Orsted · OMXCOP:ORSTED

Orsted — DONG Energy — FY2012 Earnings Presentation

49 slides from Orsted's earnings presentation, Feb 27, 2013

  1. Slide 1: 2012 results and 2020 strategy

    2012 results and 2020 strategy 27 February, 2013

  2. Slide 2: Disclaimer

    Disclaimer Certain statements in this presentation are based on the beliefs of our We urge you to read our annual report available on our website at management as well as assumptions made by and information currently www.dongenergy.com for a discussion of some of the factors that could available to

  3. Slide 3: 2012 Annual Results, Financial Action Plan, 2020 Strategy, Targets

    2012 Annual Results 2013-14 Financial Action Plan 2020 Strategy Targets and Guidance 2012 RESULTS AND 2020 STRATEGY 3

  4. Slide 4: Unsatisfactory 2012 results

    Unsatisfactory 2012 results EBITDA  Challenging situation in Energy Markets Group EBITDA  Low thermal production and spreads DKKbn -37%  Siri repair 14.1 13.8 13.4  Higher oil & gas prices and higher production  Gain from construction agreements in Wind Power 9.3 8.6  Increased production from

  5. Slide 5: Four of five BUs on track

    Four of five BUs on track EBITDA 2011 DKKbn 2012 5.7  Higher production and higher oil & gas prices E&P 6.6  Higher Siri repair costs 1.8  Earnings from construction for co-investors WP 2.5  Higher production from new wind farms 2.3  Lower production and spreads due to higher hydro levels TP 2.

  6. Slide 6: Challenges in Energy Markets

    Challenges in Energy Markets Energy Markets from 2011 to 2012 EBITDA  Negative impact from oil/gas spread on long term DKKbn 2011 2.0 gas sourcing contracts  Negative impact from reduced volumes from legacy One-off gas purchase contracts renegotiation gain in 2011 1.0  One-off gain in 2011 from r

  7. Slide 7: Declining returns

    Declining returns Group ROCE ROCE % % 11.6 9.6 5.5 5.7 -7.4 2008 2009 2010 2011 2012 2012 RESULTS AND 2020 STRATEGY 7

  8. Slide 8: Capital structure under pressure

    Capital structure under pressure Adjusted net debt/EBITDA Adjusted net debt 36 x 4.1 DKKbn 31 26 26 Non-cash 19 1.0 3.3 provisions Target <2.5x 2008 2009 2010 2011 2012 1.9 1.9 EBITDA ÷ 1.4 3.1 DKKbn 13 14 14 9 9 2008 2009 2010 2011 2012 2008 2009 2010 2011 2012 2012 RESULTS AND 2020 STRATEGY 8

  9. Slide 9: Deterioration in credit metrics

    Deterioration in credit metrics  Credit metrics below rating requirements in 2012 Credit metrics FFO/Net debt and RCF/Net debt  S&P downgrade to BBB+ in October 2012  Current rating on negative outlook from S&P and Fitch Significant decline  Rating pressure expected to continue in the Utilities

  10. Slide 10: 2013-14 Financial Action Plan

    2013-14 Financial Action Plan 2012 RESULTS AND 2020 STRATEGY 10

  11. Slide 11: 2013-14 Financial Action Plan

    2013-14 Financial Action Plan 1 Divest DKK 10bn of non-core assets 2 Selective farm-down of core assets 3 Reduce costs by DKK 1.2bn, full effect in 2013 4 Restructure Energy Markets 5 Inject equity of at least DKK 6-8bn 2012 RESULTS AND 2020 STRATEGY 11

  12. Slide 12: Restructure Energy Markets

    Restructure Energy Markets Profitability restored from 2014  Focus on optimising gas and power flows and managing group exposure  Renegotiate long term gas contracts with significant positive impact in the coming years  Optimise value of CCGT, LNG and storage assets  Flat and simplified organisa

  13. Slide 13: Injecting equity

    Injecting equity  DONG Energy will seek to raise at least DKK 6-8bn of additional equity  Process is supported by the majority shareholder, the Danish State  DONG Energy will seek to raise the equity from new and/or existing shareholders [PICTURE]  The Danish State will remain majority sharehold

  14. Slide 14: Key assets on stream towards 2016

    Key assets on stream towards 2016 London Array (630 MW1,2) West of Duddon Sands Borkum Riffg. 1 (277 MW1) Anholt (400 MW1) (389 MW1) Westermost R. (210 MW1) Lincs (270 MW1,2) 2013 2014 2015 South Arne phase 3 Laggan-Tormore Hejre (DK oil field – 16MMboe3) (UK gas field – 44MMboe3) (DK oil field – 10

  15. Slide 15: Restoring financial robustness

    Restoring financial robustness Rating metrics FFO/Net debt and RCF/Net debt DONG Energy to maintain minimum rating target of BBB+/Baa1 2012 Divestment of Core asset Cost reductions Restructure Inject equity Underlying Target performance non-core assets farm-downs Energy Markets business 2014 incl. n

  16. Slide 16: 2020 Strategy

    2020 Strategy 2012 RESULTS AND 2020 STRATEGY 16

  17. Slide 17: What strategy must deliver

    What strategy must deliver TRANSFORM BUSINESS TRANSFORM ENERGY SYSTEM CREATE FINANCIAL VALUE Share of Group EBITDA CO2 intensity ROCE Growth gCO2/kWh Legacy 2006 2020 2009 2020 2012 2020 2012 RESULTS AND 2020 STRATEGY 17

  18. Slide 18: Future investment focus

    Future investment focus INVESTMENT IN NEW ASSETS INVESTMENT IN EXISTING ASSETS NO FURTHER COMMITMENT  Offshore Wind  Danish Power Plants  LNG  Oil & Gas  Distribution Grid  Gas Storage  Onshore Wind  Hydro  Gas Fired Power Plants  Waste Fired Power Plants  Electric Vehicles 2012 RESULTS A

  19. Slide 19: 2020 strategy

    2020 strategy Sustain market leadership; 1 quadruple capacity Reinforce regional position; 2 double production Convert to biomass; 3 provide flexibility Develop energy solutions and 4 intelligent grid 5 Simplify operating model 2012 RESULTS AND 2020 STRATEGY 19

  20. Slide 20: Strategic focus

    Strategic focus Projected share of investments 2013-2020 OFFSHORE WIND OIL AND GAS POWER PLANTS SALES & DISTRIBUTION DONG Energy capacity1 DONG Energy production DONG Energy biomass share2 Energy solutions3 GW '000 BOE/day % TWh Flexibility solutions 4x 2x 2x Energy savings 6.5 130 150 50 4x 40 3.5

  21. Slide 21: Offshore Wind

    Offshore Wind Market leadership; growth and value creation Priorities  Mature and construct project pipeline  Reduce cost of energy  Further develop industrial and financial partnerships  Standardise and increase operational efficiency Targets  Installed gross capacity of 6.5GW in 2020  Offsho

  22. Slide 22: Developing the offshore wind portfolio

    Developing the offshore wind portfolio FOOTPRINT COST OF ENERGY Wind farms in operation To be commissioned 2013 Levelised cost of energy Projects committed EUR/MWh 1601 <1002 Walney Barrow Westernmost WoDS Rough Anholt 2012 2020 Horns Rev Middelgrunden Lincs Key focus areas Nysted  Turbine Borkum 

  23. Slide 23: Oil and Gas

    Oil and Gas Strong regional position; growth and value creation Priorities  Optimise production on existing fields including satellite extensions  Complete Siri repair  Develop Hejre and West of Shetlands  Secure long term reserves replacement Targets  150 kboe/day by 2020  Reserves-to-product

  24. Slide 24: Developing the oil and gas portfolio

    Developing the oil and gas portfolio FOOTPRINT SIRI VALUE CREATION CASE NPV4 Existing1 FID2 non-FID3 Siri, main Area New wells Total Platform Total development build-out Siri area repair 1. Siri area, Syd Arne, Lulita (DK); Ormen Lange, Marulk, Alve, Oselvar, Trym, Ula, Gyda, Tambar (NO) 2. Hejre (D

  25. Slide 25: Power Plants

    Power Plants Leader in biomass-to-energy; solid positive cash flow Priorities  Sustain long-term viability of CHPs  Convert Danish power plants to biomass  Ensure flexible and efficient heat and power production  Commercialise new innovative biotechnologies (Inbicon, REnescience and Pyroneer) Ta

  26. Slide 26: Sales & Distribution

    Sales & Distribution Efficient energy solutions; stable returns Priorities  Develop value adding energy solutions  Invest in intelligent distribution  Reinforce operational excellence  Deliver high customer satisfaction Targets  Stable ROCE of 7-9%  Top quartile customer satisfaction  Climate

  27. Slide 27: Group

    Group Value adding stewardship and support DEVELOP FOUNDATION SIMPLIFY OPERATING MODEL People Brand Group wide project initiated  Clarify role split between corporate centre and BUs  Reduce process and interface complexity  Simplify Group-wide staff set-up  Empower front line to drive the busine

  28. Slide 28: Inherent uncertainties

    Inherent uncertainties  Commodity prices  Relative cost competitiveness of offshore wind  Large-scale offshore construction projects  New offshore wind technology  Large E&P projects (Hejre and Laggan-Tormore)  Siri repair solution  Regulatory framework and political ambition for de-carbonisa

  29. Slide 29: Focus and discipline

    Focus and discipline  Focus investments in businesses with competitive advantages  Reduce net investment intensity compared to original ambition  Restore financial capacity to match investment ambition  Simplify operating model and reduce operating costs  Reinforced cash discipline and ROCE foc

  30. Slide 30: Targets and Guidance

    Targets and Guidance 2012 RESULTS AND 2020 STRATEGY 30

  31. Slide 31: Clear financial targets

    Clear financial targets ROCE >10 % -7.4 2012 2016 EBITDA ~20 DKKbn 8.6 2012 2016 Adj. NIBD/EBITDA x 4.1 1.0 ~2.5 3.1 2012 2014 2012 RESULTS AND 2020 STRATEGY 31

  32. Slide 32: Further reducing CO2 emissions

    Further reducing CO2 emissions Reinforcing the CO2 reduction target for DONG Energy gCO2/kWh Previous target Achieved Target 650 600 550 500 450 443 400 350 320 300 260 250 2006 2008 2010 2012 2014 2016 2018 2020 2012 RESULTS AND 2020 STRATEGY 32

  33. Slide 33: Ten targets defining our ambition and direction

    Ten targets defining our ambition and direction 1 ROCE >10% by 2016 and >12% by 2020 2 Adjusted Net Debt/EBITDA < 2.5x 3 CO2 emission reduction to 260g CO2/kWh by 2020 4 From 1.7GW to 6.5GW installed gross offshore wind capacity by 2020 5 Offshore wind cost-of-energy below €100/MWh1 by 2020 6

  34. Slide 34: Outlook

    Outlook EBITDA DKK 11.5-12.5bn in 2013 Net investments DKK 25-30bn in 2013-2014 Adjusted net debt/EBITDA Around 2.5x in 2014 2012 RESULTS AND 2020 STRATEGY 34

  35. Slide 35: Q&A

    Q&A 2012 RESULTS AND 2020 STRATEGY 35

  36. Slide 36: Direction towards 2020

    Direction towards 2020 2013-14 Financial Action Plan 2020 Strategy Sustain market leadership; 1 Divest DKK 10bn of non-core assets 1 quadruple capacity Reinforce regional position; 2 Selective farm-down of core assets 2 double production Convert to biomass; 3 Reduce costs by DKK 1.2bn, full effect i

  37. Slide 37: Appendix

    APPENDIX 2012 RESULTS AND 2020 STRATEGY 37

  38. Slide 38: Outlook Market Prices

    Outlook Market Prices Estimate Actual 2013 2012 (average) Oil, Brent USD/bbl 107 112 Gas, TTF EUR/MWh 26 25 Gas, NBP EUR/MWh 27 25 Electricity, Nord Pool system EUR/MWh 38 31 Electricity, Nord Pool, DK1 EUR/MWh 43 37 Electricity, EEX EUR/MWh 44 43 Electricity, UK EUR/MWh 61 55 Coal, API 2 USD/tonne

  39. Slide 39: Exploration & Production

    Exploration & Production Higher prices and production Operational figures Operational highlights mboe  Steady rise in production – increase in 2012 primarily coming 30 from the new fields Marulk and Oselvar as well as full ownership 25 of Siri 20 65% 65% 63% 65%  However, production problems at so

  40. Slide 40: Wind Power

    Wind Power Contribution from new assets Operational figures Operational highlights TWh  Around 30% of power production from renewables 5 40% 4 32%  First power in H2 12 obtained from: 3 24% - Lincs (full commercial operation expected H1 13) 2 16% - Anholt (full commercial operation expected H1 13)

  41. Slide 41: Thermal Power

    Thermal Power Lower production and lower GDS Operational figures Operational highlights TWh TJ  Lower thermal production due to low Green Dark Spread caused 20 60 by high hydro levels and mild weather 15 45  Efficiency improvements and capacity adjustments progressing 10 30 on plan 5 15  Negative

  42. Slide 42: Energy Markets

    Energy Markets Challenging gas business Operational figures Status on gas business TWh TWh  Renegotiations ongoing with gas suppliers – DONG Energy 160 16 expects to obtain similar terms as other large gas purchasers. 120 12 In some cases arbitration has been initiated 80 8  As expected, negative

  43. Slide 43: Sales & Distribution

    Sales & Distribution Stable earnings Operational figures Operational highlights 2012 2011  Increasing gas sales (up 81% y/y) primarily due to the Gas sales TWh 36.8 20.3 acquisition of Shell Gas Direct in the UK, recognised from May 2012 Distribution of gas TWh 9.1 9.9 Power sales TWh 7.5 7.6  Neg

  44. Slide 44: Debt overview

    Debt overview Gross interest-bearing debt and hybrid capital Key ratios loan portfolio (excl. hybrid capital) DKKbn 2012 2011 70 Duration (years) 6.8 6.0 60 9.5 Average time to maturity (years) 10.5 9.4 2.8 50 0.3 Hybrid Average interest rate 3.9% 4.1% 9.5 Net interest cost risk (DKKm)1 46 32 18.4 1

  45. Slide 45: Business Performance – 2012

    Business Performance – 2012  In 2012, the difference between Business Performance and IFRS amounted to DKK -1.5bn Business Performance EBITDA DKK 8.6bn Adjustments DKK -1.5bn MtM of financial and physical hedging contracts relating to other periods DKK -0.5bn Deferred losses/gains relating to finan

  46. Slide 46: Dividend, Funding and Rating

    Dividend, Funding and Rating Long term capital structure target Funding strategy and Debt Programmes  Maintain a minimum rating of BBB+ / Baa1  External funding primarily to be carried out through  Adjusted net interest-bearing debt (1) up to 2.5 times parent company – to avoid structural subordi

  47. Slide 47: Net debt calculation 2012

    Net debt calculation 2012 54.5 2.8 12.2 2.2 35.7 3.6 33.5 0.3 2.1 0.2 Gross debt Repo’ed mark. Marketable Cash & cash Receivables Receivables Other Net debt 50% Adjusted incl. REPO’ed securities Securities equivalents from associates from minority outstanding net debt mark. shareholders hybrid due 3

  48. Slide 48: Investments

    Investments Investments in 2012 Main gross investments in 2012 Cash flow from investing activities -20.0bn Wind activities: DKK 12.7bn Purchase of securities (add back) 5.0bn  London Array DKK 5.0bn Transactions with non-controlling interests 0.2bn  Walney DKK 1.8bn Loans to jointly controlled ent

  49. Slide 49: Larger decided construction projects

    Larger decided construction projects Larger projects with production start in 2013-2015 Country MW (1) Commercial Own share of Announced Project Type of project operation date(2) project capex (3) London Array(4) Offshore wind farm UK 315MW 2013 50% DKK 8.2bn Anholt Offshore wind farm DK 200MW 2013