Regis Resources Limited · ASX:RRL
Regis Resources — Earnings Presentation (November 2021)
16 slides from Regis Resources's earnings presentation, Nov 22, 2021
Slide 1: Biannual Exploration Results Conference Call and Presentation
ABN 28 009 174 761 www.regisresources.com Level 2 516 Hay Street Subiaco WA 6008 Australia P 08 9442 2200 F 08 9442 2290 22 November 2021 Manager Announcements Company Announcements Office Australian Securities Exchange Limited 152-158 St Georges Terrace Perth WA 6000 REGIS RESOURCES LTD – BIANNUAL
Slide 2: Growth Through Exploration
GROWTH THROUGH EXPLORATION Jim Beyer – Managing Director & CEO Wade Evans – GM Growth 22 NOVEMBER 2021
Slide 3: Cautionary Statement
2 CAUTIONARY STATEMENT This presentation contains only a brief overview of Regis Resources Limited and its associated In each case, appropriate Competent Person’s consents were obtained for the release of that entities (“Regis or RRL") and their respective activities and operations. The contents of
Slide 4: A Future of Growth
3 A FUTURE OF GROWTH Dominant positions in two highly prospective greenstone belts Position of Strength Favourable mining jurisdiction of Western Australia Large under-explored greenstone belts Duketon Belt Long-term operational optionality with 3 mills at 10Moz Duketon and belt dominance at Tropica
Slide 5: Key Elements of Value Growth
4 KEY ELEMENTS OF VALUE GROWTH Exploration Life Extension Growth Increasing Business Value McPhillamys Step Change Growth Grow Open Pits & Undergrounds New mines and extensions to existing mines Tropicana (30%) Moolart Well Garden Well Rosemont Time
Slide 6: Duketon Exploration
5 DUKETON EXPLORATION Five Key Project Updates MOOLART WELL Gloster 2.5Mtpa Matts Bore Duketon North Operation (DNO) Projects Commonwealth Buckingham-Wellington Buckingham-Wallace (Moolart Well) Betelgeuse Commonwealth Rosemont Sth UG Duketon South Operation (DSO) Projects Garden Well Main UG Toohey
Slide 7: Duketon North Operations
6 DUKETON NORTH OPERATIONS 15km Significant advances at two key projects around DNO Moolart Well Mill Buckingham-Wellington (Moolart Well) Most significant fresh-rock mineralisation ever from Moolart reflecting limited historic work High-grade intersections suggest excellent potential to define high
Slide 8: Duketon North Operations
7 DUKETON NORTH OPERATIONS 15km Significant advances at two key projects around DNO Moolart Well Mill Commonwealth Prospect An extensive 2km by 2km area of supergene gold mineralisation under definition drilling Better results include: • 16m @ 7.6 g/t gold • 8m @ 3.1 g/t gold • 8m @ 2.6 g/t gold Fut
Slide 9: Duketon South Operations
8 DUKETON SOUTH OPERATIONS Significant advances to multiple projects around DSO Garden Well Main UG Rosemont Mill Garden Well Mill Further strong mineralisation from drilling beneath Garden Well Main pit continues to demonstrate the potential for establishing a new underground resource and potential
Slide 10: Duketon South Operations
9 DUKETON SOUTH OPERATIONS Significant advances to multiple projects around DSO Rosemont Mill Garden Well Rosemont South UG Mill High-grade gold mineralisation outside the current underground resource areas demonstrates potential for resource growth Narrow, very high-grade intervals with free gold d
Slide 11: Duketon South Operations (DSO)
10 DUKETON SOUTH OPERATIONS (DSO) Significant advances to multiple projects around DSO Rosemont Mill Ben Hur Project Garden Well Mill Thick, high-grade extensions down dip are expected to grow the open pit resources. Deeper intercepts show early indications of potential UG lodes Better results inclu
Slide 12: Tropicana Exploration
11 TROPICANA EXPLORATION Four Key Project Updates Angel Eyes Springbok Rusty Nail Tropicana UG Havana UG TROPICANA Havana Sth UG Boston Shaker UG 9Mtpa Madras Tropicana Mine Projects New Zebra Sanpan Boston Shaker Underground Extensions Snowball Tropicana Underground Bushwacker Exploration Havana Un
Slide 13: Tropicana – Underground Growth
12 TROPICANA – UNDERGROUND GROWTH Boston Shaker UG Tropicana UG Strong results continue to demonstrate down- Part of the production schedule with mine development plunge growth potential up to 200m below the allowing extension drilling from underground which is increasing current resource envelope a
Slide 14: Tropicana – Underground Growth
13 TROPICANA – UNDERGROUND GROWTH Havana Underground Havana South Underground Strong results continue from infill drilling to convert Four holes designed to test the down dip extension of high-grade inferred resource to indicated in preparation for the ore shoots at Havana South, increase confidence
Slide 15: Growth Pipeline
Target size: 14 GROWTH PIPELINE 250 koz 500 koz +1Moz +2Moz Exploration Advanced Exploration/Development Operating Charlies Kings Plains Galloway Discovery Bald Hill McPhillamys Ridge Tropicana Open Pits Regional Targets Boston Tropicana Madras Shaker Ext. UG Rusty Voodoo Nail Child Boston Shaker UG
Slide 16: Growth Through Exploration
GROWTH THROUGH EXPLORATION Jim Beyer – Managing Director & CEO Wade Evans – GM Growth ASX:RRL
Regis Resources — Earnings Presentation (November 2021) on 6ix