  1. Slide 1: Powering the Future with Innovative Mine-to-Market Solutions

    For personal use only ASX: ADC Powering the Future with Innovative Mine-to-Market Solutions IMARC Sydney | Oct 2024

  2. Slide 2: Important Information and Disclaimer

    Important Information and Disclaimer Disclaimer: The material in this presentation has been prepared by ACDC Metals Ltd (“Company”). This presentation may not be reproduced, redistributed or passed on, directly or indirectly, to any other person, or published, in whole or in part, for any purpose wi

  3. Slide 3: ACDC Corporate Strategy

    For personal use only ACDC Corporate Strategy Building a mine-to-market critical metals company with heavy mineral sand (HMS) assets and proprietary rare earth element (REE) processing technology. Secure supply of critical metals is essential for the energy transition. Through an innovative business

  4. Slide 4: ACDC Metals

    ACDC Metals To date For personal use only ✓ Listed in January 2023. ✓ 23,500 metres of air core drilling complete across our projects and assays received and reported. ✓ Significant strandline discoveries at Watchem North and Douglas ✓ Maiden JORC resource complete for Goschen Central Project in Nov

  5. Slide 5: Experienced Board & Management Team

    For personal use only Experienced Board & Management Team Tom Davidson Andrew Shearer Mark Saxon Chief Executive Officer Non-Executive Director and Chair Executive Director Engineer & Development Geologist & Corporate Geologist & Corporate Ivan Fairhall Richard Boyce Kent Balas Andrew Draffin Non-Ex

  6. Slide 6: Corporate Structure

    Corporate Structure ACDC Share Register Capital Structure Vendors For personal use only Shares on issue 72,305,130 22% Management & Directors Share price (24 Oct 2024) $0.07 Medallion Resources (TSXV:MDL) Consolidated & Market Capitalisation $5.06 M Institutional 8% Cash (Q3 CY2024) $3.06 M 63% 7% D

  7. Slide 7: What are Mineral Sands

    What are Mineral Sands Zircon Titanium Minerals Monazite Xenotime For personal use only One mine. Thousands of products Source: Minerals Council of Australia Zircon and Rutile Pricing (USD/t FOB) Monazite TREO - 60% (USD/kg) $2,500 $12.00 $10.00 $2,000 $8.00 $1,500 $6.00 $1,000 $4.00 Zircon Rutile $

  8. Slide 8: ACDC Metals Strategy: Mine to Magnet

    ACDC Metals Strategy: Mine to Magnet Phase 1 Heavy Mineral For personal use only Concentrate (HMC) Heavy Mineral Sand & Rare Earth Element Projects To Rare Earth Mineral Existing Concentrate (REMC) Markets Rare Earth Mining, Beneficiation Processing Mixed Rare to Concentrate Plant Earth Oxide (MREO)

  9. Slide 9: Mineral Sands Projects

    Mineral Sands Projects • Mineral sands assets all located in western Victoria on the edge of the Murray Basin mineral sands district. For personal use only • All projects well located with supporting infrastructure; rail, road, power and water. • Exploration friendly region. • Over 23,500 metres dri

  10. Slide 10: Goschen Central Project – Mineral Resource

    Goschen Central Project – Mineral Resource 2023 Results • 628Mt @ 1.9% THM (total heavy mineral) For personal use only • ‘Indicated’ 130Mt @ 2.0% THM • ‘Inferred’ 498Mt @ 1.9% THM • ~21% of Total rare earth oxide (TREO) is made up of valuable Magnet rare earth oxide (MREO) • High mineral assemblage;

  11. Slide 11: Goschen Central Project compares well against peers

    Goschen Central Project compares well against peers Mineral Assemblage of Resources 35 For personal use only Results 30 • Key minerals of focus: 25 • Zircon 20 • Monazite • Xenotime % 15 • High assemblage of 10 magnet rare earth oxides 5 • Pr 4.1% 0 • Nd 14.6% Grade HM% Zircon TREO % of HM Monazite

  12. Slide 12: Goschen Central Project – Scoping Study

    Goschen Central Project – Scoping Study Contributing consultants • Scoping Study will incorporate updated MRE. Testwork / Process & For personal use only Infrastructure Engineering • Two phase approach: Environmental • Phase 1 delivers Heavy mineral concentrate (HMC) and Rare earth mineral concentra

  13. Slide 13: Rare Earths Processing Plant Project

    Rare Earths Processing Plant Project • Scoping Study nearing completion • Vertically integrated with Goschen Central project and supplementary supply for For personal use only 3rd party. • Rare earth mineral concentrate (REMC) feedstock to producing mixed rare earth oxide (MREO). • Strong ESG advant

  14. Slide 14: Douglas Project

    Douglas Project • High grades up to 18% total heavy minerals (THM) intersected. • Mineralised thickness of up to 33m from shallow depth. For personal use only • Comparable grades and thickness to the nearby Bondi strandline system which was mined by Iluka Resources (approx. 20km) • Follow up drill c

  15. Slide 15: Watchem North Project

    Watchem North Project • Venice Beach Strandline discovered at Watchem North. Shallow, high-grade, heavy mineral sand strandline with a 9km strike length, including 6m at 37.9% Total For personal use only Heavy Mineral (THM). • A second potential strandline interpreted over a 35km strike length. • Dr

  16. Slide 16: Work Plan for CY2024

    Work Plan for CY2024 Q1 Q2 Q3 Q4 Follow up drilling @ Douglas & North Watchem For personal use only Drill Program: Goschen Central / North Watchem / Douglas Assay Results Goschen Central JORC resource update Scoping Studies complete for Scoping Studies Goschen Central Project Pilot Plant @ Mineral T

  17. Slide 17: Investment Summary

    Investment Summary Corporate ✓ Strong team with history of project development For personal use only ✓ Cash balance of $3.06m to execute plan Execution ✓ Over 23,500 metres of Air core drilling complete ✓ Second JORC resource in progress at Goschen central ✓ Concept studies nearing completion Busine

  18. Slide 18: Contact

    For personal use only Contact Tom Davidson ACDC Metals Ltd tom.davidson@acdcmetals.com.au ACN 654 049 699 Chief Executive Officer Level 6, 111 Collins Street Melbourne VIC 3000 Mark Saxon W www.acdcmetals.com.au mark.saxon@acdcmetals.com.au Executive Director Share Registry* Andrew Shearer Automic P

  19. Slide 19: Appendix A: Peer Comparison data

    Appendix A Peer Comparison data For personal use only 19 ACDC Metals Presentation | October 2024

  20. Slide 20: Peer comparison data

    Peer comparison data Mineral Assemblage % of HM Grade HM% Rutile Leucoxene Ilmenite Zircon Monazite Xenotime TREO For personal use only ACDC Metals Ltd Inferred 1.9 8.6 13 23 24 3.5 0.42 3.0 Indicated 2.0 9.2 10 22 24 3.7 0.44 3.0 Astron Ltd Inferred 4.7 9 17 33 18 2.0 - NA Indicated 4.5 8 18 31 17

  21. Slide 21: Appendix B: JORC Tables

    Appendix B JORC Tables For personal use only 21 ACDC Metals Presentation | October 2024

  22. Slide 22: Company Mineral Resource

    Company Mineral Resource 628Mt Goschen Central Project Mineral Resource Estimate % of total HM For personal use only Classification Tonnes (Mt) Total HM % Slimes % Oversize % Mineral Assemblage Rutile Leucoxene Ilmenite Zircon Monazite Xenotime Indicated 130 2.0 19 4.1 9.2 10 22 24 3.7 0.42 Inferred