Yorbeau Resources, Inc. Class A · TSX:YRB
Yorbeau Resources, Inc. Class A — Investor Presentation (April 2018)
37 slides from Yorbeau Resources, Inc. Class A's investor presentation, April 2018
Slide 1: Scott Project - Highlights
SCOTT PROJECT - HIGHLIGHTS Emerging zinc producer in Chibougamau mining camp The scientific and technical content of this presentation has been reviewed, prepared and approved by Mr. Laurent Hallé, P.Geo. (OGQ 388), Senior Exploration Consultant to Yorbeau, who is a “Qualified Person” within the mea
Slide 2: Chibougamau Mining Camp
CHIBOUGAMAU MINING CAMP Chi jougamau Camp Selco Lens Opemisk Mine to Ce rn - noe a "4 A lbs copper ‘Ss oie 1.2B 0.8 Moz gold \ ‘Lemoine Mine ave’ \ Legend oe , ee ona, . 5 \ 4.2% Cu, 9.8% Zn, [___] Prospective horizon 1 ke ee \ ; 4.2g/t Au, 83g/t Ag LC] eS ior oe ~~ promatte® / \ Lac Doré Complex St
Slide 3: Regional Geology
Regional Geology Plutons tardifs Plutons précoces Gneiss Fm. Chibougamau Lac Scott * Fm. Haiiy Fm. Stella et Chebistuan Complexe de Cummings Fm. Blondeau et Bordeleau Fm. Gilman Complexe du Lac Doré Fm. Waconichi /Modifié de Goutier et'Melancon’.2007 al meee oN. BUBSUBBEEOOR Fm. Obatogamau
Slide 4: Chibougamau Camp (forgotten mining camp?)
Chibougamau Camp (forgotten mining camp?) 20 mines, production: 43 Mt @ 1.7% Cu et 2.3 g/t Au 1.62 billion pounds (738,242 tonnes) of copper 3,234,229 ounces of gold The most important copper district in eastern Canada from 1960 to 1972 In addition: a VMS mine (Lemoine): among the highest
Slide 5: Property Geology
Property Geology Pluton de Chibougamau Granite, granodiorite Bordure (diorite, aplite, basalte) Complexe du Lac Doré ? Tonalite, diorite 4 quartz Formation de Gilman Rhyolite Andésite-dacite (volcanoclastique) Basalte, gabbro, chert, exhalite a Gabbro type Gilman Formation de Waconichi Porphyre a qu
Slide 6: Mineralized zones
Mineralized zones Lentille GAP
Slide 7: Vertical sections
Section 1900W Section 1400W Lentille GAP Section 800W Vertical sections Section 0W
Slide 8: Section 0W
g g bs) fa) fe) 8 N S 3 S| SL-42 Ss =} =) s21sp ~ 82-43 a4 O/61-7 61-2 61-4 2|si-44 SL-30 51-34 ‘SL-36 Z| SL-46 SL-49 sL-s2= rd om a iat lay fatal int A Selco-Scott Lens -200m Chibougamau Pluton 400m 600m Section OOOW 800m
Slide 9: Section 800W
200S OOON Chibougamau Pluton « 800 » Lens Noog. 4 7 om ~ |’ Sf 4 a a -200m 400m -600m Section 800W -800m
Slide 10: Section 1400W
oO Zz o= Q 8 S sC54 scoo 8 Ss N a oS SG-23 SC-18 $¢-152! SL-101 Zz 9-9 Om X -200m Central ens 3 zones \ 400m Chibougamau Pluton -600m SecTION 1400W -800m
Slide 11: Section 1900W
D Zz x ) 8 8 8 3 8 8 S| 6Sf? 8 N Om £ = oO 2 o Ps -200m Chibougamau Pluton 400m 600m GAP Section 19700W -800m
Slide 12: Location of level plans
Plan -450m Location of level plans Plan -650m Plan -850m
Slide 13: Plan -470m
800N 600N 400N 200N OOON eS West Lens Mo0ce Mo00c. AMAOO9I Moor MOOI AMAOOOL PLAN -470m
Slide 14: Plan -670m
800N 600N 400N POON OOON \ MOO0ce MOO0d. Moos GAP Lens MOO91 Moorl MOOcI MQOO! PLAN -670m
Slide 15: Plan -870m
B00N x aw, Cy # ww os) 7 7 wei? 600N 77 7? 7 47 0. \|7 N Open nmooze® AA000Z. Chibougamau Pluton pein _ MOOS! MOO! NA00TL M000! PLAN -870m
Slide 16: Alteration Index
FRESH ALTERATION INDEX 1 2 3 4 CORE EDGE 4 high SERICITE/CHLORITE 2 3 1 Low SERICITE/CHLORITE CHLORITE & QUARTZ SERICITE DESTRUCTION FELDSPAR DESTRUCTION
Slide 17: Scott Project Surface lithogeochem
Scott Project Surface lithogeochem 0 200 500 Selco-Scott lens metres
Slide 18: Scott Project -500m Lithogeochem
Scott Project Projet Scott -500m Lithogeochem Lithogeochem -500m 0 200 500 metres
Slide 19: Very large hydrothermal system!
Scott Project Very large hydrothermal system ! Lithogeochem -500m 0 500 metres
Slide 20: 3D Isometric View of Scott Lake Wireframes
3D Isometric View of Scott Lake Wireframes Looking Northeast AY CFO | Scott Lake Rhyolite Ss @RPA Ressources solides comme te roc. Consels énroues. 0 250 500 750 1000
Slide 21: 3D Isometric View of Scott Lake Wireframes
3D Isometric View of Scott Lake Wireframes Looking Southeast Scott Lake Rhyolite 0 250 500 750 1000 t er — Metres
Slide 22: View looking NE
View looking NE Selco Central West 800 Gap CFO
Slide 23: 3D Isometric View of Scott Lake Wireframes
Selco 3D Isometric View of Scott Lake Wireframes Looking Southeast Central Gap Zone Scott Lake Rhyolite 0 250 500 750 1000 E er —=
Slide 24: 3D Isometric View of Massive Sulphide Wireframe Models
3D Isometric View of Scott Lake Massive Sulphide Wireframe Models and Sulphide Stringer Blocks above NSR $65/t Looking Southeast 9100200 300400500 —— ae @RPA 7 Ressources socies comme Jeroc. Conseils éprouves.
Slide 25: Favorable horizontal widths (Depth -480m)
1700W 1800W 1700W 200N Favorable Favorablehorizontal horizontalwidths! widths! 100N 0 10 20 30 BlockModel Block Model(RPA (RPA2017) 2017) metres Depth Depth - 480m - 480m
Slide 26: Favorable horizontal widths (Depth -680m)
1900W 2000W N Favorable horizontal widths! N 10 20 30 Block Model (RPA 2017) metres Depth - 680m
Slide 27: Mineral Resources - Scott
Mineral Resources * - Scott Category Tonnes %Cu %Zn g/t Au g/t Ag Indicated 3,567,000 0.95 4.17 0.2 37 Inferred 14,281,000 0.78 3.49 0.2 22 Total 17,847,000 0.8 3.6 0.2 25 * Based on a NI 43-101 compliant Technical Report titled "Technical Report on the Preliminary Economic Assessment for the Scott
Slide 28: Exploration potential at depth and to southwest
Exploration potentiel at depth and to southwest Faille Gwillim
Slide 29: Metallurgical tests completed in 2017
Metallurgical tests Copper concentrate completed in 2017 25% Cu Zinc concentrate 55% Zn
Slide 30: Mine Development Layout
MINE DEVELOPMENT LAYOUT 500RL. cau _ ELEVATION PORTAL as VENT RAISE VENT RAISE RAR \ VENT VENT RAISE RAR pe | — eens nce | t- 250m CENTRAL ZONE 34 ZINC ZONE SELCO ZONE ORL + 500m, INTERNAL RAMP | j~ 7501 GAP ZONE ™ -500RL CFO ZONE U + 1000m INTERNAL RAMP STRINGER RHYOLITE ZONE Yorbeau Resources Inc.
Slide 31: Preliminary Economic Assessment – Summary
Preliminary Economic Assessment – Summary Zn: $US1.30/lb - Cu: $US3.50/lb - $C1.00=$US0.80 Net Sales LOM $1.98 billion (NSR) Net Cash Flow Pre-tax Net Cash Flow of $515.8 million IRR Pre-tax IRR of 16.5% with a 6-year payback NPV Pre-tax NPV(8%) of $144.0 million Life of mine (“LOM”) Opex
Slide 32: Preliminary Economic Assessment - Details
Preliminary Economic Assessment - Details Operating costs Pre-production capital costs ($/t milled) $(millions) Mining 54.14 Mining 52.58 Processing 27.49 Processing 60.00 General & Administration 7.40 Infrastructure 15.78 TOTAL 89.02 Tailings 4.65 Sub Total 133.01 EPCM* 46.55 Contingency 35.92 TOTA
Slide 33: Preliminary Economic Assessment - Details
Preliminary Economic Assessment - Details Peak annual production Peak period Average (per year) Zinc concentrate 72,400 tonnes years 9-12 Zinc metal (payable) 75 million pounds Copper concentrate 28,467 tonnes Copper metal (payable) years 5-8 15 million pounds Silver metal (payable) 395,835 ounces N
Slide 34: Low cash cost zinc producer (net of by-products)
Low cash cost zinc producer (net of by-products) millions $ Cdn pounds of payable zinc 810.9 $/lb payable zinc mining 650.9 0.80 $ processing 330.5 0.41 $ G&A 85.6 0.11 $ Treatment (Zn conc.) 177.0 0.22 $ Transport (Zn conc.) 47.0 0.06 $ total operating 1,291.0 1.59 $ Cu credits 673.5 0.83 $ Ag cred
Slide 35: Summary
SUMMARY Resources of nearly 18 Million tonnes Polymetallic Cu-Zn-Au-Ag , multiple lenses Excellent exploration potentiel Favorable geometry (good horizontal widths) Very favorable location Infrastructure, man power, etc. Reputable mining region (copper and gold) Including one of rich
Slide 36: Next Steps – Scott Project
Next Steps – Scott Project • Exploration: drilling planned on high priority targets • Extension of system to the west of regional Gwillim Lake fault • Search for financing and senior partner • Possible underground program to bring Inferred resources to Indicated category • Feasibility study • Techni
Slide 37: Merci! Meegwetch! Thank you!
Yorbeau Resources — Investor Presentation (April 2018) on 6ix