net 2007 operational focus: Achieve quarterly drilling forecast Mesa well costs / CIG g

Slide 14: DJ Basin
2007 IPAA Small Cap DJ Basin Summary: 266,572 gross acres 25% working interest 20 wells drilled, 16 cased, 4 dry holes Chundy: 7 pilot wells connected to sales Producing~350 Mcfd Grant: 6 pilot wells connected to sales Future Value 1,355 risked potential gross locations (40 acre spacing) Dissolution

Slide 15: DJ Basin Type Logs
DJ Basin Type Logs Chundy Grant www.teton-energy.com AMEX : TEC Noble Energy Inc. Jones 41-31 T5N R40W S31 Noble Energy Inc. Hagan 21-26 T10N R39W S26 OPERATIONS REVIEW NIOBRARA NIOBRARA GAS CHARGED ZONE GAS CHARGED ZONE

Slide 16: DJ Recap
2007 IPAA Small Cap DJ Recap www.teton-energy.com AMEX : TEC Noble Energy Inc. 2006 participation agreement-$3MM, 20 well carry 7 pilot Chundy wells producing ~ 350 Mcfd Grant pilot connected to sales-continuing to test 90 well program, 50 sq. mile 2D-3D seismic for 2007 Signed Frenchman Creek agree

Slide 17: Williston Basin
Williston Basin Pogo 2-17H Completing (Teton) Teton Acreage Proposed Location (Teton) Marathon 34-20H Pogo 1-17H 17 20 18 19 17 20 Summary: 87,032 gross acres 25% working interest 1 well currently testing Primary target Bakken Formation 300 MBO expected EUR 200-400 BOPD expected IP Rate Future Value

Slide 18: Bakken Recap
2007 IPAA Small Cap Bakken Recap www.teton-energy.com AMEX : TEC Currently testing first tri-lateral well on 87,032 acre block Low geologic risk Bakken oil resource Horizontal drilling technology still moving up learning curve Multiple horizon opportunities: Bakken, Red River, Mission Canyon, Dupero

Slide 19: Eastern Big Horn Basin - Wyoming
2007 IPAA Small Cap Eastern Big Horn Basin - Wyoming www.teton-energy.com AMEX : TEC Targets - Mowry Shale, Greybull Sand, Peay Sand 12,000 Gross/Net Acres Total Cost: $900,000 ($75 per net acre) Estimated EUR/Well: 1.5 Bcf, 100,000 BO Well Cost: $2.7 MM D&C (Greybull) Depth: 13,500' Gross Locations

Slide 20: Presentation Outline
Presentation Outline Company Overview Operational Review Financial Review Conclusion TETON ENERGY CORPORATION www.teton-energy.com AMEX : TEC

Slide 21: Selected Financial & Operational Results
Q1-07* 2006** 2005** Market Capitalization $73,500 $75,751 $66,845 Gas Production (net) 202 MMcf 737 MMcf 90MMcf Revenue $1,068 $3,529 $707 Net (Loss) ($1,800) ($5,724) ($4,094) Cash on Hand $1,246 $4,325 $7,064 Debt $1,000 $0 $0 Capital Expenditures-Drilling $4,459 $16,933 $3,681 Acreage (gross) 35

Slide 22: Financial Capacity
Financial Capacity *Less $11MM raised on 8/2/06; less $9MM raised on 5/16/07 ** As of March 31, 2007; advanced $3.0 million through May 16, 2007 for a total of $4 million outstanding ***Closed May 16, 2007 FINANCIAL REVIEW www.teton-energy.com AMEX : TEC

Slide 23: 2007 CAPEX vs. Historical
2007 CAPEX vs. Historical FINANCIAL REVIEW DJ Basin Piceance Piceance Forecast www.teton-energy.com AMEX : TEC 90 (est.) (est.)

Slide 24: Hedge Position - Piceance
Hedge Position - Piceance Costless Collar $7.25 / MMBtu CIG ceiling* $6.00 / MMBtu CIG floor* 30,000 MMBtu per month hedged for 2007 Additional Hedge Position-Fixed Price Swap Strike Price $5.78 / MMBtu 30,000 MMBtu per month July 2007-October 2008 www.teton-energy.com AMEX : TEC FINANCIAL REVIEW *R

Slide 25: Presentation Outline
Presentation Outline Company Overview Operational Review Financial Review Conclusion TETON ENERGY CORPORATION www.teton-energy.com AMEX : TEC

Slide 26: Long Term Value Creation
Long Term Value Creation www.teton-energy.com AMEX : TEC 2005 2006 2007 Focused on 3-5 year stock performance Strong results ('05, '06) Resource play focus Experienced team in place Market cap: Piceance acreage value Option value on DJ and Williston Poised for future growth CONCLUSION
Source: SEC EDGAR · FWP filed Jul 23, 2007

