Acdc Metals Ltd · ASX:ADC

Acdc Metals — RIU Fremantle 2025

22 slides from Acdc Metals's conference presentation, Feb 17, 2025

  1. Slide 1: Exploring & Developing Critical Mineral Projects

    For personal use only ASX: ADC Exploring & Developing Critical mineral projects RIU Fremantle | February 2025

  2. Slide 2: Important Information and Disclaimer

    Important Information and Disclaimer Disclaimer: The material in this presentation has been prepared by ACDC Metals Ltd (“Company”). This presentation may not be reproduced, redistributed or passed on, directly or indirectly, to any other person, or published, in whole or in part, for any purpose wi

  3. Slide 3: ACDC Corporate Strategy

    For personal use only ACDC Corporate Strategy Building a mine-to-market critical metals company with heavy mineral sand (HMS) assets and proprietary rare earth element (REE) processing technology. Secure supply of critical metals is essential for the energy transition. Through an innovative business

  4. Slide 4: ACDC Metals: Rapid progress on flagship Goschen Central project

    ACDC Metals Rapid progress on flagship Goschen Central project ✓ Large resource defined; remains open, over 600Mt, strong Monazite and Zircon assemblage. For personal use only ✓ Metallurgical Testwork program complete at Mineral Technologies. ✓ Heavy mineral samples for offtake and strategic discuss

  5. Slide 5: ACDC Metals Strategy: Mine to Magnet

    ACDC Metals Strategy: Mine to Magnet Phase 1 Heavy Mineral For personal use only Concentrate (HMC) Heavy Mineral Sand & Rare Earth Element Projects To Rare Earth Mineral Existing Concentrate (REMC) Markets Rare Earth Mining, Beneficiation Processing Mixed Rare to Concentrate Plant Earth Oxide (MREO)

  6. Slide 6: Corporate Structure

    Corporate Structure ACDC Share Register Capital Structure Vendors For personal use only Shares on issue 72,305,130 22% Share price (12 Feb 2025) $0.053 Management & Directors Market Capitalisation $3.8 M Medallion Resources 8% (TSXV:MDL) Cash (Q4 CY2024) $2.68 M 7% Consolidated & 63% Institutional D

  7. Slide 7: Experienced Board & Management Team

    For personal use only Experienced Board & Management Team Tom Davidson Andrew Shearer Mark Saxon Chief Executive Officer Non-Executive Director and Chair Executive Director Engineer & Development Geologist & Corporate Geologist & Corporate Ivan Fairhall Richard Boyce Kent Balas Andrew Draffin Non-Ex

  8. Slide 8: Goschen Central - an advancing Project

    Goschen Central - an advancing Project Last 12 months For personal use only ✓ 1.6 Tonne Metallurgical testwork program complete. ✓ Marketing study completed. ✓ Extension drilling and further mineralogy. ✓ JORC Resource upgraded. ✓ Scoping Study nearing completion. ✓ Retention licence application in

  9. Slide 9: Goschen Central Project – Mineral Resource 2024 Update

    Goschen Central Project – Mineral Resource 2024 Update • Significant increase in grade, heavy mineral tonnes and geological confidence of the Goschen Central resource. For personal use only • Indicated resource classification has increased significantly: • Tonnes have increased by over 60% from 130M

  10. Slide 10: Goschen Central Project – Scoping Study

    Goschen Central Project – Scoping Study Contributing consultants • Scoping Study will incorporate Q4 Mineral Resource Testwork / Process & update. For personal use only Infrastructure Engineering • Two phase approach: Environmental • Phase 1 delivers Heavy mineral concentrate (HMC) and Rare earth mi

  11. Slide 11: Rare Earths Processing Plant Project

    Rare Earths Processing Plant Project • Scoping Study nearing completion • Vertically integrated with Goschen Central project and supplementary supply for For personal use only 3rd party. • Rare earth mineral concentrate (REMC) feedstock to producing mixed rare earth oxide (MREO). • Strong ESG advant

  12. Slide 12: Mineral Sands Projects

    Mineral Sands Projects • Mineral sands assets all located in western Victoria on the edge of the Murray Basin mineral sands district. For personal use only • All projects well located with supporting infrastructure; rail, road, power and water. • Exploration friendly region. • Over 23,500 metres dri

  13. Slide 13: Douglas Project

    Douglas Project • High grades up to 18% total heavy minerals (THM) intersected. • Mineralised thickness of up to 33m from shallow depth. For personal use only • Comparable grades and thickness to the nearby Bondi strandline system which was mined by Iluka Resources • 2024 campaign consisted of 48 ho

  14. Slide 14: Watchem North Project

    Watchem North Project • Venice Beach Strandline discovered at Watchem North. Shallow, high-grade, heavy mineral sand strandline with a 9km strike length, including 6m at 37.9% Total For personal use only Heavy Mineral (THM). • A second potential strandline interpreted over a 35km strike length. • Dr

  15. Slide 15: Work Plan for CY2025

    Work Plan for CY2025 Q1 Q2 Q3 Q4 For personal use only Scoping Studies complete for Scoping Studies Goschen Central Project Goschen Central: - Mineralogy - MRE Update* Douglas Field Program: - Aeromagnetic Survey - Drilling* Drill Magnetic target - Assay Goschen Central RL application (submission du

  16. Slide 16: Investment Summary

    Investment Summary Corporate ✓ Strong team with history of project development For personal use only ✓ Cash balance of $2.68m to execute plan Execution ✓ Over 23,500 metres of Air core drilling complete ✓ Second JORC resource in progress at Goschen central ✓ Concept studies nearing completion Busine

  17. Slide 17: Contact

    For personal use only Contact Tom Davidson ACDC Metals Ltd tom.davidson@acdcmetals.com.au ACN 654 049 699 Chief Executive Officer Level 6, 111 Collins Street Melbourne VIC 3000 Mark Saxon W www.acdcmetals.com.au mark.saxon@acdcmetals.com.au Executive Director Share Registry* Andrew Shearer Automic P

  18. Slide 18: Appendix A: Peer Comparison data

    Appendix A Peer Comparison data For personal use only 18 ACDC Metals Presentation | February 2025

  19. Slide 19: Peer comparison data

    Peer comparison data Mineral Assemblage % of HM For personal use only Grade HM% Rutile Leucoxene Ilmenite Zircon Monazite Xenotime TREO ACDC Metals Ltd 2.2 8.4 11 21 22 3 0.45 2.7 Inferred 2.1 8.1 12 20 21 2.8 0.45 2.5 Indicated 2.3 9.1 10 22 24 3.4 0.45 2.9 Astron Ltd 4.8 8 18 33 18 2 - - Inferred

  20. Slide 20: Goschen Central Project compares well against peers

    Goschen Central Project compares well against peers 40 30 Results For personal use only 35 VHM Ltd 25 ACDC Metals Ltd • Key minerals of focus: 30 • Zircon 20 Monazite Zircon Grade (% of THM) 25 Astron Ltd • • Xenotime 20 15 Iluka • High assemblage of (WIM100) 15 10 magnet rare earth 10 oxides 5 • Pr

  21. Slide 21: Appendix B: JORC Tables

    Appendix B JORC Tables For personal use only 21 ACDC Metals Presentation | February 2025

  22. Slide 22: Company Mineral Resource

    Company Mineral Resource 620Mt Goschen Central Project Mineral Resource Estimate % of total HM For personal use only Classification Tonnes (Mt) Total HM % Slimes % Oversize % Mineral Assemblage Rutile Leucoxene Ilmenite Zircon Monazite Xenotime Indicated 210 2.3 21 4.3 9.1 10 22 24 3.4 0.45 Inferred

ACDC Metals — RIU Fremantle 2025 on 6ix