  1. Slide 1: Market Update – APAC Mining Progress Update

    Market Update – APAC Mining Progress Update 25 Jan 2018

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this document (this “Presentation”) or any revision thereof, or of any other written or oral information made or to be made available to any Recipient or their advisers (all such information being referred to as "Information") has been prepared by Fatfish Inte

  3. Slide 3: What is Crypto Mining

    WHAT WHATISISCRYPTO CRYPTOMINING MINING Bitcoin, ethereum and all other blockchain technology based cryptocurrencies rely on intensive computing power to solve complex mathematical problems that authenticate and confirm transaction on the blockchain network. Rewards in the form of transaction fees a

  4. Slide 4: APAC Mining Overview

    APAC MINING OVERVIEW • Fatfish Internet Group Ltd (ASX:FFG) is investing US$1m for 51% of APAC Mining Corp (APAC Mining), a crypto mining startup. • APAC Mining to launch in Malaysia with 4,500 trillion hashes per second (TH/s) • 2 sites in Malaysia, with electricity capacity and tariff Work closely

  5. Slide 5: APAC Mining's Business Model

    APAC MINING’S BUSINESS MODEL APAC Mining is to operate three business lines: 1. Self- Mining Investing in mining servers and operate mining farm 2. Managed Hosted Service provision of managed and hosting services of mining servers to miners/investors in exchange for fee or revenue share 3. Leasing o

  6. Slide 6: Site 1 – Lease Secured and Being Prepared

    SITE 1 – LEASE SECURED AND BEING PREPARED Long term lease for the first crypto-mining facility has been secured (“Site 1”). It is located in a new industrial park of the Klang area, 30km away of Kuala Lumpur, Malaysia Site 1 is a 20,000 sqft triple volume industrial facility within a newly developed

  7. Slide 7: Site 1 – Energy Matrix

    SITE 1 – ENERGY MATRIX Site 1 Energy Capacity Matrix 3-Phase Electricity Output Max Capacity: 1200 KW/h* Blended average electricity rate at Site 1: US$ 0.08 / KWh * Upgradeable per demand Mining Server Energy Consumption Matrix Per Unit of Antminer S9 ASIC Miner: 1000 W / hour Per Unit of Ethereum

  8. Slide 8: Preparation of Equipment

    PREPARATION OF EQUIPMENT • Advance batch of equipment ordered has arrived on site and APAC Mining’s engineers are configuring and preparing them for operation • Initial batch of mining servers include: First batch of Ethereum Mining Rig is being configured, Ø 300 units Antminer S9 ASIC tuned and opt

  9. Slide 9: APAC Mining - Mining Matrix

    APAC MINING - MINING MATRIX • APAC Mining’s focus is to mine Bitcoin Cash • Initial Output Potential: (BCH) and Ethereum (ETH) • 150 BCH (market @ US$2400 per BCH • It will have ability to mine other • 30 ETH (market @ US$1200 per cryptocurrencies and will take a optimised ETH) switching approach •

  10. Slide 10: Mining – The Building Blocks of Blockchain

    MINING – THE BUILDING BLOCKS OF BLOCKCHAIN Mining is an essential to the operation of the distributed ledger model of blockchain network. Distributed Nodes Algorithm ic Functional Econom ics Make up the computing Performing hashing For providing the notes of distributed algorithm to confirm computin

  11. Slide 11: FFG's 12-Month Mission: Building a Strategic Ecosystem Play

    FFG’S 12-MONTH MISSION: BUILDING A STRATEGIC ECOSYSTEM PLAY FOR THE CRYPTOCURRENCY EVOLUTION Kuala Lumpur Venture Hub, Fatfish

  12. Slide 12: Thank You

    C R E AT I N G V E N T U R E VA L U E A N D C H A M P I O N I N G I N N O VAT I O N THANK YOU w w w. f a t f i s h . c o

Fatfish Group — Corporate Update (January 2018) on 6ix