Endurance Gold Corporation · TSXV:EDG
Endurance Gold — Investor Presentation (November 2023)
45 slides from Endurance Gold's investor presentation, November 2023
Slide 1: North American Focused Gold Exploration Company
North American Focused Gold Exploration Company November 2023 TSX.V: EDG
Slide 2: Corporate Disclosure
2 Corporate Disclosure The information contained herein, while obtained from sources which we believe are reliable, is not guaranteed as to its accuracy or completeness. The company is an exploration stage mineral resource exploration company and none of its mineral projects have yet to be proven to
Slide 3: Corporate Snapshot and Key People
3 Corporate Snapshot Shares Outstanding (Aug 31, 2023) 145.4m Market Capitalization (C$0.22 – Aug 31, 2023) C$32 m Options (C$0.05 – C$0.34) 8.2 m Insiders Warrants (C$0.40 – C$0.55) 6.4 m own over 55% Fully Diluted (Aug 31, 2023) 160 m Working Capital (June 30, 2023) C$2.79 m* * includes marketable
Slide 4: Endurance Gold Corporation – Opportunities
Endurance Gold Corporation – Opportunities Endurance Gold – An Opportunity Generator with Pre-Existing Projects Divested for Cash, Shares, &/or Royalty such as: • Rattlesnake Hills Au, WY – SOLD to GFG Resources (TSX-V;GFG) • Pardo Paleoplacer Au, Ontario – SOLD to Inventus Mining (TSX-V;IVS) Curren
Slide 5: Core Gold Assets Highlights and Plans
5 Endurance Gold Corporation – Core Gold Assets HIGHLIGHTS AND PLANS 100% controlled - Drill-ready Gold Projects - top-ranked jurisdictions. Reliance Gold Project, B.C. – Epizonal Orogenic – 2022 Drilling • Next to a former +4 m ounce producer • Six phases of drilling – up to 15.7 gpt Gold over 28.4
Slide 6: Reliance Gold Project – 2023 Drilling Active
6 Reliance Gold Project – 2023 Drilling Active Southern BC – Within a Major Orogenic Gold Camp New High-Grade orogenic gold discovery - analogous to the Fosterville gold mine in a productive orogenic camp never systematically explored Reliance Eagle Area drill highlights: 15.7 gpt Gold over 24.8 m
Slide 7: Excellent Diamond Drill Results
7 Excellent Diamond Drill Results Significant Discovery in 73 Drill Holes (2021 to 2023) 52 (about 70%) significant gold intersections >3 m width & >10 gram-metre 14 holes - Excellent intersections between 63 and 426 gram-metre Excellent Intersections are: 15.7 gpt Gold over 24.8 m including 26.96 g
Slide 8: Entire Longitudinal Section – Open to Depth
8 Reliance Gold Project Entire Longitudinal Section – Open to Depth
Slide 9: Reliance Gold Project, Gold Bridge, BC
9 Reliance Gold Project, Gold Bridge, BC Program Activity Highlights 2020 to 2022 “Discovery Stage” Gold Project in a productive gold camp. 1. Early Exploration between 1985 and 2008 - limited focus over about 100 m - Never systematically explored 2. Progress since 2020 – Systematically Expanded pot
Slide 10: Reliance Gold Project – Royal Shear
10 Reliance Gold Project Bralorne Camp, Gold Bridge B.C. Iron Carbonate Treasure Alteration Shear Eagle South Camp Creek Eagle Shear Vista Imperial Bona Diplomat Grey Rock Carpenter Lake Royal Shear
Slide 11: Significant Drill Intersections over 1.5 km Trend
Reliance Gold Project Significant Drill Intersections over 1.5 km Trend 11
Slide 12: Eagle Zone at Eagle 3 Road – Shallow Dipping Shear Zone
12 Reliance Gold Project Eagle Zone at Eagle 3 Road – Shallow Dipping Shear Zone Structural Top of Horizontal Channel Sample with average 4.88 gpt Gold over 23.5 metres
Slide 13: Bedrock Channel Samples Eagle Zone
13 Reliance Gold Project Bedrock Channel Samples Eagle Zone Eagle & Eagle South Channel Samples indicate 550 m of strike trend
Slide 14: 2020, 2021 & 2022 RC Drilling
14 Reliance Gold Project, BC – 2020, 2021 & 2022 RC Drilling • Completed 84 RC Drill Holes in 2020, 2021 and spring 2022. • Significant gold intersections in majority of the RC holes (ie gold over greater than 3 m width) - with some excellent results such as: 14.08 gpt Gold over 15.24 m & 8.57 gpt G
Slide 15: 2021 to 2023 DDH Statistics
15 Reliance Gold Project, BC – 2021 to 2023 DDH Statistics 1. Completed 73 Diamond Drill Holes between 2021 to 2023 2. Majority of Drill holes at the Eagle Area – SIGNIFICANT DISCOVERY • 15.7 gpt Gold over 24.8 m including 26.96 gpt Gold over 4.1 m • 8.62 gpt Gold over 24.4 m including 17.02 gpt Gol
Slide 16: Eagle Zone Longitudinal Section – 550 m Trend
16 Reliance Gold Project Eagle Zone Longitudinal Section – 550 m Trend
Slide 17: Eagle Area Drill Plan and 2022 DDH Intercepts
17 Reliance Gold Project Eagle Area Drill Plan and 2022 DDH Intercepts Eagle Zone 550 x150 m area Av. 5.17gpt / 9.6 m 71 RC & DDH
Slide 18: Royal Shear Geology & Cross Sections
Reliance Gold Project Royal Shear Geology & Cross Sections 18
Slide 19: Eagle Cross Section DDH23-070, -072, -073
19 Reliance Gold Project Eagle Cross Section DDH23-070, -072, -073
Slide 20: Eagle NW Extension Cross Section DDH23-071
20 Reliance Gold Project Eagle NW Extension (Crown Area) Cross Section DDH23-071
Slide 21: Reliance - Imperial Zone Drill Plan
21 Reliance - Imperial Zone Drill Plan
Slide 22: Entire Longitudinal Section
Reliance Gold Project – Entire Longitudinal Section Next slide Gold over + 600 m Vertical 22
Slide 23: Imperial Zone 2023 Drill Cross-Section
23 Reliance Gold Project Imperial Zone 2023 Drill Cross-Section @ 040o Imperial Area open at Depth and along strike
Slide 24: Entire Longitudinal Section
Reliance Gold Project – Entire Longitudinal Section Next slide Gold over + 600 m Vertical 24
Slide 25: Fosterville Analogy?
25 Reliance Gold Project Fosterville Analogy? South North 1000 m Whistler Reliance - same scale Fosterville gold mine was originally a low-grade heap leach open cut oxide operation with improving gold grades to depth (e.g. Swan zone – 2.34 moz @ 49.6 gpt Au) – resources currently defined to +1,300 m
Slide 26: Reliance & Olympic Options Soil & Biogeochemical Anomalies
Reliance & Olympic Options Soil & Biogeochemical Anomalies Enigma Olympic Imperial Eagle 1 km
Slide 27: Reliance Gold Project, BC Conclusions and The Future
27 Reliance Gold Project, BC Conclusions and The Future 1. An outstanding New Exploration Discovery in an historically productive multi-million ounce Orogenic Gold Camp. 2. Wide pervasive iron-carbonate sericite alteration, sulphidization, breccia, and antimony indicate an “Epizonal” Orogenic settin
Slide 28: Alaska Gold Projects
ENDURANCE GOLD ALASKA GOLD PROJECTS 28
Slide 29: Tintina Gold Province - Alaska & Yukon
29 Tintina Gold Province - Alaska & Yukon Alaska ranks in the Top 5 in Fraser Institute’s Investment Attractive Index Elephant Mountain Map source: USGS Fact Sheet 2007-3061
Slide 30: Alaska Properties – Road Accessible
30 Alaska Properties – Road Accessible Within the Yukon-Tanana Reduced Intrusive-Related Gold District
Slide 31: Elephant Mountain Gold Project
31 Elephant Mountain Gold Project Yukon River Rampart Elephant Property North, Pump, Central & South Targets Trout - Wolverine Property Hutlinana Hot Springs Eureka
Slide 32: Elephant Mountain Gold Project
32 Elephant Mountain Gold Project
Slide 33: Elephant Mountain Project, Alaska
33 ELEPHANT MOUNTAIN PROJECT, Alaska • Own 100% of Elephant Claims - Option to Earn 100% on Trout Claims • Road and State trail accessible in Central Alaska. – Permitted for Drilling • State Mining Claims • Target Similarity to Fort Knox, Golden Summit, Eagle Deposit (Yukon) • Six intrusive hosted g
Slide 34: Airborne Geophysics – 7200 Hz. Resistivity
34 Elephant Mountain Gold Project Airborne Geophysics – 7200 Hz. Resistivity Granodiorite Intrusive 1992 Placer Dome DDH -2 0.514 gpt Gold over 99.4 m Endurance DDH EL16-13 0.40 gpt Gold over 147.1 m Endurance DDH EL16-14 4.09 gpt Gold over 4.6 m incl. 20.4 gpt Gold over 0.67 m
Slide 35: Intrusive Hosted - Induced Polarization Anomalies
35 Elephant Mountain Gold Project, Alaska Intrusive Hosted - Induced Polarization Anomalies SW Looking West Northwest NE Diamond Drill Hole Modelled Chargeability (mV/V) 0.4 gpt Gold / 147 m Elephant Mtn. includes 0.63 gpt Gold / 48.2 m Fault Zone Deeper Oxidation? & Covered Area North Zone Pump Zon
Slide 36: Chargeability (50m dipole) – N2
36 Elephant Mountain Gold Project Chargeability (50m dipole) – N2 1992 Placer Dome DDH -2 0.514 gpt Gold over 99.4 m Endurance DDH EL16-13 0.40 gpt Gold over 147.1 m Elephant Mtn. Fault Zone Endurance DDH EL16-14 4.09 gpt Gold over 4.6 m incl. 20.4 gpt Gold over 0.67 m
Slide 37: Elephant Mountain Gold Project – Area Geology
37 Elephant Mountain Gold Project – Area Geology Option to 100% South Wolverine Fork Up to 11.65 gpt Gold Zone Up to 11.98 gpt Gold Trout Peak Zone Up to 23 gpt Gold North, Pump & Central Zone IP Chargeability High Anomalies South Zone Drilling: 4.1 gpt Gold over 4.6 m 100% Owned Gold-in-Soil Anomal
Slide 38: Eureka – Manley Hot Springs District, Alaska
38 Elephant Mountain Gold Project Eureka – Manley Hot Springs District, Alaska 1. Elephant Property – 100% owned 2. Trout - Wolverine Property – Option to own 100% Remaining obligation include US$100,000 cash by Dec 2024 Both Properties subject to 1% NSR after buyout
Slide 39: Bandito REE-Nb Project, Yukon
BANDITO REE-Nb PROJECT Yukon 100% Endurance Owned Rare Earth-Niobium-(Nickel-Copper) Target
Slide 40: Bandito Project Location Map
Bandito Project, Yukon Location Map Access through rolling to flat topography 63 km from all weather road 30 km from oil & gas tote road 90 kilometres to Beaver River gas wells Liard River Shale Gas Basin
Slide 41: Highlights REE & Niobium in Soil
Bandito Project, Yukon Highlights REE & Niobium in Soil Total Rare Earth Elements + Yttrium Niobium Niobium - Tantalum 2011 Soil Grid Statistical Correlation is 86.5% Total REE & Yttrium Niobium in Soil Tantalum in Soil TREE+Y (ppm) Percentile Large Rare Earth Nb (ppm) Percentile Ta (ppm) Percentile
Slide 42: Sodium and Potassium Metasomatism
Bandito Project, Yukon Sodium and Potassium Metasomatism Albite – potassium feldspar Fenite or fenitized intrusive dykes Multistage fluorite hematite monazite plagioclase Fenite Grabs up to 6.8% TREO
Slide 43: Project Highlights
Bandito Project, Yukon Project Highlights 1. Drill Ready REE target - 3.0 by 0.5 Km Rare Earth System in Fenite – 2.3% TREO+Y over 6 m with 10.8% Heavy Rare Earths in Fenite - plus consistently high niobium values in Fenite. 2. Drill Ready Nb-Ta targets - Over 30 chip & grab samples contain in exces
Slide 44: Next Steps
Bandito Project, Yukon Next Steps 1. LiDAR Completed in 2022 – assist with defining lithological contacts, intrusive contacts 2. Airborne + Ground Geophysics – To define system size with radiometrics. 3. Additional soil & rock sampling – To define limits of the large intrusive- hosted rare earth, ni
Slide 45: www.endurancegold.com
www.endurancegold.com Robert T. Boyd, P.Geo. is a qualified person as defined in National Instrument 43-101 and supervised the compilation of the information forming the basis for this summary. Any historic data summarized in this presentation should not be relied upon. Suite 1212 – 666 Burrrard Str
Endurance Gold — Investor Presentation (November 2023) on 6ix