Rumble Resources Limited · ASX:RTR

Rumble Resources — Investor Presentation (April 2013)

15 slides from Rumble Resources's investor presentation, Apr 10, 2013

  1. Slide 1: Rumble Resources Limited Corporate Presentation

    For personal use only Rumble Resources Limited April 2013 Corporate Presentation

  2. Slide 2: Corporate Overview

    Corporate Overview Capital Structure Share Price & Volume For personal use only Current Share Price A¢ 7.5cps 35 1.40 Closing Price (AUD cents) Million Shares Daily Volume Traded On-Market Daily Close Price Shares on Issue 1 # 42.3m 30 1.20 Options on Issue 2 # 33.8M 25 1.00 Market Capitalisation A$

  3. Slide 3: Board of Directors

    Board of Directors Board of Directors For personal use only Andrew McBain • Mr McBain has significant corporate and business management experience having successfully developed a number of start- Managing Director up businesses over the past 10 years • Previously Mr McBain was a director and foundin

  4. Slide 4: Asset Overview

    Asset Overview • Beadell Project For personal use only • Canegrass Project • Ashburton Project • Leyland Project • Derosa Project ASX: RTR | PAGE 4

  5. Slide 5: Overview

    Derosa Project – Overview For personal use only  6 contiguous tenements covering an area of over 1,300km² in a highly prospective region in Burkina Faso  Rumble will earn up to 75% in the Joint Venture with Canyon Resources Ltd (ASX:CAY) reducing to 25%  Burkina Faso:  22% of Birimian Greenstone

  6. Slide 6: Burkina Faso

    Derosa Project – Burkina Faso For personal use only ASX: RTR | PAGE 6

  7. Slide 7: Artisanal Workings

    Derosa Project – Artisanal Workings Bompela Artisanal Discovery Artisanal Mining to depth of 60 metres For personal use only  Major artisanal mining site discovered on at the Derosa Project (the Bompela permit) with site the covering an area approximately 400m by 200m  Detailed mapping & sampling

  8. Slide 8: Artisanal Workings

    Derosa Project – Artisanal Workings New Artisanal Site Nearby Bompela Permit Workings For personal use only New Artisanal Site • New active artisanal mining site 850m • An open pit now being excavated by along strike from main Bompela artisanal artisanal gold miners. Site was identified ASX: RTR | P

  9. Slide 9: Exploration

    Derosa Project – Exploration Bompela Extent of Workings For personal use only  SEMS completed detailed litho- structural and regolith mapping  Rock chip sampling returned grades of up to 24.5 g/t gold  Gold found in Quartz and Granitoid  The style of mineralisation appears similar to other signi

  10. Slide 10: Upcoming Milestones

    Derosa Project – Upcoming Milestones For personal use only Next Steps Leading to a Maiden RC Drilling Program Underway 1. Conduct infill geochemical surveying to delineate targets and assist with understanding the structure of the mineralised zones. 2. Undertake a ground magnetic survey over the mai

  11. Slide 11: Beadell Project

    Beadell Project Project Location  Maxwell prospect drilling For personal use only intersected wide zones of anomalous zinc, lead & copper displaying characteristics of a SEDEX deposit  Ninety Nine prospect intersected large, mineralised alteration zone EM and IP Prospects – main IP target remains

  12. Slide 12: Ashburton Project

    Ashburton Project Project Location For personal use only  Gold exploration targets within 5 – 15 km of the Paulsens Gold Mine (Northern Star’s 750,000oz Au deposit)  Paulsens South, Boolaloo, and Kooline projects all within prospective fault structures  NST spending $20m on exploration in region

  13. Slide 13: Leyland Project

    Leyland Project Project Location For personal use only  Large strategic holding acquired adjacent to Corazon Mining Ltd’s (ASX: CZN) Top Up Rise Project  3 tenement applications covering 1305 km² in the Gibson Desert in WA  Top Up Rise is considered prospective for Olympic Dam/Prominent Hill styl

  14. Slide 14: Summary

    Summary For personal use only 1. Tightly held stock with low market capitalisation – highly leveraged to exploration success 2. Existing workings at Derosa Project confirm significant gold mineralisation and will direct Rumbles near-term exploration efforts 3. Targeted RC and aircore drilling progra

  15. Slide 15: Contacts & Important Notice

    Contacts & Important Notice For personal use only Andrew McBain, Managing Director – 0417456895 a.mcbain@rumbleresources.com.au Terry Topping, Executive Director (Technical) – 0417923341 t.topping@rumbleresources.com.au Competent Person’s Statement: The information in this report that relates to Exp

Rumble Resources — Investor Presentation (April 2013) on 6ix