Banyan Gold Corp. · TSXV:BYN

Banyan Gold — Investor Presentation (June 2021)

24 slides from Banyan Gold's investor presentation, Jun 21, 2021

  1. Slide 1: Building Gold Resources in Yukon

    TSX.V: BYN BUILDING GOLD RESOURCES IN YUKON INVEST ALONGSIDE SOME OF THE BEST! 1 June 21, 2021

  2. Slide 2: Cautionary Note Regarding Forward-Looking Information

    TSX.V: BYN Cautionary Note Regarding Forward-Looking Information: Information set forth in this document may contain forward-looking statements under applicable securities law. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking stateme

  3. Slide 3: Why Banyan Gold?

    WHY BANYAN GOLD? TSX.V: BYN ✓ Multi-Million Ounce Gold Potential – AurMac ✓ Maiden Inferred Resources – Near Surface / Open in all directions ✓ Comparable grades/mining to nearby operating gold mine ✓ Near Term Target – Test area for potential to host 2 M ounce inferred resources ✓ Management – trac

  4. Slide 4: Experienced Leadership

    EXPERIENCED LEADERSHIP TSX.V: BYN Mark Ayranto: Chairman Tara Christie, M.A.Sc., P.Eng: President & CEO, Director • Mining Executive: Victoria Gold, StrataGold • +20 years mining, exploration, permitting, community relations, working • +20 years project development experience with First Nations, fie

  5. Slide 5: Invest with Industry Leaders

    INVEST WITH INDUSTRY LEADERS TSX.V: BYN 0.45 Validation by some of the best in the business 0.4 Release of Maiden AurMac Resource 20+ Industry professionals & mining CEO’s as shareholders 0.35 Insiders 0.3 9.2% 8.4% 17% interest in VGCX 0.25 purchased May 2021 0.2 0.15 0.1 0.05 8.8% 0 20/02/04 20/02

  6. Slide 6: Yukon Will Be Golden in 2021

    YUKON WILL BE GOLDEN IN 2021 TSX.V: BYN ADJACENT TO PRODUCING MINES YUKON WILL BE GOLD IN 2021 Victoria Gold - 220,000 oz/year Alexco Resource Corp. - high grade silver mine NEW YUKON GOLD RUSH ▪ Highly prospective Gold belt ▪ Investments by majors validates geology and jurisdiction ‒ Newmont Gold C

  7. Slide 7: AurMac Gold – Maiden Resource – 2021 Exploration

    AURMAC GOLD – MAIDEN RESOURCE – 2021 EXPLORATION TSX.V: BYN 2021 Exploration Program ▪ 22,000 m+ drilling ▪ Build Gold ounces & grade at Powerline ▪ Drill Aurex Hill Target towards an initial resource Project Analogue – Victoria Gold – new mine in production since 2019 ▪ Grade of deposit: 0.63 g/t ▪

  8. Slide 8: AurMac Project 2020 – Airstrip Extension

    AURMAC PROJECT 2020 – AIRSTRIP EXTENSION TSX.V: BYN Highlights: ▪ 0.75 g/t Au over 116 m ▪ 0.74 g/t Au over 113 m ▪ 0.92 g/t Au over 63.5 m ▪ 0.89 g/t Au over 59.2 m ▪ 0.62 g/t Au over 59.8 m 125 m ▪ 8.33 g/t Au over 1.4 m extension 300 m Airstrip Resource - 774,926 Oz ▪ 2.38 g/t Au over 10.6 m at 0

  9. Slide 9: AurMac Project 2020 – Powerline Zone

    AURMAC PROJECT 2020 – POWERLINE ZONE 500M STRIKE EXTENSION CONSISTENT WITH MODEL TSX.V: BYN 500 meters A A’ Highlight: 1.07 g/t Au over 68.5 m “Part of a much larger gold system than Powerline Resource” Powerline open in all directions and at depth 9

  10. Slide 10: Expanding Powerline to the East and South – 2020

    EXPANDING POWERLINE TO THE EAST AND SOUTH – 2020 Final Results TSX.V: BYN • 0.48 g/t Au over 186.0 m from surface • Including 1.39 g/t Au over 41.7 m • 0.47 g/t over 170.8 m from surface • 1.09 g/t Au over 19.1 m from 11.4 m • 0.77 g/t Au over 122.0 m from 12.0 m o Including 1.02 g/t Au over 22.6 m

  11. Slide 11: Expanding Powerline South – 3rd Set of 2021 Results

    EXPANDING POWERLINE SOUTH – 3rd set of 2021 Results TSX.V: BYN visible gold from 69.6 m in hole AX-21-75, which assayed 17.9 g/t over 0.6 m. • 0.73 g/t Au over 56.6 metres from 38.1 m in AX-21-75 • 0.55 g/t Au over 81.2 metres from 86.5 m in AX-21-73 • 0.37 g/t Au over 129.3 metres from hole AX-21-7

  12. Slide 12: Expanding Powerline South – June 7, 2021 Results

    EXPANDING POWERLINE SOUTH – June 7, 2021 Results TSX.V: BYN • 1.03 g/t Au over 81.4 metres from 32.0 metres in AX-21-88; • 0.50 g/t Au over 76.2 metres from surface in AX-21-79; • 0.50 g/t Au over 33.1 metres from 62.2 metres AX-21-83; • 0.47 g/t Au over 13.1 metres from 175.3 m in AX-21-80 12

  13. Slide 13: Mineralization from Powerline to Aurex Hill

    MINERALIZATION FROM POWERLINE TO AUREX HILL TSX.V: BYN B B’B’ 0.91 g/t Au over 20.5 m A A’ Near Term Goal at Powerline - 100 m grid drilling to expand Powerline Mineralized Footprint from and area of 160,000 m2 to 900,000 m2 Consistent Mineralization over 2.5 KM to Aurex Hill Target 13

  14. Slide 14: Near-Surface Resource Expansion Potential

    NEAR-SURFACE RESOURCE EXPANSION POTENTIAL TSX.V: BYN ▪ Airstrip Resource Area & soil – 1.2km x 300m – expanded by 300m west Airstrip Resource - 774,926 Oz at 0.52 g/t Au ▪ Aurex Hill – Au-soils >10 km2 ▪ On-surface, bulk-tonnage gold mineralization C’ ▪ Powerline– Blind near surface target Powerline

  15. Slide 15: Aurex Hill – Analysis of Historic RAB Results to Guide Exploration

    AUREX HILL – ANALYSIS OF HISTORIC RAB RESULTS TO GUIDE EXPLORATION TSX.V: BYN Select RAB Highlights*, near surface Gold: 1.18 g/t over 39.6 m 1.44 g/t over 15.2 m 1.54 g/t over 9.1m . ▪ Large highly prospective area (>10 km2) ▪ Cut off grade at Victoria Gold’s Eagle mine is 0.15 g/t ▪ Widespread are

  16. Slide 16: 2021 Drill Area - Aurex Hill

    2021 DRILL AREA - AUREX HILL TSX.V: BYN ▪ 5000 m initially planned to link RAB drill grid areas with Diamond Drilling 16

  17. Slide 17: 2021 Drilling – Target + 2 Million Ounces Au

    2021 DRILLING – TARGET + 2 MILLION OUNCES Au TSX.V: BYN Airstrip Resource - 774,926 Oz at 0.52 g/t Au ▪ 10,000 m DDH at Powerline complete ▪ ~5,000 m DDH Aurex Hill –in progress ▪ Primary Goal of 2021 Program: – 2M ounce gold inferred resource among Airstrip, Powerline and Aurex Hill Zone ▪ Phase II

  18. Slide 18: 90% Gold Extraction – 2021 Metallurgical Studies

    90% GOLD EXTRACTION – 2021 METALLURGICAL STUDIES TSX.V: BYN ▪ 90 % average recovery from Airstrip and Powerline – (Oxide and Sulphide) – Forte Analytical, Colorado ▪ Gold is not refractory ▪ Rapid leaching ▪ No correlation between sulphide content and gold recovery ▪ Additional bottle rolls and colu

  19. Slide 19: ESG: Matters

    ESG: MATTERS TSX.V: BYN President and Founder of $150,000 available for “Every Student, Every Day” 2021/22 Community Engagement charity Attendance and education Safety Standards Over $1,200,000 distributed even more important after Environmental Standards all across the Yukon COVID Support & Involve

  20. Slide 20: Over 1.1 Million Ounces Au in Inferred and 200K Indicated Yukon Resources

    OVER 1.1 MILLION OUNCES AU IN INFERRED AND 200K INDICATED YUKON RESOURCES TSX.V: BYN MAY 2020 AURMAC INFERRED AurMac Gold Project Pit Constrained Resource: 903,945 Ounces @ 0.54 g/t Au Airstrip 774,926 Oz. at 0.52 g/t Au Powerline 129, 019 Oz. Au at 0.61 g/t Au At 0.2 g/t Au cutoff (NI-43-101) Refer

  21. Slide 21: Hyland Gold Project

    HYLAND GOLD PROJECT TSX.V: BYN ▪ Main Zone Resource (0.5 km2 area) -Open in all directions ▪ Focus on oxide within ~75 m of surface ▪ Column leach test average oxide gold recoveries 86% ▪ Existing infrastructure-roads/camps 2018 RESOURCE ▪ 186 km2 – underexplored – additional targets with 2.4-4.4g/t

  22. Slide 22: Re-rate Opportunity

    RE-RATE OPPORTUNITY TSX.V: BYN Market Cap Market Cap per Oz 300 200 180 180 250 160 140 200 105 (per Oz Resource) 120 Market Cap Market Cap ($Cdn) 150 100 48 80 100 54 31 38 60 29 40 50 19 20 268 101 83 77 61 59 55 48 0 0 Gold Standard Amarillo Gold White Gold Corp. St. James Gold Whitehorse Gold Ca

  23. Slide 23: Why Invest in Banyan?

    WHY INVEST IN BANYAN? TSX.V: BYN Perfect Storm for Re-rate Catalysts ✓ Gold price and deficits worldwide ✓ Funded 2021 drilling - 2 drills turning! ✓ Gold resources depleting industry wide ✓ Long 2021 drill season planned (Feb. to Dec) ✓ Adjacent to two producing mines ✓ 2021 drill results continuou

  24. Slide 24: Building Gold Resources to Fill the Upcoming Demand

    TSX.V: BYN INVEST ALONGSIDE SOME OF THE BEST! EMAIL: info@banyangold.com WEBSITE: www.BanyanGold.com Tara Christie @BanyanGold President & CEO Banyan-Gold-Corp tchristie@banyangold.com BanyanGoldCorp T: (888) 629-0444 Banyan Gold 24 BUILDING GOLD RESOURCES TO FILL THE UPCOMING DEMAND

Banyan Gold — Investor Presentation (June 2021) on 6ix