Blue Jay Gold Corp. · TSXV:JAY
Blue Jay Gold — Investor Presentation (November 2026)
32 slides from Blue Jay Gold's investor presentation, November 2026
Slide 1: District-Scale Gold Systems
TSXV: JAY | OTCQB: JAYGF | FSE: JAY District-Scale Gold Systems Fall 2026 bluejaygoldcorp.com
Slide 2: Forward-Looking Statements
Forward-Looking Statements This presentation contains forward-looking statements within the meaning of applicable securities laws and factual information that was current as of the date of this presentation. Blue Jay Gold Corp. (the "Company") does not undertake to update or revise any forward-looki
Slide 3: Steller Gold Project - Yukon Investment Thesis
Steller Gold Project - Yukon Investment Thesis High-grade GOLD Resource Infrastructure Steller Program District-scale Potential Flagship Steller Project (NI 43-101)1 • Targeting resource expansion • Former gold producer • Indicated 400,000 oz AuEq1 @ 9.06 g/t • Multiple new targets for discovery • P
Slide 4: First Gold Pour At Steller Project In 1986
First Gold Pour At Steller Project In 1986 31.35 kg Mt. Skukum produced 77,790 oz Au from 1986 to 1988 Historical production per the 2026 NI 43-101 Technical Report (P&E Mining Consultants Inc.) 4 District-scale Gold Systems | bluejaygoldcorp.com | TSXV: JAY | OTCQB: JAYGF | FSE: JAY
Slide 5: Capital Structure
Capital Structure Capitalization Table Ownership Composition Insiders Shares Outstanding 47,550,234 10% HNW* Retail Warrants ($0.90) 4,504,117 Institutional Warrants ($1.20) 10,442,425 Option, RSUs/DSUs 5,306,500 45% Fully Diluted Shares 67,803,276 40% 5% ~45% held by management and institutions *HN
Slide 6: Growth And Discovery Strategy
Growth And Discovery Strategy Tier-1 Jurisdiction and Brownfield Assets Old Crow Legend Building a Brownfields Asset Portfolio N Yukon Peer Projects Steller Gold Project • Be in mineralized regions • Pre-existing Infrastructure Prospector Metals ML Project • Leverage from existing resource base Sitk
Slide 7: How Do We Re-Rate?
How Do We Re-Rate? Comparative EV/Oz Basis $500 $843 $450 $400 Generate Visibility Re-Rate? $350 $137 Average Market Awareness $300 $250 $228 Deliver More Resource $187 Existing resource is open for expansion $200 $145 $143 $152 $150 Deliver More Scale $100 Additional targets provide $97 $96 $50 $23
Slide 8: Steller – Yukon's Highest Grade Gold Resource
Steller – Yukon’s Highest Grade Gold Resource 9.00 BlueJay Blue JayGold GoldCorp. Corp. 7.50 Expand & Scale Resource 6.00 Grade - AuEq/(g/t) 4.50 Rockhaven Resources Ltd. 3.00 White Gold Talamore Mining Corp. Corp. Snowline Gold Klondike Gold Corp. Corp. 1.50 Sitka Gold Corp. Banyan Gold Corp. 0.00
Slide 9: Steller Top-tier Ranking Amongst Canadian Gold Assets
Steller Top-tier Ranking Amongst Canadian Gold Assets 10.00 Westwood Steller LEGEND Windfall Lake Snip Pre-Development 9.00 Production-Development Golden Rose Macassa Preliminary Operating Premier Stages Mines 8.00 Sugar Zone Committee Bay Hasaga Pickle Crow Lamaque Back River Gladiator AuEq. g/t Ul
Slide 10: Steller – Direct Shipping Option
Steller – Direct Shipping Option Evaluating a Lower-Impact Development Pathway Remediation Shipment What the PEA Will Assess Why DSO Could Fit Steller Testing the Logistics Ocean Partners Agreement • High-grade resource • Shipping high-grade material in place of building a full mill and tailings fac
Slide 11: You Don't Need to Make Steel to Make Money from Iron Ore
You Don't Need to Make Steel to Make Money from Iron Ore The same principle underpins our DSO model: mine, prepare and sell. Third parties handle downstream conversion RESOURCE PREPARE SELL DOWNSTREAM Established producers show RAW-MATERIAL PRODUCER C U S T OM E R the model can earn strong IRON ORE
Slide 12: World Class Location & Logistics
World Class Location & Logistics 1 C A N A D A 2 Infrastructure Advantage U S A ▪ Existing 270 tonne-per-day mill YUKON 8 ▪ Over 7.5 km of underground Carcross workings Dawson ▪ 50-person camp, workshop and all- City Eagle Mine weather access road Golden Saddle AurMac Keno Hill 2 Location Advantage
Slide 13: Direct Shipping Ore: Mine, Upgrade and Ship
Direct Shipping Ore: Mine, Upgrade and Ship Prepare the ore on site. Use third-party blending and smelting infrastructure Conventional route: Mine → Mill → Concentrate → Smelter Steller: DSO option to be evaluated in PEA, targeted H1 2027 C OMPANY OP ERATIONS | MI NE S I T E TRA NSP ORT TH I RD- PAR
Slide 14: Steller – District Scale Opportunity
Steller – District Scale Opportunity LEGEND N Project Outline System’s Approach Advantage Au (Ag) Deposits with Resources Prospective Occurrence ▪ District-scale Au-Ag system(s) Roads ▪ Magmatic-Epithermal district Faults Ag-Au ISS Corridor ▪ New Exploration Targets Ag-Au Vein Field Au-Ag-Sb Vein Sy
Slide 15: Steller – New Data, New Targets
Steller – New Data, New Targets N LEGEND Project Outline Au (Aq) Deposits with Resources Prospective Occurence Total Magnetic Intensity Data Advantages ▪ New Geophysical data processing ▪ New core examination Mt Skukum ▪ New structural data collection HS Cap Goddell ▪ New approaches to target Raca S
Slide 16: Steller – High-Grade Historical Intercepts
Steller – High-Grade Historical Intercepts Location Au (g/t) Ag (g/t) AuEq (g/t)1 Interval (m) Skukum Ck (11-05) 6.52 322 12.37 8.20 Skukum Ck (11-07) 8.43 322 14.28 9.70 Skukum Ck (21-21) 10.45 1825 43.63 4.30 Skukum Ck (21-08) 6.05 1142 26.81 2.20 Skukum Ck (21-27) 6.05 106 7.98 14.00 Skukum Ck (1
Slide 17: Skukum Creek – Early Drilling Extends Mineralization
Skukum Creek – Early Drilling Extends Mineralization SC-26-003 ▪ Down-dip Grade Continuity: 14.0 metres grading 8.04 g/t AuEq. 10.5 metres grading 10.19 g/t AuEq. ▪ >30 m extension from historically drilled SC-21-027 ▪ Reinforces continuity of mineralized structure from surface ▪ Structure Open Down
Slide 18: Steller – 2026 Maiden Drill Result Highlights
Steller – 2026 Maiden Drill Result Highlights Location From To Au (g/t) Ag (g/t) AuEq (g/t)1 Interval (m) (m) (m) Skukum Ck (26-03) 495.00 509.00 6.15 124 8.04 14.00 including 498.50 509.00 7.84 154 10.19 10.50 And including 499.60 504.00 12.00 258 15.94 4.40 Skukum Ck (26-01) 444.63 448.96 4.63 74
Slide 19: Skukum Creek: Drilling to Expand
Skukum Creek: Drilling to Expand North Underground Resource South Underground Drive Open Established Resource Expansion Testing Open ‘Targeting Expansion Within & Along Mineralized Corridor’ Resource – Au (g/t) Open 0.01 – 0.50 0.50 – 1.00 1.00 – 5.00 > 5.00 Open Open 19 District-scale Gold Systems
Slide 20: Stepping Out: Skukum Creek Structural Corridor
Stepping Out: Skukum Creek Structural Corridor 20 District-scale Gold Systems | bluejaygoldcorp.com | TSXV: JAY | OTCQB: JAYGF | FSE: JAY
Slide 21: 2026 Steller Exploration Roadmap
2026 Steller Most Exploration Roadmap Advanced Project Advancement Hierarchy Based on Historical Work Skukum Creek (Highest Priority) Becker- Mount Goddell Cochrane Skukum Gully (Antimony) LEGEND Resource / Historical Resource Exploration Target Gold Project Antimony Project Raca Charleston Mount Sk
Slide 22: Management Team
Management Team Geordie Mark Robert Scott Freeman Smith CEO CFO VP Exploration Geordie brings extensive experience in the Mr. Scott is an accomplished professional with Freeman has 18 years of experience in the mining industry, with leadership roles spanning 20+ years of experience in accounting and
Slide 23: Board Of Directors
Board Of Directors Scott Hicks Geordie Mark John-Mark Staude Colin Healey Ashley Kates Chairman Director Director Director Director Mr. Hicks is currently an Independent Director Geordie brings extensive experience in the John-Mark Staude holds a Ph.D. in economic Mr. Healey brings over 20 years of
Slide 24: 2026–27 Catalyst Calendar
2026–27 Catalyst Calendar 2026 Q4 2026 – Q1 2027 H1 2027 WHAT WE RESULTS & PEA & DELIVERED AGREEMENTS 2027 PROGRAM ▪ TSXV listing and $14.7M financing ▪ Remaining 2026 drill results ▪ PEA evaluating a direct shipping ore option ▪ Maiden drill program at Skukum Creek, ▪ Hyperspectral relogging of Mt.
Slide 25: Why Blue Jay Gold
Why Blue Jay Gold Timing and Market Set-up Asset and Technical Merit Execution and Stakeholders Gold Price Proactive Stakeholder Infrastructure & Access Engagement Strength Yukon Sentiment Existing Camp & Rotation Past Operations Funded into 2027 Acquired District-Scale Land Ocean Partners Materials
Slide 26: Risk Factors
Risk Factors The following information describes certain significant risks and uncertainties inherent in the Company’s business and any of the securities of the Company (the “Securities”). Prospective investors should take these risks into account in evaluating the Company and in deciding whether to
Slide 27: Risk Factors
Risk Factors Dependence on Management The Company will be very dependent upon the personal efforts and commitment of its directors and officers. If one or more of the Company’s proposed executive officers become unavailable for any reason, a severe disruption to the business and operations of the Co
Slide 28: Risk Factors
Risk Factors Dilution Issuances of additional Securities, including common shares issued on the exercise of outstanding warrants, options and other share-based awards, will result in dilution of the equity interests of existing shareholders. Market for Securities and Share Price Volatility Although
Slide 29: Risk Factors
Risk Factors Land Title The acquisition of title to resource properties is a very detailed and time-consuming process. No assurances can be given that there are no title defects affecting the properties in which the Company has an interest. The properties may be subject to prior unregistered liens,
Slide 30: Statutory Rights Of Action
Statutory Rights Of Action In certain circumstances, purchasers resident in certain provinces of Canada, are provided with a remedy for rescission or damages, or both, in addition to any other right they may have at law, where an offering memorandum (such as this presentation) and any amendment to i
Slide 31: Be Where The Gold Is
TSXV: JAY | OTCQB: JAYGF | FSE: JAY Be Where The Gold Is Contact Us Today bluejaygoldcorp.com 1 604.235.4059 info@bluejaygoldcorp.com Suite 550 – 800 West Pender ST, Vancouver, BC, Canada V6C 2V6
Slide 32: Steller Au-Ag Project: Resource Estimate
Steller Au-Ag Project: Resource Estimate Mass Au Ag AuEq Au Ag AuEq Classification (Mt) (g/t) (g/t) (g/t) (Moz) (Moz) (Moz) Total Indicated 1.37 7.57 127 9.06 0.33 5.6 0.40 Inferred 2.17 5.63 70 6.45 0.39 4.9 0.45 Including Skukum Creek Indicated 0.91 6.40 189 8.60 0.19 5.5 0.25 Inferred 1.30 5.27 1
Blue Jay Gold — Investor Presentation (November 2026) on 6ix