Endurance Gold Corporation · TSXV:EDG

Endurance Gold — KEG Conference (April 2026)

28 slides from Endurance Gold's conference presentation, Apr 14, 2026

  1. Slide 1: Reliance Gold Project, Gold Bridge, BC

    Reliance Gold Project Gold Bridge, BC KEG Conference Darren O’Brien – VP Exploration April 14, 2026 EDG: TSX.V | ENGF: OTC Pink | Frankfurt: 3EG

  2. Slide 2: Corporate Disclosure

    2 Corporate Disclosure The company is an exploration stage mineral resource exploration company and none of its mineral projects have yet to be proven to be economic. The contents of this presentation is for information purposes only and does not constitute an offer to sell or a solicitation to purc

  3. Slide 3: Endurance Gold – Active Projects

    Endurance Gold – Active Projects

  4. Slide 4: Reliance Gold Project 100% Owned – 5,500 Hectares

    Reliance Gold Project 100% Owned – 5,500 Hectares 4 Bridge River Camp • 100 km West of Lillooet • +4 Moz Au production District Consolidation of Gold & Antimony Prospects Reliance Bralorne

  5. Slide 5: Bridge River Mining Camp = Orogenic Gold Camp

    Bridge River Mining Camp = Orogenic Gold Camp • Compressional and transpressional deformation zones • Coast Plutonic emplacement • Regional faults change from sinistral to Reliance 6 km dextral strike-slip movement (64 Ma) • Bralorne-Pioneer Mines • Mesozonal Orogenic vein deposits Bralorne • >4 Moz

  6. Slide 6: Project History / 2020 to 2025 Systematic Exploration

    Reliance Project History / 2020 to 2025 Systematic Exploration6 Historic antimony prospect with small scale mining going back to 1915 1985 to 2008 Early Gold Exploration • 1986 drill discovery of the Imperial Zone • Property never systematically explored • Claims lapsed in 2018 2020 to 2025 Enduranc

  7. Slide 7: Reliance Gold Project Highlights

    7 Reliance Gold Project Highlights Near-surface, high-grade gold discovery • 32 km of drilling with Excellent hit statistics (70% hit ratio) Inaugural Mineral Resource Estimate (January 2026) • Inferred 19.6 Mt at 2.3 gpt Au for 1.45 Moz Au • Discovery Cost of C$9 per ounce Inferred Exploration Upsi

  8. Slide 8: Reliance Gold Project Royal Shear

    Reliance Gold Project (Looking South) 8 Iron Carbonate Treasure Alteration Shear Eagle South Camp Creek Eagle Shear Vista Imperial Bona Diplomat Grey Rock Carpenter Lake Royal Shear

  9. Slide 9: Royal Shear Surface Geology

    Reliance Gold Project Royal Shear Surface Geology Imperial Zone Footwall Basalts Eagle Zone Hangingwall Argillites 9

  10. Slide 10: Eagle Vertical Section

    • RS Reverse Fault Eagle Vertical Section • 200 m wide Fe-Carb Alteration • Mineralized Bx along dilational and contact zones • Extensional Bx

  11. Slide 11: Eagle Vertical Section

    Eagle Vertical Section (Rhys 2024)

  12. Slide 12: DDH21-020 – 15.7 gpt Gold over 24.8 m

    12 Reliance Gold Project DDH21-020 – 15.7 gpt Gold over 24.8 m MINERALIZED BRECCIA TEXTURES Coxcomb / Cockade Quartz-Carb Breccia NQ Core

  13. Slide 13: Cataclastite Breccia Textures

    13 Reliance Gold Project Cataclastite Breccia Textures DDH22-027 @ 116.4 m Fine-grained crushed py, 4.16 gpt Au / 30.0 m aspy, stibnite with quartz breccia clasts & late ankerite overprint 5.63 gpt Au / 5.12% Sb / 3.3 m

  14. Slide 14: Mineralized Breccias: Consistent Mineralized Intervals

    Mineralized Breccias: Consistent Mineralized Intervals DDH22-027 From To Length Hole ID Sample ID Au g/t Ag ppm As ppm Sb ppm (m) (m) (m) DDH22-027 103.2 105.2 2 H610800 0.161 0.14 136 9.36 DDH22-027 105.2 107.2 2 H610801 0.329 0.1 359 29.5 DDH21-020 DDH22-027 DDH22-027 107.2 109.2 109.2 111.2 2 H61

  15. Slide 15: Visible Gold in Quartz Veins

    Reliance Gold Project Visible Gold in Quartz Veins 15 DDH24-093 – 147.5 gpt Au / 1.0 m DDH23-078 – 9.67 gpt Au / 1.2 m

  16. Slide 16: Best Diamond Drill Holes 2021 to 2025

    Reliance Gold Project Best Diamond Drill Holes 2021 to 2025

  17. Slide 17: Best Diamond Drill Holes 2021 to 2025

    Reliance Gold Project Best Diamond Drill Holes 2021 to 2025 86 of 127 DDH holes returned > 10 gram*m • 134 Assay Composites • Multiple Composites per Hole • Average Comp. Drill Length = 9.8 m • Wt. Ave Grade = 4.74 gpt Au 23 of 127 DDH holes returned > 70 gram*m

  18. Slide 18: Mineral Resource Estimate

    18 Reliance Gold Project Mineral Resource Estimate The Mineral Resource Estimate (“MRE”) was prepared for Endurance Gold Corp. by Ginto Consulting Ltd. in accordance with NI 43-101 – Standards of Disclosure for Mineral Projects. Please see the news release dated January 19, 2026 for additional discl

  19. Slide 19: Mineral Resource Estimate & Pit Shell - 3D View

    19 Reliance Gold Project Mineral Resource Estimate & Pit Shell - 3D View Gold (gpt) 10.92 6.30 4.13 xxxx 2.74 1.61 0.77 500 metres Plunge +90 Azimuth 000

  20. Slide 20: Mineral Resource Estimate & Pit Shell - Plan View

    20 Reliance Gold Project Mineral Resource Estimate & Pit Shell - Plan View Gold (gpt) 10.92 6.30 4.13 xxxx 2.74 1.61 0.77 Plunge +90 500 metres Azimuth 000

  21. Slide 21: 2026 Mineral Resource Estimate Plan View

    Reliance Gold Project 2026 Mineral Resource Estimate Plan View Imperial Zone Crown Zone Eagle Zone 21

  22. Slide 22: Eagle Zone Cross Section with Pit Shell

    Reliance Gold Project Eagle Zone Cross Section with Pit Shell 22 22

  23. Slide 23: Imperial Zone Cross Section with Pit Shell

    Reliance Gold Project Imperial Zone Cross Section with Pit Shell 23 Depth Potential: 6.74 gpt Au over 21.8 m 4.85 gpt Au over 15.3 m 23

  24. Slide 24: Exploration Upside: Royal Shear & Olympic Geochemical Anomalies

    Reliance Gold Project – Exploration Upside Royal Shear & Olympic Geochemical Anomalies Olympic Anomalies 2,049 Soil Samples 138 Rock Grabs / Channels: • 25 Rocks (1.0 to 25.1 gpt Au; Ave 7.6 gpt Au) 24

  25. Slide 25: Eagle Offset Geochemical Target

    Reliance Gold Project Eagle Offset Geochemical Target 1.45 Moz Au MRE 8.16 Eagle Offset Anomaly: • 500 m south of Eagle Zone • 1,300 m x 500 m anomaly • Coincidental Magnetic-Low, Gold-in-Bedrock, & Au-As-Sb Soil Geochem • Offset of Royal Shear structure, or new, untested parallel structure? 25

  26. Slide 26: 2026 Program

    Reliance Gold Project 2026 Program 26 • 8,000 m diamond drilling • Expand and Upgrade the near-surface Inferred MRE. • Drilling targeting high-grade below pit shell Hole ID Drill Length Composite Target Zone DDH25-109 6.74 gpt Au over 21.8 m Imperial Zone DDH24-106 4.85 gpt Au over 15.3 m Imperial Z

  27. Slide 27: Corporate Snapshot / Key People

    27 Corporate Snapshot Shares Outstanding (April 8, 2026) 198.8m Market Capitalization (C$0.49 – April 8, 2026) C$97.4 m Options (C$0.20 – C$0.34) 8.5 m Insiders Warrants (C$0.17 – C$0.90) 6.8 m own over 60% Fully Diluted (April 8, 2026) 214.1 m Working Capital (Sept 30, 2025) C$1.67 m* * Excludes $8

  28. Slide 28: www.endurancegold.com

    www.endurancegold.com Suite 1212 – 666 Burrard Street Vancouver, BC V6C 2X8 Canada Toll Free Phone: 877-624-2237 EDG: TSX.V | ENGF: OTC Pink | Frankfurt: 3EG

Endurance Gold — KEG Conference (April 2026) on 6ix