EcoGraf Ltd. · ASX:EGR
EcoGraf — Kibaran Resources — 121 Mining Investment Conference New York 2018
16 slides from EcoGraf's conference presentation, Oct 5, 2018

Slide 1: Building a sustainable global graphite business
ASX: KNL FSE: FMK 121 CONFERENCE NEW YORK – 4th & 5th OCTOBER 2018 Building a sustainable global graphite business

Slide 2: Disclaimer
DISCLAIMER Securities Disclaimer This presentation is for informational purposes only and does not constitute an offer to sell, or solicit to purchase, any securities. Such offer can be made only through proper subscription documentation and only to investors meeting strict suitability requirements.

Slide 3: Market Opportunity for Battery Graphite
MARKET OPPORTUNITY FOR BATTERY GRAPHITE Global expansion of electric vehicle markets forecast to drive a 700% increase in annual natural graphite demand by 2025 ..... to over 800,000 tonnes per annum Roskill, UBS ~55kg Mined natural flake graphite per EV 127,000 tonnes Used in 2017Roskill EV penetra

Slide 4: Market Opportunity for Battery Graphite
MARKET OPPORTUNITY FOR BATTERY GRAPHITE Accelerating demand for lithium-ion battery storage from the energy industry > US$8 trillion investment in wind > US$500 billion in new battery and solar to 2050 storage capacity by 2050 Mobile solar ………. powering villages in Mali and Niger Transported in sea

Slide 5: New Graphite Mining & Manufacturing Business Poised for Development
NEW GRAPHITE MINING & MANUFACTURING BUSINESS POISED FOR DEVELOPMENT Shares on issue Key holders Market cap Colonial 11% A$55m Listed 276m Board 10% Cash A$2.9m F-diluted 279m Value-on-Gr. 4% (1/7/18) GR Engineer. 2% Scalable mining project for Value-add manufacturing of long term supply of graphite

Slide 6: Graphite Business Summary
GRAPHITE BUSINESS SUMMARY Total pre-tax NPV10 US$356m (geared, nominal terms) Products Status Feasibility study Jun 2017 Feasibility study Dec 2017 Bank technical review Aug 2017 Non-HF purification IP developed Debt financing Pilot plant Pre-production cost US$89m Pilot plant scale-up US$4m 5,000tp

Slide 7: A High Quality Graphite Deposit with Scale
A HIGH QUALITY GRAPHITE DEPOSIT WITH SCALE Epanko Mineral Resource Estimate >8% TGC ▪ Mineral resource supports potential for depth and strike extensions of the Ore Reserve pit shells JORC Tonnage Contained ▪ Mineralisation commences at surface with minimal Classification (Mt) Graphite (t) cover Mea

Slide 8: VTEM Shows Highly Conductive Undrilled Western Zone with Significant Potential
VTEM SHOWS HIGHLY CONDUCTIVE UNDRILLED WESTERN ZONE WITH SIGNIFICANT POTENTIAL ▪ Significant mineralisation exists outside of the Mineral Resource estimate modelled on an 8% TGC cut-off compared to the 5% TGC cut-off utilised for the Ore Reserve ▪ High conductivity identified in VTEM survey indicate

Slide 9: Natural Flake Graphite Offtake Summary
NATURAL FLAKE GRAPHITE OFFTAKE SUMMARY Battery Markets Traditional Markets 9

Slide 10: Battery Graphite Manufacturing Update
BATTERY GRAPHITE MANUFACTURING UPDATE ▪ Pilot test work underway in Germany to produce commercial quantities of spherical graphite with financial support from German Government ▪ A new clean green processing technology developed and patented under trademark is cost competitive and avoids toxic hydro

Slide 11: Battery Graphite Schedule
BATTERY GRAPHITE SCHEDULE ▪ Phased commercialisation strategy for Battery Incremental Phase (Spherical) 2018 2019 2020 2021 Capital Graphite Epanko + Other Stage 1 existing In-progress Pilot Plant feedstocks 3,000tpa Expansion customer trials US$4m and sales Stage 2 5,000tpa US$25m Stage 3 20,000tpa

Slide 12: Natural Battery Graphite Supply Chain
NATURAL BATTERY GRAPHITE SUPPLY CHAIN Natural Graphite Battery Anode Cells Battery Systems (Purified Spherical Graphite) (Coated Spherical Graphite) (Integrated Cathode/Anode Cell) Development of European and Asian production hubs to produce battery product 12

Slide 13: Establishing a Global Graphite Supply Network
ESTABLISHING A GLOBAL GRAPHITE SUPPLY NETWORK Awareness from customers is driving demand for environmentally sustainable raw material supply chains EUROPEAN HUB ASIA-PACIFIC HUB 13

Slide 14: Supported by Key Stakeholders
SUPPORTED BY KEY STAKEHOLDERS Investment and financing Customers Technical expertise 14

Slide 15: Board and Management
BOARD AND MANAGEMENT Board and Management A strong mix of mining, commercial and graphite experience Robert Pett (Non-Executive Chairman) Mineral economist with over 30 years’ experience developing projects and mines in Australia and Africa. Founding Chairman of Resolute Mining Limited, with a stron

Slide 16: Thank You
www.kibaranresources.com THANK YOU 16 1 6
Source: Internet Archive copy of ecograf.com.au
More decks from EcoGraf Ltd.
2026 IMARC Conference34 slides · Oct 27, 2026
TGS 2026 Annual Conference19 slides · Sep 15, 2026
Investor Presentation (September 2026)41 slides · Sep 3, 2026
Investor Presentation (April 2026)22 slides · Apr 9, 2026
Investor Presentation (April 2026)25 slides · Apr 9, 2026
Investor Presentation (March 2026)35 slides · March 2026