Contango Silver & Gold Inc. · AMEX:CTGO

Contango Silver & Gold — Contango ORE — Investor Presentation (November 2024)

46 slides from Contango Silver & Gold's investor presentation, Nov 14, 2024

  1. Slide 1: Corporate Presentation November 2024

    NYSE-A:CTGO CORPORATE PRESENTATION CONTANGO Ox= GOLD SILVER CO PIPER NOVEMBER 2024 WWW.CONTANGOORE.COM

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS The Feasibility Study (“FS”) referenced herein that relates to Peak Gold, LLC (“Peak Gold”), was prepared by Kinross Gold Corporation (“Kinross”), which controls the Manager of Peak Gold and holds 70% of its outstanding membership interests, in accordance with Canadian Nat

  3. Slide 3: Building Alaska's Next Gold Mines

    dian Ya CON VAN? O OR Gaeaee GOLD SILVER COPPER BUILDING ALASKA’S NEXT-GOLD MINES CONTANGO ORE IS AN AMERICAN, NEW YORK STOCK EXCHANGE LISTED COMPANY WITH HEADQUARTERS IN FAIRBANKS, ALASKA. MANH CHOH LUCKY SHOT \|JOHNSON TRACT MINE MINE PROJECT IN PRODUCTION FULLY PERMITTED 1M OZ GRADING.9.4G/T AU E

  4. Slide 4: Company Profile and Capital Structure

    COMPANY PROFILE CAPITAL STRUCTURE TRADING - NYSE AMERICAN: CTGO1 90-Day Avg. Daily Volume 76,000 shares per day 52-week range US$14.03 - $25.32 Market Cap $222 M *Russell 2000 Inclusion - June 26, 2023 CAPITAL STRUCTURE1 Issued & Outstanding 12.2 M Warrants 0.8 M Options 0.1 M Fully Diluted 13.1 M F

  5. Slide 5: Alaskan Focused Portfolio Executing on Direct Ship Ore Model

    FAIRBANKS ANCHORAGE ALASKAN FOCUSED PORTFOLIO EXECUTING ON OUR DIRECT SHIP ORE MODEL (DSO) FORT KNOX MILL (Kinross) Early-Stage Exploration Advanced Stage Exploration (Reserves/Resources) Production MANH CHOH MINE (30%)1 Production started Q3 2024 1Moz resource at 8 g/t GEO with exploration upside E

  6. Slide 6: Manh Choh – A DSO Success

    MANH CHOH – A DSO SUCCESS CONTANGO’S FLAGSHIP PROJECT – COMMERCIAL PRODUCTION AS OF JULY 2024 Campaign #1 16,200 oz Gold for total sales of $36M USD *Images used with permission from Kinross IN PRODUCTION On schedule and on budget Permits and construction completed in under 2 years 3 years to produc

  7. Slide 7: Manh Choh Mine Production from Campaigns #1 & #2 Completed

    MANH CHOH MINE PRODUCTION FROM CAMPAIGNS #1 & #2 COMPLETED See news release dated August 19, 2024 “Contango Announces Results of the First Batch of Gold Production from Manh Choh Gold Mine, Alaska”: https://www.contangoore.com/press-release/contango-announces-results-of-the-first-batch-of-gold-produ

  8. Slide 8: Manh Choh Mine Production from Campaigns #1 & #2 Completed

    MANH CHOH MINE PRODUCTION FROM CAMPAIGNS #1 & #2 COMPLETED See news release dated November 14, 2024 “Contango Announces earnings for the Quarter ended September 30, 2024”.

  9. Slide 9: Manh Choh 2024 Drill Program in Progress

    MANH CHOH $4.7 Million 2024 DRILL PROGRAM IN PROGRESS WITH RESULTS IN Q4 Testing mineral systems concepts: Near-mine structural targets Augmented with in-pit mapping efforts Mineralized structures from Geochem surveys 2. Geophysical targets with connections to mineralized source Conductivity, charge

  10. Slide 10: Manh Choh Regional Exploration

    MANH CHOH REGIONAL EXPLORATION: 675,000 acres Leased from Tetlin Tribe Continuing reconnaissance sampling in the southern target zones Grid soil sampling in gridded target zones 2024 REGIONAL PLAN MANH CHOH 1km2

  11. Slide 11: Well Positioned Compared to Peers: AISC

    WELL POSITIONED COMPARED TO PEERS LOWER QUARTILE AISC AMONG PEER GROUP Source: Company Materials, brokers’ estimates Note: Based on average of brokers’ estimates unless otherwise noted Shown on a co-product basis Based on mid-point of 2024 guidance AISC based on SK-1300 estimates. Please refer to th

  12. Slide 12: Well Positioned Compared to Peers: Free Cash Flow per Share

    WELL POSITIONED COMPARED TO PEERS PROJECTED ANNUAL FREE CASH FLOW PER SHARE (2025E; US$/SHARE) Source: S&P Capital IQ, Cormark Research Note: As of August 28, 2024 Based on Contango’s LOM annual average operating cash flow less corporate G&A and other expenses Based on Contango’s hedged gold price o

  13. Slide 13: Manh Choh Mine Attractive Economics as Non-Operating Partner

    MANH CHOH MINE ATTRACTIVE ECONOMICS AS NON-OPERATING PARTNER 2024 – 2025 Guidance Feasibility AISC: $1,116/Oz – 2024 Guidance: $1200/Oz 2024 production guidance - 30,000 to 40,000 ounces 2024 year-end cash on hand - $30 to $40 million Pay down credit facility to $52 million in 2024 2025 production g

  14. Slide 14: Manh Choh Mine Success of DSO Approach

    MANH CHOH MINE CTGO SUCCESS OF DSO APPROACH DSO CRITERIA High-grade resources Gold, Silver, Copper focus Near Infrastructure Road Rail Water Simple permitting from a mining perspective Minimal water and wetlands impact Simple mining/processing Private and State lands 2020/2021 2022 2023 2024 JV with

  15. Slide 15: Alaskan Focused Portfolio Executing on Direct Ship Ore Model

    FAIRBANKS ANCHORAGE ALASKAN FOCUSED PORTFOLIO EXECUTING ON OUR DIRECT SHIP ORE MODEL (DSO) FORT KNOX MILL (Kinross) Early-Stage Exploration Advanced Stage Exploration (Reserves/Resources) Production MANH CHOH MINE (30%)1 Production started Q3 2024 On-going exploration Est. annual production of 67,50

  16. Slide 16: Lucky Shot – Our Next DSO Project

    LUCKY SHOT – OUR NEXT DSO PROJECT FOCUSED ON RESOURCE EXPANSION OVER THE NEXT 2-3 YEARS DEVELOPMENT Historically producing district: 250,000 ozs averaging 40 g/t Au Mesothermal quartz vein with free gold +1 mi (1.6 km) strike length Contango controls entire district Underground is fully refurbished

  17. Slide 17: Lucky Shot – Potential of 400,000 to 500,000 GEO

    LUCKY SHOT – OUR NEXT DSO PROJECT POTENTIAL OF 400,000 to 500,000 GEO PATENT CLAIMS COLEMAN VEIN LUCKY SHOT VEIN COLEMAN ADIT ENSERCH TUNNEL LUCKY SHOT ADIT LOOKING NORTH FISHHOOK-WILLOW CREEK RD

  18. Slide 18: Lucky Shot Development: Planned Infill Drill Program

    LUCKY SHOT – OUR NEXT DSO PROJECT POTENTIAL OF 400,000 to 500,000 GEO LUCKY SHOT DEVELOPMENT Planned 15,000m in-fill drill program for resource definition OBJECTIVES: Define high-grade “ore shoots” Delineate 400,000 to 500,000 GEO Collect data for detailed mine plan Targeting 30,000 to 40,000 initia

  19. Slide 19: Lucky Shot – Willow Creek District Scale Opportunity

    LUCKY SHOT – WILLOW CREEK DISTRICT SCALE OPPORTUNITY DEVELOPMENT Historic High-Grade Gold Mining District Initial Discoveries 1890’s 20+ Historic Mines and Prospects Relatively “unmined” since 1942 Mesothermal, shear hosted quartz +Au veins LUCKY SHOT Lucky Shot ore with visible gold Coleman

  20. Slide 20: Alaskan Focused Portfolio Executing on Direct Ship Ore Model

    FAIRBANKS ANCHORAGE ALASKAN FOCUSED PORTFOLIO EXECUTING ON OUR DIRECT SHIP ORE MODEL (DSO) FORT KNOX MILL (Kinross) Early-Stage Exploration Advanced Stage Exploration (Reserves/Resources) Production MANH CHOH MINE (30%)1 Production started Q3 2024 On-going exploration Est. annual production of 67,50

  21. Slide 21: Johnson Tract Development

    JOHNSON TRACT DEVELOPMENT Robust grades + thickness ~1.1M oz @ 9.4 g/t GEO 40m true width Located on the coast Marine transport is lowest form of bulk transport Private land owned by CIRI Corporation Ideal for low-cost underground mining Subvertical Bulk-mining widths Ramp access Bottom-up/gravity a

  22. Slide 22: Johnson Tract Private Surface Rights

    JOHNSON TRACT PRIVATE SURFACE RIGHTS (CIRI OWNERSHIP) WIDE FLAT VALLEY WITH MINIMAL WETLANDS JOHNSON TRACT DEVELOPMENT Valley is well suited for infrastructure 50-man camp 267 DDH: +80,000m drilled 2024 Program Focused On: Infill drilling at resource Hydrological testing Geotechnical testing Metallu

  23. Slide 23: Johnson Tract Attractive Attributes for Underground Mining

    JOHNSON TRACT ATTRACTIVE ATTRIBUTES FOR UNDERGROUND MINING JOHNSON TRACT DEVELOPMENT Potential for short lateral UG ramp to base of the Johnson Tract Deposit Gravity assist, bottom-up mining Highest grade accessed first

  24. Slide 24: Johnson Tract Plan to Initiate UG Ramp/Mining Permitting

    JOHNSON TRACT PLAN TO INITIATE UG RAMP/MINING PERMITTING IN H2 2024 JOHNSON TRACT DEVELOPMENT View in previous slide JT DEPOSIT Potential for short lateral UG ramp to base of the Johnson Tract Deposit Gravity assist, bottom-up mining Highest grade accessed first Exploration/Development tunnel to tar

  25. Slide 25: Johnson Tract Robust Grades with Thick Intercepts

    JOHNSON TRACT ROBUST GRADES WITH THICK INTERCEPTS; GREAT METALLURGY & IDEAL FOR UNDERGOUND MINING METHODS 108.6 m of 10.4 g/t Au, 7.6% Zn, 0.7% Cu, 2.0% Pb and 8 g/t Ag 71.4 m of 20.9 g/t Au, 9.8% Zn, 0.9% Cu, 1.6% Pb, and 9 g/t Ag 99.7 m of 10.1 g/t Au, 6.7 g/t Ag, 0.9% Cu, 1.3% Pb, and 6.3% Zn 137

  26. Slide 26: Johnson Tract Excellent Metallurgy

    JOHNSON TRACT EXCELLENT METALLURGY Highlights include: Gold recovery of 97.2% Zinc recovery of 92.3% to a concentrate grading 52.6% zinc Copper recovery of 84.5% to a concentrate grading 30.6% copper Coarse primary grind size of 125 microns More metallurgy and geometallurgical work is planned JT Dep

  27. Slide 27: Johnson Tract 2024 Surface Infill Drilling

    JOHNSON TRACT 2024 SURFACE INFILL DRILLING 2024 INFILL DRILLHOLES IN RED Infill the upper 1/3 of the JT resource from surface Upgrade inferred parts of JT resource to Indicated Upgrade indicated parts of the JT resource Measured ~3,000 m at 25 m spacing HYDROLOGIC TESTING 2024 DRILLHOLES IN BLUE Thr

  28. Slide 28: Johnson Tract Exploration Upside – New Geophysical Targets

    Ellis Zone discovery 4km NE of JT Deposit 578 g/t Au and 2,023 g/t Ag over 6.4 m JOHNSON TRACT EXPLORATION UPSIDE – NEW GEOPHYSICAL TARGETS 2023 geophysical survey defines 12km (7.5 mi) mineral trend Geophysics, geochemistry and geology define Distinct +10km long epithermal/VMS trend Two potential i

  29. Slide 29: Contango's Development Pipeline

    CONTANGO’S DEVELOPMENT PIPELINE Focused on three Advanced-Stage Exploration Projects to support 200,000 GEO production by 2030 MANH CHOH LUCKY SHOT JOHNSON TRACT Fully permitted and producing gold Permits received in less than 2 years Built on time and on budget First gold pour on July 8, 2024 Campa

  30. Slide 30: Building Our ESG Framework

    BUILDING OUR ESG FRAMEWORK DEVELOPING OUR STRATEGY AROUND OUR BUSINESS MODEL AND CORE VALUES BUILT ON OUR FUNDAMENTAL DSO CRITERIA High-grade resources Gold, Silver, Copper focus Near Infrastructure Road Rail Water Simple permitting from a mining perspective Minimal water and wetlands impact Simple

  31. Slide 31: Building Contango into a Hybrid Royalty Company

    BUILDING CONTANGO INTO A “HYBRID ROYALTY” COMPANY WHAT IS A HYBRID ROYALTY MODEL? High cash flow per employee: low overhead cost easier to manage Small Team of Experts Acquire or financially engineer royalties or streams; seek near-term production projects Acquire via cash or shares and then have ex

  32. Slide 32: Building Contango into a Hybrid Royalty Company

    BUILDING CONTANGO INTO A HYBRID ROYALTY COMPANY By Applying our DSO model alongside our healthy balance sheet and strong cash flows, we stand out among, not only our peers, but the tech companies in terms of revenue/employee LOW SHARE COUNT NYSE-LISTING ACCESS TO CAPITAL CTGO BUILT ON 3 PILLARS OF S

  33. Slide 33: Building Contango into a Hybrid Royalty Company: Orphan Projects

    BUILDING CONTANGO INTO A “HYBRID ROYALTY” COMPANY By identifying Opportunities with “Orphan Projects” that fit Contango’s DSO Criteria, we can build value for shareholders quicker than the traditional business model 1990’s NOW 5 YEARS 10-20 YEARS ORPHAN PERIOD

  34. Slide 34: Contango's Corporate Strategy: 5-Year Plan to Mid-Tier Gold Producer

    CONTANGO’S CORPORATE STRATEGY 5 YEAR EXECUTION PLAN TO BECOME A MID-TIER GOLD PRODUCER MANH CHOH MINE (30%)1 Production started Q3 2024 1Moz resource at 8 g/t GEO with exploration upside Est. annual production of 67,500 GEO2,3 :  +$75M4 (at $2,175 blended gold price) +$270M LOM5 free cash flow LUCK

  35. Slide 35: Thank You

    THANK YOU 36 Corporate Inquires: info@contangoore.com +1-907-888-4273 www.contangoore.com Twitter: @orecontango LinkedIn: Contango ORE Instagram: ContangoORE Facebook: Contango ORE QUESTIONS?

  36. Slide 36: Non-GAAP Reconciliation Disclaimer

    NON-GAAP RECONCILIATION DISCLAIMER This presentation contains forward looking estimates of all-in sustaining cost (“AISC”), resources, free cash flow and EBITDA, which are financial measures not determined in accordance with United States generally accepted accounting principles (“GAAP”). We cannot

  37. Slide 37: Why Contango

    WHY CONTANGO INNOVATIVE NEW BUSINESS MODEL FOR JUNIOR DEVELOPERS In Production with $36M gold sold during Campaign #1 Low share count with expected high cash flow per share US Focused: US listed with US-based projects High-grade resources Grade is King Cash Flow is Queen Expected to generate over $6

  38. Slide 38: Johnson Tract 2024 Drill Program in Progress

    JOHNSON TRACT 2024 DRILL PROGRAM IN PROGRESS A A’ JT Deposit JT Camp Portal Site Proposed Exploration Ramp 3,000m Oriented Core Program in 10 holes Short holes (~150m) targeting the upper 1/3 of resource to upgrade Resource category 2 deeper holes (~400m) through the ore body to support advanced Geo

  39. Slide 39: Johnson Tract Deposit Geology: Hybrid Epithermal-VMS Model

    JOHNSON TRACT DEPOSIT GEOLOGY: HYBRID EPITHERMAL-VMS MODEL Pueblo Viejo and Romero deposits in Dominican Republic are good analogues Sub-marine High-Sulfidation Epithermal/Porphyry systems with some VMS characteristics – telescoped system Dacite Quartz Porphyry Qtz-eye Dacite Andesite Cross-section

  40. Slide 40: Contango's Early-Stage Exploration Portfolio

    CONTANGO’S EARLY-STAGE EXPLORATION PORTFOLIO ALL ALONG THE ALASKAN ROAD SYSTEM EAGLE, NW OF MANH CHOH ALASKA HONA, NW OF MANH CHOH ALASKA TRIPLE Z, E OF MANH CHOH ALASKA SHAMROCK, ALASKA (RICHARDSON DISTRICT) AMANITA, ALASKA (FAIRBANKS DISTRICT) GOLDEN ZONE, CENTRAL ALASKA 64,900 acres of State of A

  41. Slide 41: Manh Choh Mine Attractive Economics as Non-Operating Partner

    MANH CHOH MINE ATTRACTIVE ECONOMICS AS NON-OPERATING PARTNER 1 See Contango’s SK1300 Manh Choh Technical Report Press Release dated May 26, 2023; Initial capex reflects the Kinross feasibility study reported in “Q2 Corporate Update ” Press Release and Corporate Presentation dated July 26 and 27, 202

  42. Slide 42: Contango's Reserves and Resources

    CONTANGO’S RESERVES AND RESOURCES CONTINUED ON NEXT PAGE Notes: Manh Choh Reserves 1. Published from 12MAY23 TRS The Manh Choh Project, Alaska, USA 2. The definitions for Mineral Resource in S-K 1300 were followed for Mineral Resources. 3. Mineral Reserves were estimated at long term prices of $1,30

  43. Slide 43: Contango's Reserves and Resources

    CONTANGO’S RESERVES AND RESOURCES Notes: Lucky Shot Resources 1. Mineral Resources were estimated as of 26 MAY 23 under definitions for Mineral Resources in S-K1300. See TRS Lucky shot Project Alaska, USA. 2. Mineral resources are estimated using long term prices of US$1,600/oz Au price. 3. Mineral

  44. Slide 44: Contango Management

    CONTANGO MANAGEMENT Mr. Van Nieuwenhuyse was appointed to serve as President, Chief Executive Officer, and director of the Company effective January 6, 2020. He previously served as President and Chief Executive Officer of Trilogy Metals Inc. from January 2012 until December 2019. Between May 1999 a

  45. Slide 45: Contango Directors

    CONTANGO DIRECTORS Co-founder of Contango Ore Chairman since 2013 Sole Manager of Juneau Exploration – a company involved in the exploration and production of oil and natural gas Petroleum Engineer with years of experience at Zilkha Energy Company, Texas International Company, Enserch Corporation, C

  46. Slide 46: Meet the Contango Team

    MEET THE CONTANGO TEAM Chris Kennedy General Manager – Lucky Shot Mine Dave Larimer Exploration Manager Nathan Steeves Johnson Tract Chief Geologist Allegra Cairns Director – Environment and Permitting Alina Wyatt Lands and Database Manager Vanessa Larimer Community Affairs & Operations Manager Shay

Contango ORE — Investor Presentation (November 2024) on 6ix