Banyan Gold Corp. · TSXV:BYN
Banyan Gold — Investor Presentation (November 2026)
20 slides from Banyan Gold's investor presentation, Nov 10, 2026
Slide 1: Advancing a New Canadian Gold District
TS XV: BY N | OTCQB : BY AGF Advancing a New Canadian Gold District Nove mber 10 , 20 26 C OR PO R A TE PR ESEN TA TION 1
Slide 2: Forward-Looking Statements
L EGAL DI SCL O SURE Forward-Looking Statements F OR W A R D - L OO K I N G I N F O R M A T I O N A D D I T I O N A L A S S U M P T I O N S & F A C T OR S This presentation contains forward-looking information, which is not comprised of Factors that could cause actual results to differ materially fr
Slide 3: Scale to Matter. Capital to Execute. Value to Create.
IN VESTMENT PROPOSITION Scale to Matter. Capital to Execute. Value to Create. Banyan is moving from resource delineation toward demonstrating economic value and development readiness. 3.64 M oz. Indicated, 4.98 Moz. Inferred MI L ESTO NES AHEAD ~10M ounce deposits are rare. Generational Scale Opport
Slide 4: From discovery success to development value
OUR NEXT CHAPTER From discovery success to development value The next investment catalysts must resolve the questions that determine whether AurMac becomes a financeable mine. 01 02 03 04 DEFINE THE MINE CONTROL CAPITAL REDUCE RISK MAXIMIZE UPSIDE Throughput, initial grade, Phase development where A
Slide 5: A Jurisdiction Built for Mining
A JURISDICTION BUILT FOR MINING & TSxXV: BYN | OTCQB: BYAGF
Slide 6: Capital Structure
CA PITAL MARK ETS Capital Structure S H A R E H OL D E R O W N E R S HI P Insiders & Management Current Price $1.61 52-Wk High/Low $2.20 / $0.64 CEO - Tara Christie Shares Outstanding 473M Market Cap ~$780M Total Insiders 4% Fully Diluted 505M Cash (October) ~$100 M VGCX no longer holds any Banyan s
Slide 7: Recent Financings & Analyst Coverage
CA PITAL MARK ETS Recent Financings & Analyst Coverage R E CE N T F I N AN C I N G S A N AL Y S T CO V E R AG E September 2026 $54.3 MILLION hard dollars at $2.00 Simon Wildsmith Desjardins $3.50 Ovais Habib Scotiabank $3.00 May 2026 $46.5 MILLION Rabi Nizami National Bank $3.00 $29.7M flow-through
Slide 8: Closing the Gap Between Airstrip & Powerline
EX PLORATION UPD ATE Closing the Gap Between Airstrip & Powerline Two sections through the gap between Airstrip and Powerline — both hit high-grade gold near surface CROSS-SECTION 466750mE CROSS-SECTION 466750mE ·· AX-26-874 AX-26-874 CROSS-SECTION 467250mE CROSS-SECTION 467250mE ·· AX-26-942 AX-26-
Slide 9: Robust Recoveries, Clear Permit Pathway
METALLUR GY & PE RMITTING Robust Recoveries, Clear Permit Pathway M E TA L LU R G Y — R O B US T R E CO V E R IE S P E RM I T T IM E LIN E Year 1 Year 2 Year 3 Year 4 Year 5 93% Gold Recovery PEA / PFS Carbon-in-leach (CIL) / Carbon-in- Baseline Studies 93% pulp (CIP) process with gravity. YESAB 84%
Slide 10: AurMac vs. Select Open-Pit Gold Projects, North America
PE ER COMPA RIS ON AurMac vs. Select Open-Pit Gold Projects, North America MINEABLE OZ 3.64 M oz Au at 0.68 g/t Indicated MRE 4.98 M oz Au at 0.58 g/t Inferred MRE Talamore Mining, backed by Pierre Lassonde, purchased the Yukon Coffee Gold Project from Newmont 9.0M* oz 9.0M* oz 8.8M oz 8.8M oz 3.0M
Slide 11: 2026 Milestones Delivered — and the Catalysts Ahead
MILES TONE S & CA TALYS TS 2026 Milestones Delivered — and the Catalysts Ahead Thirteen milestones delivered to date this year — each catalyst ahead closes a specific valuation discount DEL IV ERED — 2026 FEB 1 8 FEB 2 6 MAY 6 MAY 15 JUN 11 JUN 15 JUN 17 JUL 28 AUG 17 AUG 25 SE P 1 4 SE P 2 4 SE P 2
Slide 12: Build the capability to build a mine
DEVELOPMENT STRATEGY Build the capability to build a mine Exceptional technical teams, realistic engineering and continuity of expertise reduce execution risk. PEOPLE Retain geologists and recruit experienced engineering, permitting and construction leaders as needed. PROCESS Create an integrated pa
Slide 13: Building the Right Team
LEADE RS HIP Building the Right Team MANAG EMENT TEAM Tara Christie David Rutt Kai Woloshyn Jasmine Sangria Duncan MacKay Patrick Langlois Tanuja Skerlec MASc, P.Eng CMA, CPA BSc MBA MSc, P.Geo MBA, CFA VP Corporate Affairs President & CEO Chief Financial Officer VP Project Development VP Corporate
Slide 14: Explore for economic impact and the next discovery
EXPLORATION IS ESSEN TIAL Explore for economic impact and the next discovery AurMac resource expansion, higher-grade opportunities and Nitra targets form a long-duration exploration engine. • Known intrusions at AURMAC surface Prioritize • Soil anomalies grade, • Placer mines • Soil Anomalies contin
Slide 15: Franco-Nevada: $52.2M Royalty + $20M Equity
CH ECK LIS T 06 · CAT AL YS TS – ST RAT EGI C I NVE ST OR Franco-Nevada: $52.2M Royalty + $20M Equity AurMac Project with NSR Purchase area in darker grey. Current Resource area shown in black. The $52.2M covers a 6% NSR originally issued to Victoria Gold Corp.*, with an option for Banyan to reduce
Slide 16: Committed to Community & Responsible Growth
GIV ING BACK Committed to Community & Responsible Growth Yukon Geoscience Award Every Student, Every Day For contributing toward the development Registered charity co-founded by Tara Christie to of healthier communities and protecting support grassroots educational projects that the natural environm
Slide 17: Yukon Context — New Government, 2025
JURISDICTION C ONTE XT Yukon Context — New Government, 2025 Yukon election November 3, 2025; new Conservative government sworn in November 22. Pro-development signals across key ministries P R E MI E R & F I N A N C E Strong mandate for economic Currie Dixon development and resource sector growth. E
Slide 18: Eagle Gold Mine — Update, October 22, 2026
M&A WATCH Eagle Gold Mine — Update, October 22, 2026 Who is Boroo? Boroo is a Singapore-based private mining company recognized as a specialist in operational turnarounds. B A NY A N P E R CE P T I ON Since 2018, Boroo has completed four strategic acquisitions and transformed into a premier mid-tier
Slide 19: What Investors Should Know Over the Next 12 Months
IN VES TME NT CAS E What Investors Should Know Over the Next 12 Months Each milestone should reduce a specific valuation discount ECONOMIC Throughput, early-year grade, production and costs, credible project 01 PEA MINE PLAN CREDIBILITY 02 INITIAL CAPITAL Prove a financeable path with strong economi
Slide 20: Contact
Banyan Gold is committed to environmental stewardship, sustainable development, advancing the principles Tara Christie of reconciliation, and shared President & CEO tchristie@banyangold.com generational prosperity for First Nations (888) 629-0444 and communities. Jasmine Sangria VP Corporate Communi