Slide 1: Rumble Resources Limited Corporate Presentation
For personal use only Rumble Resources Limited April 2013 Corporate Presentation
Slide 2: Corporate Overview
Corporate Overview Capital Structure Share Price & Volume For personal use only Current Share Price A¢ 7.5cps 35 1.40 Closing Price (AUD cents) Million Shares Daily Volume Traded On-Market Daily Close Price Shares on Issue 1 # 42.3m 30 1.20 Options on Issue 2 # 33.8M 25 1.00 Market Capitalisation A$
Slide 3: Board of Directors
Board of Directors Board of Directors For personal use only Andrew McBain • Mr McBain has significant corporate and business management experience having successfully developed a number of start- Managing Director up businesses over the past 10 years • Previously Mr McBain was a director and foundin
Slide 4: Asset Overview
Asset Overview • Beadell Project For personal use only • Canegrass Project • Ashburton Project • Leyland Project • Derosa Project ASX: RTR | PAGE 4
Slide 5: Overview
Derosa Project – Overview For personal use only 6 contiguous tenements covering an area of over 1,300km² in a highly prospective region in Burkina Faso Rumble will earn up to 75% in the Joint Venture with Canyon Resources Ltd (ASX:CAY) reducing to 25% Burkina Faso: 22% of Birimian Greenstone
Slide 6: Burkina Faso
Derosa Project – Burkina Faso For personal use only ASX: RTR | PAGE 6
Slide 7: Artisanal Workings
Derosa Project – Artisanal Workings Bompela Artisanal Discovery Artisanal Mining to depth of 60 metres For personal use only Major artisanal mining site discovered on at the Derosa Project (the Bompela permit) with site the covering an area approximately 400m by 200m Detailed mapping & sampling
Slide 8: Artisanal Workings
Derosa Project – Artisanal Workings New Artisanal Site Nearby Bompela Permit Workings For personal use only New Artisanal Site • New active artisanal mining site 850m • An open pit now being excavated by along strike from main Bompela artisanal artisanal gold miners. Site was identified ASX: RTR | P
Slide 9: Exploration
Derosa Project – Exploration Bompela Extent of Workings For personal use only SEMS completed detailed litho- structural and regolith mapping Rock chip sampling returned grades of up to 24.5 g/t gold Gold found in Quartz and Granitoid The style of mineralisation appears similar to other signi
Slide 10: Upcoming Milestones
Derosa Project – Upcoming Milestones For personal use only Next Steps Leading to a Maiden RC Drilling Program Underway 1. Conduct infill geochemical surveying to delineate targets and assist with understanding the structure of the mineralised zones. 2. Undertake a ground magnetic survey over the mai
Slide 11: Beadell Project
Beadell Project Project Location Maxwell prospect drilling For personal use only intersected wide zones of anomalous zinc, lead & copper displaying characteristics of a SEDEX deposit Ninety Nine prospect intersected large, mineralised alteration zone EM and IP Prospects – main IP target remains
Slide 12: Ashburton Project
Ashburton Project Project Location For personal use only Gold exploration targets within 5 – 15 km of the Paulsens Gold Mine (Northern Star’s 750,000oz Au deposit) Paulsens South, Boolaloo, and Kooline projects all within prospective fault structures NST spending $20m on exploration in region
Slide 13: Leyland Project
Leyland Project Project Location For personal use only Large strategic holding acquired adjacent to Corazon Mining Ltd’s (ASX: CZN) Top Up Rise Project 3 tenement applications covering 1305 km² in the Gibson Desert in WA Top Up Rise is considered prospective for Olympic Dam/Prominent Hill styl
Slide 14: Summary
Summary For personal use only 1. Tightly held stock with low market capitalisation – highly leveraged to exploration success 2. Existing workings at Derosa Project confirm significant gold mineralisation and will direct Rumbles near-term exploration efforts 3. Targeted RC and aircore drilling progra
Slide 15: Contacts & Important Notice
Contacts & Important Notice For personal use only Andrew McBain, Managing Director – 0417456895 a.mcbain@rumbleresources.com.au Terry Topping, Executive Director (Technical) – 0417923341 t.topping@rumbleresources.com.au Competent Person’s Statement: The information in this report that relates to Exp