Endeavour Mining Plc · TSX:EDV

Endeavour Mining — Q2 2020 Earnings Presentation

47 slides from Endeavour Mining's earnings presentation, Aug 5, 2020

  1. Slide 1: Q2 Operational & Financial Results

    Q1 Q2 OPERATIONAL & FINANCIAL RESULTS August 5, 2020 TSX:EDV

  2. Slide 2: Disclaimer & Forward Looking Statements

    DISCLAIMER & FORWARD LOOKING STATEMENTS Cash cost per ounce and all in sustaining cash cost per ounce are non GAAP regulations, and political and economic developments in countries in which performance measures with no standard meaning under IFRS This Endeavour operates Although Endeavour has attemp

  3. Slide 3: Speakers

    SPEAKERS SÉBASTIEN DE MARK HENRI DE PATRICK MONTESSUS MORCOMBE JOUX BOUISSET CEO & Director COO Interim CFO EVP Exploration EVP People, and Growth Culture & IT

  4. Slide 4: Table of Contents

    TABLE OF CONTENTS 1 Q2 & H1-2020 IN REVIEW 2 FINANCIAL SUMMARY 3 DETAILS BY MINE AND PROJECT 4 CONCLUSION 5 APPENDIX Note : All amounts are in US$, except where indicated, and may differ from the MD&A due to rounding

  5. Slide 5: Q2 & H1-2020 in Review

    01 SECTION 1 Q2 & H1-2020 IN REVIEW

  6. Slide 6: H1-2020 Activities Recap

    Q2-2020 RESULTS H1-2020 ACTIVITIES RECAP Strong Continued Achievements Across Our 4 Pillars 1 OPERATIONAL EXCELLENCE 2 PROJECT DEVELOPMENT 3 UNLOCKING EXPLORATION VALUE 4 PORTFOLIO & BALANCE SHEET MANAGEMENT ✓ Full year production and AISC ✓ Fetekro PEA expected to be ✓ Over 234,000m drilled in H2-

  7. Slide 7: Our Covid-19 Response

    Q2-2020 RESULTS OUR COVID-19 RESPONSE Business continuity plan while protecting the well-being of our employees CURRENTLY OPERATING IN A LEVEL 1 ENVIRONMENT › Enhanced preventative measures in place 1 › Gold shipments ongoing with a modified delivery process Near-normal operations › Continued full o

  8. Slide 8: Safety Is Our Top Priority

    Q2-2020 RESULTS SAFETY IS OUR TOP PRIORITY Lost Time Injury Frequency Rate remains low compared to industry standards Lost Time Injury Frequency Rate(1) (on a rolling 12-months basis) 0.66 0.21 LTM Lost Time Injury Frequency Rate 0.40 0.29 0.21 0.16 0.12 4 LTI Over the past 12 months Peer Average(2)

  9. Slide 9: Successful SEMAFO Integration

    Q2-2020 RESULTS SUCCESSFUL SEMAFO INTEGRATION Slotted SEMAFO’s assets within our well-established West African operating model Lean Corporate Head Office General managers are empowered and reply on strong Group Support Functions Mine Site Group support functions Planning & based in West Africa Commu

  10. Slide 10: 2020 Guidance

    Q2-2020 RESULTS 2020 GUIDANCE On track to meet guidance with strong H2-2020 expected ENDEAVOUR SEMAFO PRO FORMA PRODUCTION 680-740Koz 315-355Koz 995-1,095Koz Guidance Guidance Guidance H1 H1 H1 321koz 158koz 479koz ON TRACK ON TRACK ON TRACK AISC 680-740koz Guidance $845/oz $895/oz $895/oz $960/oz $

  11. Slide 11: Production and AISC

    Q2-2020 RESULTS PRODUCTION AND AISC Q2 production decreased with strong H2 expected based on grade sequencing Production and AISC INSIGHTS BY MINE Production, koz AISC, US$/oz AISC from all operations 228koz ITY 124koz 108koz -13% HOUNDÉ 110koz 113koz 171koz 181koz 178koz 172koz $707 Production $1,0

  12. Slide 12: All-in Margin

    Q2-2020 RESULTS ALL-IN MARGIN Increased over the previous year due to higher gold price and start-up at Ity All-in Margin from all operations H2-2020 OUTLOOK CATALYSTS In US$m, unless otherwise indicated › Stronger production Realized › Lower AISC 157m Gold Price $191m +$ › Lower non-sustaining spen

  13. Slide 13: Net Debt Reduction

    Q2-2020 RESULTS NET DEBT REDUCTION Significant improvement in leverage ratio Net Debt Reduction Net Debt Net Debt / Adj. EBITDA (LTM) INVESTMENT PHASE DEBT REDUCTION PHASE $ 187m (EDV standalone) $660m Net Debt reduction $608m over 12 months $528m 2.75x $473m $473m 1.94x 1.48x $309m 1.06x 1.00x 0.44

  14. Slide 14: Strong Exploration Efforts

    Q2-2020 RESULTS STRONG EXPLORATION EFFORTS Over 85% of FY-2020 budget spent in H1-2020 INSIGHTS Exploration expenditure for H1-2020 › During H1-2020, exploration continued to be a strong focus, with a company-wide exploration spend of $35m Houndé › Over 234,800m drilled across the group in H1-2020 $

  15. Slide 15: On Track to Meet 5-Year Exploration Target

    Q2-2020 RESULTS ON TRACK TO MEET 5-YEAR EXPLORATION TARGET Average discovery cost of below $15/oz Total Indicated discoveries and targets Indicated resources discovered 7.1Moz Indicated resources targeted % Cumulative Indicated resources against 5-year discovery target 100% 80% 1.5-2.5Moz 10-15Moz d

  16. Slide 16: Portfolio Management

    Q2-2020 RESULTS PORTFOLIO MANAGEMENT Focused on extending mine lives Key priorities at 4 cornerstone mines Combined Entity Producing Portfolio1 AISC $/oz Tabakoto › Ity - Continue exploration program and (sold in Q4-’18) $1,150 bring Le Plaque into production Nzema Mana › Hounde - Continue explorati

  17. Slide 17: Financial Summary

    02 SECTION 2 FINANCIAL SUMMARY

  18. Slide 18: Financial Overview

    FINANCIAL SUMMARY FINANCIAL OVERVIEW H1-2020 benefited from higher production and higher gold price QUARTER ENDED SIX MONTHS ENDED Jun. 30, Mar. 31 Jun. 30, Jun. 30, Jun. 30, Var. H1-20 (in US$ million unless otherwise stated) PRODUCTION, SALES AND AISC HIGHLIGHTS Gold Production, koz 2020 149 2020

  19. Slide 19: All-in Margin

    FINANCIAL SUMMARY ALL-IN MARGIN H1-2020 benefited from higher production and higher gold price THREE MONTHS SIX MONTHS INSIGHTS H1-2020 VS. H1-2019 ENDED ENDED 1. Higher cash costs at Houndé, Ity and Jun. 30, Mar. 31, Jun. 30, Mar. 30, Δ H1-2020 Agbaou which were partially offset by a All amounts in

  20. Slide 20: Net Free Cash Flow

    FINANCIAL SUMMARY NET FREE CASH FLOW Strong increase due to completion of investment phase in H1-2019 INSIGHTS H1-2020 VS. H1-2019 THREE MONTHS SIX MONTHS ENDED ENDED 1. Working capital and long-term assets: H1-2020 H1-2019 Trade and other receivables (18) (4) Jun. 30, Mar. 31, Jun. 30, Jun. 30, Δ H

  21. Slide 21: Net Debt and Liquidity Analysis

    FINANCIAL SUMMARY NET DEBT AND LIQUIDITY ANALYSIS Financial position significantly improved INSIGHTS Net Cash Variation Analysis › IN Q1-2020, as a precaution to ensure that Endeavour would have substantial liquidity and financial flexibility to operate under various stress-test scenarios, Endeavour

  22. Slide 22: Net Earnings Breakdown

    FINANCIAL SUMMARY NET EARNINGS BREAKDOWN Adjusted EPS of $0.78 for H1-2020 SIX MONTHS ENDED INSIGHTS Jun. 30, Jun. 30, 1. Mainly relates to M&A activity related to the (in US$ million) A = Adjustments made for Adjusted Net Earnings 2020 2019 announced combination with SEMAFO EARNINGS FROM MINE OPERA

  23. Slide 23: Adjusted Net Earnings Per Share

    FINANCIAL SUMMARY ADJUSTED NET EARNINGS PER SHARE Strong EPS over last 5 quarters Adjusted net earnings per share (EPS) Adjusted EPS, in $/share $0.48/share $0.30/share $0.34/share $0.48 Q2-2020 EPS $0.30/share $0.08/share +$0.40 EPS increase Q2-2020 vs. Q2-2019 Q2-19 Q3-19 Q4-19 Q1-20 Q2-20 23

  24. Slide 24: Details by Mine and Project

    03 SECTION 3 DETAILS BY MINE AND PROJECT

  25. Slide 25: Production Bridge

    DETAILS BY MINE & PROJECT PRODUCTION BRIDGE Increase due to the start-up of the flagship Ity CIL mine Production Bridge H1-2019 to H1-2020 INSIGHTS Change in AISC 62koz 479koz › Production increased compared to H1-2019, mainly due: ‒ The start-up of the flagship Ity CIL as commercial 96koz productio

  26. Slide 26: Ity Mine, Côte D'Ivoire

    DETAILS BY MINE & PROJECT ITY MINE, CÔTE D’IVOIRE Mine plan modified to provide increased operational flexibility in COVID-19 environment Q2-2020 vs Q1-2020 INSIGHTS Production and AISC › The mine plan prioritized both waste extraction Production, koz AISC, US$/oz and the TSF raise in Q2-2020 which

  27. Slide 27: Exploration at the Ity Mine, Côte D'Ivoire

    DETAILS BY MINE & PROJECT EXPLORATION AT THE ITY MINE, CÔTE D’IVOIRE Updated Le Plaque reserve is expected to be announced in Q3-2020 Simplified Ity Site Map and Exploration Targets LE PLAQUE INSIGHTS › In H1-2020, exploration efforts continued to be focused on the Floleu license, located only 6km s

  28. Slide 28: Houndé Mine, Burkina Faso

    DETAILS BY MINE & PROJECT HOUNDÉ MINE, BURKINA FASO Stable production over past 5 quarters; higher grades expected in H2-2020 Q2-2020 vs Q1-2020 INSIGHTS Production and AISC › Despite the COVID-19 pandemic, Houndé Production, koz AISC, US$/oz continued to operate at near-normal levels 58koz 55koz 55

  29. Slide 29: Exploration at the Houndé Mine, Burkina Faso

    DETAILS BY MINE & PROJECT EXPLORATION AT THE HOUNDÉ MINE, BURKINA FASO Updated Kari area reserve and Houndé mine plan is expected in Q3-2020 KARI AREA INSIGHTS Houndé Site Map › Kari Area M&I Resource increased by 554koz in H1-2020 › The updated resource increase includes extensions for the Kari Wes

  30. Slide 30: Agbaou Mine, Côte D'Ivoire

    DETAILS BY MINE & PROJECT AGBAOU MINE, CÔTE D’IVOIRE Stronger H2-2020 expected Q2-2020 vs Q1-2020 INSIGHTS Production and AISC › Despite the COVID-19 pandemic, Agbaou Production, koz AISC, US$/oz continued to operate at near-normal levels with no material changes to its mine plan › Production decrea

  31. Slide 31: Karma Mine, Burkina Faso

    DETAILS BY MINE & PROJECT KARMA MINE, BURKINA FASO Successfully transitioned to contract mining Q2-2020 vs Q1-2020 INSIGHTS Production and AISC › Despite the COVID-19 pandemic, Karma Production, koz AISC, US$/oz continued to operate at near-normal levels 27koz 28koz with no material changes to its m

  32. Slide 32: Mana, Burkina Faso

    DETAILS BY MINE & PROJECT MANA, BURKINA FASO Production remained strong despite an interruption due to COVID-19 Q2-2020 vs Q1-2020 INSIGHTS Production and AISC › As a preventive measure, due to the COVID-19 Production, koz AISC, US$/oz pandemic, a large portion of the underground mining team was pla

  33. Slide 33: Boungou, Burkina Faso

    DETAILS BY MINE & PROJECT BOUNGOU, BURKINA FASO Mining activities expected to re-start in Q4-2020 Q2-2020 vs Q1-2020 INSIGHTS Production and AISC › Despite the COVID-19 pandemic, Boungou Production, koz AISC, US$/oz continued to process stockpiles with minimal impact 63koz › Production decreased sli

  34. Slide 34: Project Development Activities

    DETAILS BY MINE & PROJECT PROJECT DEVELOPMENT ACTIVITIES Studies are underway on Kalana and Fetekro INSIGHTS NAME Kalana Fetekro Bantou Nabanga › While the main focus for 2020 is cash flow generation, Endeavour is also continuing to COUNTRY Mali Côte D’Ivoire Burkina Faso Burkina Faso build optional

  35. Slide 35: Conclusion

    SECTION 4 CONCLUSION ® ENDEAVOUR MINING

  36. Slide 36: Strong Upcoming Catalysts

    CONCLUSION STRONG UPCOMING CATALYSTS Exposure to strong fundamentals UPCOMING CATALYSTS TIMING CATALYST Immediate Q3-2020 Houndé Start of mining higher grade Kari Pump deposit Cash Flow from Production Q3-2020 Ity Updated Le Plaque reserve estimate and updated Ity mine plan Maiden reserve estimate f

  37. Slide 37: Key Priorities

    CONCLUSION KEY PRIORITIES Strong focus on shareholder returns ATTRACTIVE PROFILE AS LEADING WEST AFRICA PRODUCER KEY PRIORITIES +1Moz <$900/oz Annual production All-in Sustaining Cost <0.5x Net Debt / adj EBITDA leverage ratio ACHIEVE PRODUCTION CONTINUE TO EXPLORE TO EXTEND MINE LIVES AND BUILD Ann

  38. Slide 38: Appendix

    SECTION 5 APPENDIX ENDEAVOUR MINING

  39. Slide 39: 2020 Guidance

    APPENDIX 2020 GUIDANCE INSIGHTS Guidance Summary › Endeavour is maintaining its FY-2020 production and AISC ENDEAVOUR SEMAFO PRO FORMA guidance. The Company expects to mitigate the impact of Production, Koz 680 — 740 315 — 355 995 — 1,095 the COVID-19 pandemic due to the higher grade profile AISC, $

  40. Slide 40: 2020 Guidance (continued)

    APPENDIX 2020 GUIDANCE (continued) SUSTAINING COSTS INSIGHTS Sustaining Capital Expenditure Guidance H2-2020 H1-2020 2020 FULL-YEAR › Mine sustaining capital expenditure guidance for Endeavour's mines is (All amounts in US$m) GUIDANCE ACTUAL GUIDANCE expected to remain unchanged at $83m as an increa

  41. Slide 41: Agbaou Mine, Côte D'Ivoire

    APPENDIX AGBAOU MINE, CÔTE D’IVOIRE Exploration program of up to $2 million has been planned for 2020 Agbaou Site Map INSIGHTS › An exploration program of up to $2m has been planned for 2020 with the aim of continuing to test targets located along extensions of known deposits and on parallel trends

  42. Slide 42: Karma Mine, Burkina Faso

    APPENDIX KARMA MINE, BURKINA FASO Exploration program of up to $2 million has been planned for 2020 INSIGHTS Karma Site Map › An exploration program of up to $2m has been planned for 2020 with the aim of in-fill drilling and testing extensions of known deposits › Minimal work was done in H1-2020 as

  43. Slide 43: Production and Cost Details by Mine (Quarterly)

    APPENDIX PRODUCTION AND COST DETAILS BY MINE On a quarterly basis AGBAOU ITY CIL KARMA HOUNDÉ MANA BOUNGOU (on a 100% basis) Q2-20 Q1-20 Q2-19 Q2-20 Q1-20 Q2-19 Q2-20 Q1-20 Q2-19 Q2-20 Q1-20 Q2-19 Q2-20 Q1-20 Q2-20 Q1-20 Physicals Total tonnes mined – OP1 000t 5,248 6,433 6,556 5,374 5,226 3,869 4,8

  44. Slide 44: Production and Cost Details by Mine (Year to Date)

    APPENDIX PRODUCTION AND COST DETAILS BY MINE On a year to date basis AGBAOU ITY CIL KARMA HOUNDÉ MANA BOUNGOU (on a 100% basis) H1-20 H1-19 H1-20 H1-19 H1-20 H1-19 H1-20 H1-19 H1-20 H1-20 Physicals Total tonnes mined – OP1 000t 11,681 12,773 10,600 7,224 9,755 10,430 22,820 18,543 8,859 — Total ore

  45. Slide 45: Reserves and Resources

    APPENDIX RESERVES AND RESOURCES As of December 31, 2019 Houndé Mine Resources shown inclusive of Tonnage Grade Content Ity Mine Resources shown inclusive of Tonnage Grade Content Reserves. On a 100% basis (Mt) (Au g/t) (Au koz) Reserves. On a 100% basis (Mt) (Au g/t) (Au koz) Proven Reserves 1.8 1.6

  46. Slide 46: Working Capital Movements

    APPENDIX WORKING CAPITAL MOVEMENTS Working Capital Movement ─ Q2-2020 THREE MONTHS ENDED June 30, 2020 March 31, 2020 Q2-2020 Comments Increased mainly due to a $7 million increase in VAT receivables at Houndé Trade and other receivables (11) (7) and a $5 million short-term loan to the BCM Group. Tr

  47. Slide 47: Tax Payments and Capex Spend by Mine

    APPENDIX TAX PAYMENTS AND CAPEX SPEND BY MINE Sustaining Capital Non-Sustaining Capital THREE MONTHS ENDED SIX MONTHS ENDED THREE MONTHS ENDED SIX MONTHS June 30, March 31, June 30, June 30, June 30, ENDED (All amounts in US$m) 2020 2020 2019 2020 2019 June 30, March 31, June 30, June 30, June 30, A

Endeavour Mining — Q2 2020 Earnings Presentation on 6ix