Stellar Resources Limited · ASX:SRZ

Stellar Resources — Investor Presentation (May 2019)

26 slides from Stellar Resources's investor presentation, May 27, 2019

  1. Slide 1: Heemskirk Tin Project Investor Presentation

    1 For personal use only Investor Presentation HEEMSKIRK 27 May 2019 TIN PROJECT ASX: SRZ www.stellarresources.com.au

  2. Slide 2: Heemskirk Tin Project - Overview

    2 For personal use only HEEMSKIRK TIN PROJECT ‐ OVERVIEW  Enviable project location  S e c u r e t e n u r e ov e r A u s t r a l i a ’ s b e s t p o r t f o l i o o f t i n a s s e t s  Updated Mineral Resource Estimate (May 2019)  H e e m s k i r k Fa s t St a r t S c o p i n g St u d y  Mt R

  3. Slide 3: Enviable Project Location

    3 ENVIABLE PROJECT LOCATION For personal use only WEST COAST TASMANIA – AUSTRALIA’S LARGEST AND MOST PRODUCTIVE TIN FIELD  Stellar owned (100%) tin properties: • Heemskirk Project (Queen Hill, Severn, Montana and Oonah deposits) • Razorback and St Dizier Satellite deposits • Large Exploration Licen

  4. Slide 4: Best Portfolio of Tin Assets in Australia

    4 For personal use only BEST PORTFOLIO OF TIN ASSETS IN AUSTRALIA  Secure Tenure: ML’s over Heemskirk deposits and St Dizier  Large EL Package Providing Further Upside/Flexibility

  5. Slide 5: Heemskirk Updated Mineral Resource (May '19)

    5 For personal use only HEEMSKIRK UPDATED MINERAL RESOURCE (MAY ‘19) Classification Deposit Tonnage Total Sn Contained Cassiterite Cu Pb Zn mt % Sn t % of total Sn % % % Indicated Upper Queen Hill 0.32 1.0 3,230 87 0.2 2.1 1.0 Lower Queen Hill 0.65 1.4 9,230 97 0.0 0.1 0.1 Severn 1.15 1.0 11,500 99

  6. Slide 6: Geology - Queen Hill and Severn

    6 GEOLOGY – QUEEN HILL AND SEVERN For personal use only Schematic W‐E Cross‐Section 3700N, Showing Queen Hill and Severn Tin Deposits

  7. Slide 7: Severn Deposit

    7 SEVERN DEPOSIT For personal use only Severn Long Section Showing All Mineralised Zones (2017 Drillholes labelled) 400m Strike Extent 200µ 380m Dip Extent 3m – 50m Thickness OPEN

  8. Slide 8: Heemskirk Fast Start Scoping Study

    8 HEEMSKIRK FAST START SCOPING STUDY For personal use only  Study underpinned by May‘19 Updated Resource (inc. 2.1Mt Indicated Resource)  Fast Start development: Queen Hill  Sequential development; commencing at shallow Queen Hill deposit then later to larger Severn deposit Montana  Faster acces

  9. Slide 9: Heemskirk - Metallurgy

    9 For personal use only HEEMSKIRK – METALLURGY  Renison Tin flow‐sheet tested at Proposed Tin Processing Plant bench scale using drill core from Severn and Queen Hill deposits  Test‐work undertaken by ALS Burnie and supervised by Worley Parsons  Circuit optimised using Severn sample:  grind size

  10. Slide 10: Heemskirk - Environment

    10 For personal use only HEEMSKIRK – ENVIRONMENT  Notice of Intent submitted to Tasmanian Secure Long‐Term Tailings Dam Site EPA and environmental assessment program agreed (DPEMP)  No environmental impediments identified by Stage 1 surveying of mine, tailings transport and storage sites  Mining

  11. Slide 11: Razorback Satellite Deposit

    11 RAZORBACK SATELLITE DEPOSIT For personal use only POTENTIAL TO ADD EARLY PRODUCTION AT LOW COST Tailings Re‐Processing Razorback Open Pit and Tailings Dam Sampling  Initial Focus on re‐processing Razorback mine tailings  12 hand auger holes drilled in Jan 2019 averaging 0.25% Sn  Pilot scale t

  12. Slide 12: St Dizier Open Pit Satellite Deposit

    12 ST DIZIER OPEN PIT SATELLITE DEPOSIT For personal use only POTENTIAL TO ADD VALUE VIA LOW COST OPEN‐PIT St Dizier Scoping Study Results (Jan ‘19)  Higher grades near surface in Central Lode – attractive for open pit mining  Open Pit minable resource of 409kt @ 0.90% tin in pit shell over upper

  13. Slide 13: Heemskirk Could Become the Next Renison

    13 For personal use only HEEMSKIRK COULD BECOME THE NEXT RENISON  Renison, Australia’s oldest, largest & highest grade tin mine is located 18km to the NE of Heemskirk  Heemskirk and Renison share the same ore genesis and geology  Heemskirk deposits drilled to a depth of 500m – all deposits open a

  14. Slide 14: Montana Flats Exploration Upside

    14 For personal use only MONTANA FLATS EXPLORATION UPSIDE  EL13/2018 adds 3 km of strike length along the northwest trending, tin‐mineralising Oonah and Montana Faults  All tin deposits and major silver mines lie along or between the Oonah and Montana Faults  Silver miners of the 1900s largely ig

  15. Slide 15: Tin Expected to Perform Strongly

    15 TIN EXPECTED TO PERFORM STRONGLY For personal use only  Tin supply tightening as exports from Myanmar decline and production in China and Indonesia faces greater regulation – exchange stocks also low  Mine development queue is limited – only one new mine under development (Bisie in DRC) and no

  16. Slide 16: New Technology to Drive Tin Use

    16 NEW TECHNOLOGY TO DRIVE TIN USE For personal use only  Tin ranked as the metal best placed to benefit from new technologies  Tin use in electrical and energy storage applications is easy to achieve and potentially disruptive  New uses of tin could have a major impact on market size

  17. Slide 17: 2019 Work Plan

    17 For personal use only 2019 WORK PLAN St Dizier Scoping Study ‐ completed Heemskirk Resource Update – completed Heemskirk Fast Start Development Scoping Study – underway Razorback Tailings – metallurgical testing underway Razorback Resource Evaluation – to follow tailings test‐work Fund and implem

  18. Slide 18: The Investment Proposition

    18 For personal use only THE INVESTMENT PROPOSITION Investment in the best tin project in Australia – highest grade undeveloped tin project in Australia and third highest globally Low cost investment – market capitalization undervalues Stellar’s tin assets Re‐focused Fast Start Heemskirk development

  19. Slide 19: Disclaimer

    19 For personal use only DISCLAIMER FORWARD LOOKING STATEMENT This presentation may include forward‐looking statements. Forward‐looking statements include, but are not limited to statements concerning Stellar Resources Limited’s planned activities and other statements that are not historical facts.

  20. Slide 20: Appendix

    20 For personal use only APPENDIX FINANCIAL SUMMARY BOARD OF DIRECTORS QUEEN HILL LONG PROJECTION TIN DEMAND DRIVERS

  21. Slide 21: Share Price Yet to Reflect Solid Achievements at Heemskirk Tin

    21 SHARE PRICE YET TO REFLECT SOLID For personal use only ACHIEVEMENTS AT HEEMSKIRK TIN COMPANY OVERVIEW  100% owner of Heemskirk Tin Project, 150km south of Burnie, Tasmania  Stand‐ out high grade resource ( 1.1% Sn)  Focused on Heemskirk Fast Start development with vision to be a major tin prod

  22. Slide 22: Board of Directors

    22 EXPERIENCED AND MULTI‐DISCIPLINARY WITH STRONG GLOBAL CONNECTIONS BOARD OF DIRECTORS For personal use only PHIL HARMAN, NON‐EXECUTIVE CHAIRMAN GEOPHYSICIST Over 30 years experience in BHP Billiton minerals exploration THOMAS WHITING, NON‐EXECUTIVE DIRECTOR Past and present Director of GEOPHYSICIS

  23. Slide 23: Queen Hill Deposit - Long Section

    23 For personal use only QUEEN HILL DEPOSIT – LONG SECTION Queen Hill Long Section Showing All Mineralised Zones (2017 Drillholes labelled) 400m Strike Extent 400m Dip Extent 200µ 2m – 25m Thickness OPEN

  24. Slide 24: Future Growth for Tin in EV Batteries

    24 F U T U R E G R O W T H F O R T I N I N E V B A T T E R I E S For personal use only WILL 2 ND GENERATION EV BATTERIES DRIVE GROWTH? I T A V I E W O F T I N ’ S R O L E

  25. Slide 25: Tin Demand: Advantages of Using Tin in EV and PV

    25 TIN DEMAND ADVANTAGES OF USING TIN IN EV AND PV For personal use only Increases energy density in battery anodes = increased battery life University of Alberta, Cornell University, Furukawa Group, University of Texas Improves conductivity of silicon and graphite anodes = improved cycle times Niss

  26. Slide 26: Stellar Resources Limited contact details

    26 For personal use only STELLAR Level 17, 530 Collins Street Melbourne VIC 3000 RESOURCES Phone +61 3 9692 7222 Fax +61 3 9077 9233 LIMITED www.stellarresources.com.au

Stellar Resources — Investor Presentation (May 2019) on 6ix