  1. Slide 1: Briggs: 2Mt Copper in Central Queensland

    BRIGGS: 2Mt COPPER IN For personal use only CENTRAL QUEENSLAND COMPANY PRESENTATION FEBRUARY 2026

  2. Slide 2: Cautionary Statements

    CAUTIONARY STATEMENTS This presentation has been prepared by Alma Metals Limited Forward Looking Statements consideration and to the activity which he is undertaking to qualify as a (“Alma Metals”) to assist in informing interested parties about Competent Person under the 2012 Edition of the Austral

  3. Slide 3: Alma Metals Overview

    Alma Metals Overview Alma is primarily focused on the development of its Briggs Copper Project in Queensland, Australia: For personal use only  Briggs Copper JV (Alma 51%) : earning to 70% interest in a porphyry Cu-Mo project containing >2Mt Cu metal.  Queensland’s largest undeveloped copper proje

  4. Slide 4: ALM: Corporate Snapshot

    ALM: Corporate Snapshot Alasdair Cooke Executive Chairman SHARES ON ISSUE: 2.23B Geologist and founding director, 35 years in mining For personal use only Current Director Caravel Minerals, African Energy, formerly BHP Minerals, Exco OPTIONS 40M Resources. MARKET CAPITALISATION (1.5c): A$33M Frazer

  5. Slide 5: Good Time to Invest in Copper Developers

    Good Time to Invest in Copper Developers  Copper demand is growing steadily to support EV’s, renewable energy generation, For personal use only data centres and it underpins global decarbonisation.  Global copper supply must grow substantially and rapidly if the world is to come close to its net-z

  6. Slide 6: Briggs Has Scale: 2Mt Copper Metal in 2025 Mineral Resource Estimate

    Briggs Has Scale: 2Mt Copper Metal in 2025 Mineral Resource Estimate  ROBUST MINERAL RESOURCE ESTIMATE (MRE): For personal use only  Very large MRE hosting 2Mt copper metal in inferred and RPEEE Northern Porphyry Pit Shell indicated resources at 0.15% Cu cut-off grade (see table below).  Deposit

  7. Slide 7: Deposit Geometry and Outcropping Nature Supports Economy of Scale

    Deposit Geometry and Outcropping Nature Supports Economy of Scale  Continuous outcrop along entire 2.2km strike length of the deposit, coupled with simple geometry allows for efficient large-scale mining For personal use only  Coupled with highly efficient mineral processing this may provide the o

  8. Slide 8: Simple Processing Flowsheet to Unlock Value at Briggs

    Simple Processing Flowsheet to Unlock Value at Briggs  Locked-Cycle Flotation tests (April 2025) at For personal use only coarse grind sizes delivered excellent results:  94-95% copper recovery  Concentrate grades 23-29% Cu  No penalty elements of concern.  Coarse primary grind size 150µm to 21

  9. Slide 9: Location, Location, Location Briggs Cu-Mo Deposit

    Location, Location, Location Briggs Cu-Mo Deposit  GOOD INFRASTRUCTURE REDUCES CAPITAL COSTS For personal use only  60km from deep-water port (Gladstone).  Multiple high-voltage power lines within 10-15km.  Heavy haulage railway currently used for coal exports. Calliope  Multiple gas pipelines.

  10. Slide 10: Upside at Briggs; MRE Expansion and Process Flowsheet Optimisation

    Upside at Briggs; MRE Expansion and Process Flowsheet Optimisation  RESOURCE UPSIDE: For personal use only  Excellent correlation of surface geochemistry and copper grade in top 200m.  Current drilling validates MRE block model to 500m depth and lends support to planned drill programs.  Signific

  11. Slide 11: Recent Drilling Results Support Geological Model and Extend Depth

    Recent Drilling Results Support Geological Model and Extend Depth  Deepest drilling to date was completed in late 2025 For personal use only  Geology exactly as predicted by MRE/geological block model  Assays highlight good grades continue over 500m below surface Hole ID Depth From Depth To Inter

  12. Slide 12: News Flow: Immediate Progression into Pre-Feasibility Study

    News Flow: Immediate Progression into Pre-Feasibility Study  Alma has committed to a PFS which will include the following programs: For personal use only  Major drilling program (ultimately >25,000m over ~18 months) to enhance and expand the MRE, supporting detailed mine planning and scheduling at

  13. Slide 13: Investment Highlights

    Investment Highlights  Global supply-demand fundamentals support a high copper price for the foreseeable future. For personal use only  ALM is one of the best leveraged pure copper plays on the ASX backed by a large-scale and potentially long-life asset in a stable, mining friendly Tier 1 jurisdic

  14. Slide 14: For personal use only

    For personal use only High-grade copper mineralisation in the form of chalcopyrite in magmatic quartz vein. Hole 24BRD0024 at 169.0m down-hole depth from a sample which assayed 0.7% Cu and 418 ppm Mo over a 2.0 m interval. Core diameter 61.1mm.