Alma Metals Limited · ASX:ALM
Alma Metals — Investor Presentation (September 2024)
16 slides from Alma Metals's investor presentation, Sep 11, 2024
Slide 1: An Australian Copper Company
AN AUSTRALIAN COPPER COMPANY For personal use only COMPANY PRESENTATION SEPTEMBER 2024
Slide 2: Cautionary Statements
CAUTIONARY STATEMENTS Competent Persons Statements This presentation includes certain “Forward- Looking Statements”. Dr Tabeart consents to the inclusion of the data in the form and context The words “forecast”, “estimate”, “like”, “anticipate”, “project”, in which it appears. This presentation has
Slide 3: Alma Metals Overview
Alma Metals Overview Alma Metals Ltd is primarily focused on the development of its Briggs Copper Project in Queensland, Australia: For personal use only Briggs Copper JV: ALM earning up to 70% interest in a large porphyry copper-molybdenum project containing an inferred resource of 415Mt @ 0.25%
Slide 4: ALM: Corporate Snapshot
ALM: Corporate Snapshot Alasdair Cooke Executive Chairman SHARES ON ISSUE: 1,450M Geologist and founding director, 35 years in mining For personal use only Current Director Caravel Minerals, African Energy Ltd., formerly BHP Minerals, Exco Resources. OPTIONS 25M Frazer Tabeart Managing Director MARK
Slide 5: Briggs Copper Deposit
Briggs Copper Deposit Briggs JV Copper Project Calliope Gladstone Large-scale, outcropping deposit: For personal use only >1 million tonnes copper with huge upside for tonnage and grade Potential open pit with very low strip ratio Excellent preliminary metallurgy, 92-95% Cu recovery Excell
Slide 6: Scale + Growth
Scale + Growth >1 MILLION TONNES COPPER METAL For personal use only Over 1 million tonnes copper and >28Mlb molybdenum in mineral resource estimate. TONNAGE UPSIDE: Additional Exploration Target comprising 480Mt to 880Mt @ 0.20% to 0.30% Cu and 20ppm to 40ppm Mo1 Inferred Mineral Resource Estima
Slide 7: Higher Grades Mapped by Soil Geochemistry at Briggs
Higher Grades Mapped by Soil Geochemistry at Briggs Drilling has strongly validated gridded soil sampling data as a useful guide to sub-surface grades >0.3% For personal use only Cu, particularly the top 200m. Significant upside is highlighted on the SW flank of the Briggs Central deposit, which
Slide 8: Higher-Grade Target Around Intrusive Contact = Potential Starter Pit
Higher-Grade Target Around Intrusive Contact = Potential Starter Pit Northern Porphyry 3D model of Cu distribution (>0.20% Cu) For personal use only derived from all drilling and soil sampling 50Mt @ 0.24% Cu + 32ppm Mo Exploration Target Outline Briggs Porphyritic Granodiorite (interpreted 3D geome
Slide 9: Assay results
Assay results OUTSTANDING RESULTS IN FIRST HOLE IN RECENT DRILLING PROGRAM Assays from hole 24BRD0026 best-to-date at For personal use only Briggs with: 276m @ 0.45% Cu and 24ppm Mo from surface Including 49m @ 1.01% Cu, 17ppm Mo from 3m Initial drilling success give confidence in our strate
Slide 10: Oxide Zones Warrant Further Review
Oxide Zones Warrant Further Review Oxide/supergene zones caused by weathering seen in For personal use only holes 24BRD0026, 23BRD0021 confirm the local presence 0.8% Cu of up to 30m vertical thickness of secondary copper mineralisation from surface. All holes drilled to date show evidence of th
Slide 11: 2024 Programs Leading to a Scoping Study at Briggs
2024 Programs Leading to a Scoping Study at Briggs Infill Drilling (underway) For personal use only Detailed (80m-spacing) drilling to evaluate SW margin of Briggs Central. Conversion of a significant portion of resource to Indicated category. Provision of material for metallurgical test-wor
Slide 12: Excellent Infrastructure in Low-Risk Jurisdiction
Excellent Infrastructure in Low-Risk Jurisdiction GOOD INFRASTRUCTURE REDUCES CAPITAL COSTS For personal use only 60km from deep-water port (Gladstone). Multiple high-voltage power lines within 10-15km. Heavy haulage railway currently used for coal exports. Multiple gas pipelines. Major
Slide 13: Opportune Time: Strong Copper Fundamentals Over the Next Years
Opportune Time: Strong Copper Fundamentals Over the Next 20 Years INCREASING DEMAND SUPPLY-SIDE CONSTRAINTS For personal use only Copper required for all EV’s and renewable energy Average mining grades are dropping each year Critical mineral for global decarbonisation Deposit discovery rates
Slide 14: East Kimberley Copper Project
East Kimberley Copper Project FIRST MOVER OPPORTUNITY FOR HIGH-GRADE COPPER Seven exploration licences (100% ALM) in the East Kimberley District of WA. For personal use only Highly prospective for sediment-hosted, stratiform copper mineralisation like the world class central African Copper Belt
Slide 15: Developing a large-scale copper project at an opportune time
Alma: Developing a large-scale copper project at an opportune time, in a low-risk jurisdiction, close to excellent infrastructure, and with enormous leverage potential For personal use only Large resource at Briggs with >1M tonnes Cu metal Resource upside and potential to increase grade Zones
Slide 16: Alma Metals
ALMASMETALS ASX:ALM almametals.com.au X fH @