Castile Resources Ltd · ASX:CST

Castile Resources — Investor Presentation (October 2021)

18 slides from Castile Resources's investor presentation, Oct 12, 2021

  1. Slide 1: Castile Resources Limited: Buried Treasure in the Territory

    Castile Resources Limited Buried Treasure in the Territory Investor Presentation October 2021 www.castile.com.au

  2. Slide 2: Compliance & General Disclaimer

    Compliance & General Disclaimer COMPETENT PERSONS STATEMENTS The information in this report that relates to Exploration Results and Mineral Resources and Exploration Data is based on, and fairly and accurately represents, information and supporting documentation compiled by Mr. Jake Russell B.Sc. (H

  3. Slide 3: Strong Cash Position for Exploration and Development

    Strong Cash Position for Exploration and Development Western Zone ASX Code CST Shares on Issue 199.7M Share Price A$0.23 Market Cap A$46M Cash as at 30/06/21 A$11.2M Jupiter Deeps Zone 2021 Fully Funded 10,000m Drilling Program www.castile.com.au 3

  4. Slide 4: The Rover Mineral Field Surrounding Infrastructure and Resources

    The Rover Mineral Field Surrounding Infrastructure and Resources Gas, Rail, Road and Commercial Airport within a rich Prolific Goldfield Region Tennant Creek Potential for Multi – Deposit Strategy Beginning with the Rover 1 Project Adelaide to Darwin Railway Rover 3. Explorer 142 Stuart Highway Expl

  5. Slide 5: Rover 1 – A Spectacular High Grade Gold Copper (IOCG) Deposit

    Rover 1 – A Spectacular High Grade Gold Copper (IOCG) Deposit Gold Intercepts Copper Intercepts 10m @ 47.97g/t Au 21m @ 6.86% Cu from 471m in R1ARD41-1 from 469m in WGR1D011 7m @ 125.93 g/t Au 27m @ 4.75% Cu from 542m in WGR1D034 from 429m in WGR1D024-1 20m @ 32.61 g/t Au 27m @ 3.26% Cu from 469m in

  6. Slide 6: Rover 1 – 2021 Resource Definition drilling nearing completion

    Rover 1 – 2021 Resource Definition drilling nearing completion 2021 Rover 1 Drilling Program Highlights from Castile Drilling Program Holes 1, 2 & 3 and Daughters Complete Parent Hole 5 and 3 Daughters Hole 20CRD001 Complete 5 3 2 1 30.4m @ 35.6 g/t Au with 1.46% Cu Vertical Depth inc 13.2m @ 76.27g

  7. Slide 7: Key Minerals and a Density Modifying Industrial Mineral Magnetite Product

    Key Minerals and a Density Modifying Industrial Mineral Magnetite Product Key Minerals Gold Copper By-Products Proposed mining shapes for magnetite, gold and copper Cobalt Magnetite Bismuth Density Modifying Battery Mineral Utilised Industrial Mineral Used in Chemicals and for Lithium-ion batteries.

  8. Slide 8: Rover 1 – Metallurgical Testing Confirms Additional By-Products

    Rover 1 – Metallurgical Testing Confirms Additional By-Products Gravity and Bulk Flotation Recovery Commodity Gold Copper Cobalt Bismuth Metallurgy Testing supervised by METS Engineering in ALS Laboratories Gravity Recovery 21.4% Magnetite product testing ongoing for extraction, grind and purity Bul

  9. Slide 9: Rover 1 – Potential for Environmentally Sustainable Mining

    Rover 1 – Potential for Environmentally Sustainable Mining Rover 1 Mining Studies are analysing the Sandvik LH518B, 18t Underground Battery Powered Loader possibility of solar power options for the processing plant and an electrified underground haulage mining fleet Solar Farm Utilising HVDC Cables

  10. Slide 10: Strong NT Government Support and Community Engagement

    Strong NT Government Support and Community Engagement NT Chief Minister The Hon. Michael Gunner Site Visit NT Mining Minister The Hon. Nicole Manison Site Visit Castile has donated Sporting Equipment to all schools within the entire Barkly Region MLA for Barkly Region Steve Edgington and Deputy Mayo

  11. Slide 11: Regional Targets Prepared and Scheduled for DHEM

    Regional Targets Prepared and Scheduled for DHEM 2021 Drilling Program for Regional Targets EXPLORER 108 ROVER 3 1 NEW EXPLORATION HOLE TO BE DRILLED, 3 HOLE CLEANOUTS Further EM assessment Existing Resource of 11.8Mt 3.2% Zn , 2.00% Pb, 11.1g/t Ag and 5.7Mt @ 0.36% Cu ROVER 4 1 NEW EXPLORATION HOLE

  12. Slide 12: Explorer 108 – The Treasure Hunt for the Primary Copper Source

    Explorer 108 – The Treasure Hunt for the Primary Copper Source Explorer 108 - Copper Feeder Zones surrounding the huge lead/zinc deposit – where is the copper coming from? The primary copper source at Mt Isa was discovered beneath the lead/zinc deposit A Explorer 108 Copper Feeder Zones make up the

  13. Slide 13: Explorer 142 – DHEM to survey and drill test for Gold Anomalies

    Explorer 142 – DHEM to survey and drill test for Gold Anomalies EXPLORER 142 ROVER 1 Similar size and geophysical properties to Rover 1 2021 drilling designed to explore for the gold cap at Explorer 142 Hole NR142DD003 clean out complete for DHEM Targeting Gold structures Explorer 142 Resource: 176k

  14. Slide 14: Rover 3 – Geophysics Re-interpretation Leads to Strong Target

    Rover 3 – Geophysics Re-interpretation Leads to Strong Target Rover 3 Rover 3 2020 Geophysical Interpretation 2008 Magnetic source interpretation assumes 2 separate magnetic sources Hole WGR3D001 at Rover 3 to be cleaned out for DHEM 2021 DHEM and 2008 Test drill hole drill program to test the new s

  15. Slide 15: Experienced Board & Management

    Experienced Board & Management Peter Cook Non-Executive Chairman Mr Cook is a geologist BSc (App Geol 1983), mineral economist (MSc Min Econ 1995 WASM) and highly experienced veteran of the Australian resource sector. He is currently the Managing Director of Westgold and has more than a decade of as

  16. Slide 16: Investment Highlights

    Investment Highlights Castile Resources - The ASX's Newest Gold Copper Explorer & Developer 1. Extensive portfolio in the highly prolific Tennant Creek gold copper province region in the Northern Territory 2. Strategic focus on exploration & development at Rover 1 with experienced Board & Management

  17. Slide 17: Castile Resources Limited

    CASTILE RESOURCES LIMITED www.castile.com.au

  18. Slide 18: Mineral Resource Statement

    Mineral Resource Statement www.castile.com.au The Company refers to the mineral resource estimates contained in this presentation as sourced from its Prospectus dated 3 December 2019 and released on the ASX on 12 February 2020 and confirms that it is not aware of any new information or data that mat

Castile Resources — Investor Presentation (October 2021) on 6ix