Rowan Companies plc

Rowan Companies — Credit Suisse Vail Energy Summit 2014

35 slides from Rowan Companies's conference presentation, Feb 10, 2014

  1. Slide 1: Execution Year

    Slide 1: Execution Year

    Execution Year Credit Suisse Vail Energy Summit Matt Ralls, Chief Executive Officer February 12, 2014 Execution Year Investor Presentation February, 2014

  2. Slide 2: Forward-Looking Statements

    Slide 2: Forward-Looking Statements

    Forward - Looking Statements 2 This report contains f orward - looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, as well as statements as to the expectations, beliefs and future expected business, financial performance and p

  3. Slide 3: Following A Clear Strategic Path

    Slide 3: Following A Clear Strategic Path

    Following A Clear Strategic Path Built Around… 3 Continuing low operating downtime Execution Starting UDW entry successfully Continuing low and improving safety results Reducing jack - up out of service time Capital Allocation Considering options for free cash flow beginning 2016 Reinstating quarter

  4. Slide 4: Rowan's Fleet Is Geographically Diversified

    Slide 4: Rowan's Fleet Is Geographically Diversified

    Rowan’s Fleet Is Geographically Diversified 4 6 / North Sea 10 / Middle East 4 / SE Asia 7 / US GOM Drillship #1 19 High - spec Jack - ups 8 Premium Jack - ups 3 Commodity Jack - ups with Skid - base Capability 4 Ultra - Deepwater Drillships (1) 1 / Med 2 / Trinidad Drillship #2 Jack - up Rigs UDW D

  5. Slide 5: Strong Backlog Growth And Diversified Customer Base

    Slide 5: Strong Backlog Growth And Diversified Customer Base

    5 Strong Backlog Growth And Diversified Customer Base $1.2 Bn $1.5 Bn 2010 2011 2012 Current $2.2 Bn $5.0 Bn 23% 21% 40% 6% 2% 1% 2% 5% Norway Middle East Deepwater UK SEA Egypt Trinidad Growing Backlog Distributed By Geography Rowan’s Diverse Customer Base GOM As of 01/21/2014

  6. Slide 6: Rowan Is The Leader In High-spec Jack-ups

    Slide 6: Rowan Is The Leader In High-spec Jack-ups

    Rowan Is The Leader In High - spec Jack - ups Number of High - Spec Jack - ups 0 2 4 6 8 10 12 14 16 18 20 Current By YE 2017 19 Rowan High - spec Jack - ups Includes data supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 01/02/14) 6

  7. Slide 7: Rowan Achieves Higher Jack-up Day Rates And Utilization

    Slide 7: Rowan Achieves Higher Jack-up Day Rates And Utilization

    Rowan Achieves Higher Jack - up Day Rates And Utilization Comparison of Current Jack - up Day Rates: Rowan vs. Peers (000s) Comparison of Jack - up Utilization 2003 – 2013: Rowan vs. Peers 0 20 40 60 80 100 Rowan(2) Peers (1) (1) Peers include DO, RIG, NE, SDRL/ NADL, and ESV (2) Rowan’s marketed ut

  8. Slide 8: Global Jack-up Fleet Utilization Is 89%, Marketed 95%

    Slide 8: Global Jack-up Fleet Utilization Is 89%, Marketed 95%

    Global Jack - up Fleet Utilization Is 89%, Marketed 95% 8 US GOM Indian Ocean North Sea Mediterranean Middle East Southeast Asia Mexico C&S America West Africa Australia 59% 59 Rigs 89% 53 Rigs 88% 16 Rigs 89% 27 Rigs 100% 34 Rigs 100% 2 Rigs 95% 74 Rigs 90% 145 Rigs 89% 18 Rigs 100% 45 Rigs Include

  9. Slide 9: Only Competitive Jack-ups Less Than 25 Years Old

    Slide 9: Only Competitive Jack-ups Less Than 25 Years Old

    Only 174 Competitive Jack - ups Less Than 25 Years Old 0 100 200 300 400 500 600 Total Supply CS / OOS China / Iran Competitive Supply 513 Total Jack - ups 41 Cold Stacked / OOS 57 Non - competitive Countries 415 Competitive Jack - ups 58% Older Than 25 Years 9 Includes data supplied by ODS - Petrod

  10. Slide 10: Jack-up Market Bifurcation Continues In Improving Market

    Slide 10: Jack-up Market Bifurcation Continues In Improving Market

    Jack - up Market Bifurcation Continues In Improving Market 20 40 60 80 100 IS, MS, MC <300'IC 300'IC 350'+ IC(including High Spec) High Spec* Worldwide Utilization By Rig Class % * Excludes Chinese Rig, Master Driller 10 Includes data supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 01/02/14)

  11. Slide 11: What's Driving Bifurcation In The Jack-up Markets?

    Slide 11: What's Driving Bifurcation In The Jack-up Markets?

    What’s Driving Bifurcation In The Jack - up Markets? • Operators need greater rig capabilities to drill challenging wellbore designs » Deep shelf gas » Long reach horizontals » HPHT » Large pipe programs/heavy string weights • IOCs and NOCs are focused on achieving lower wellbore costs rather than t

  12. Slide 12: A Wave Of Jack-up Retirements Could Be Coming

    Slide 12: A Wave Of Jack-up Retirements Could Be Coming

    0 50 100 150 200 250 300 A Wave Of Jack - up Retirements Could Be Coming 12 World jack - up rig population over 40 years old is growing… # of jack - ups 40+ years JACK - UPS OVER 40+ YEARS IN 10 YEARS 294 26 JACK - UPS OVER 40+ YEARS TODAY Includes data supplied by ODS - Petrodata, Inc; Copyright 20

  13. Slide 13: Newbuild Jack-ups Needed To Replace Aging Fleet

    Slide 13: Newbuild Jack-ups Needed To Replace Aging Fleet

    Newbuild Jack - ups Needed To Replace Aging Fleet 13 Jack - ups by Year Built JACK - UPS DELIVERED TO - DATE 168 0 10 20 30 40 50 60 70 80 90 310 JACK - UPS OVER 25 YEARS 299 JACK - UPS IN LATEST CYCLE Includes data supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 01/02/14)

  14. Slide 14: Newbuild Jack-ups Are High-Spec

    Slide 14: Newbuild Jack-ups Are High-Spec

    38 Newbuild Jack - ups Are High - Spec 14 14 12 12 22 47 21 0 10 20 30 40 50 60 2014 2015 2016+ High Spec Other 300’IC+ Newbuilds Under Construction: 128 Total 59 36 33 • Only 38 of the 128 units under construction are rated as high - spec • 21% of the high - spec newbuilds are contracted (8 units)

  15. Slide 15: High-Spec Rates Have Climbed Through Newbuild Cycle

    Slide 15: High-Spec Rates Have Climbed Through Newbuild Cycle

    0 100 200 300 400 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 High - Spec Rates Have Climbed Through Newbuild Cycle 15 $0 $50,000 $100,000 $150,000 $200,000 $250,000 Premium* High Spec Average Earned Day Rate Cumulative Jack - ups Delivered * Premium rigs defined as 350’IC+

  16. Slide 16: Rowan Is Confident About 2014 Jack-up Fleet Rollovers

    Slide 16: Rowan Is Confident About 2014 Jack-up Fleet Rollovers

    Rowan Is Confident About 2014 Jack - up Fleet Rollovers • 19 of 30 Rowan jack - ups are scheduled to rollover in 2014 • 12 of the 19 jack - ups are high - spec rigs, and demand for high - spec equipment continues to be strong • Locations : Middle East (7 rigs), GOM (5 rigs), SEA (4 rigs), North Sea

  17. Slide 17: Rowan Is Entering UDW Market With Advantages

    Slide 17: Rowan Is Entering UDW Market With Advantages

    Rowan Is Entering UDW Market With Advantages • High - specification drillship design with built - in redundancies • Core team of highly experienced and respected deepwater professionals in place • Contracting success demonstrates customer enthusiasm 17

  18. Slide 18: Rowan UDW Construction Program Progressing

    Slide 18: Rowan UDW Construction Program Progressing

    Rowan UDW Construction Program Progressing • Delivered first UDW rig, Rowan Renaissance , in January 2014 » Despite supplier delays, still targeting on rate April 2014 • UDW man power ramp up progressing as planned • Construction on schedule for next three drillships: Rowan Resolute , Rowan Reliance

  19. Slide 19: UDW Drillships Contracted

    Slide 19: UDW Drillships Contracted

    3 of 4 UDW Drillships Contracted 19 Delivered January 2014 2013 2014 2015 3 Year Contract Commences April 2014 Rowan Renaissance 1 Delivery June 2014 2 Rowan Resolute Delivery October 2014 3 Rowan Reliance Delivery March 2015 4 Rowan Relentless 3 Year Contract Commences September 2014 3 Year Contrac

  20. Slide 20: Worldwide Drillship Utilization Is 96%

    Slide 20: Worldwide Drillship Utilization Is 96%

    Worldwide Drillship Utilization I s 96% 20 20 USA Indian Ocean North Sea Middle East Far East Southeast Asia C&S America West Africa Australia 95% 22 Rigs 96% 28 Rigs 95% 21 Rigs 100% 11 Rigs 100% 2 Rig 67% 6 Rigs 100% 3 Rigs 100% 1 Rig 100% 2 Rigs Includes data supplied by ODS - Petrodata, Inc; Cop

  21. Slide 21: Few Newbuild Drillships In Delivery Window Match Specs

    Slide 21: Few Newbuild Drillships In Delivery Window Match Specs

    Few Newbuild Drillships In Delivery Window Match Specs 21 16 4 9 15 11 13 4 1 0 5 10 15 20 25 30 2014 2015 2016 2017+ Contracted Not Contracted 10,000’+ Drillships 17 27 • 73 Total drillships are under construction • 60% are contracted • The Rowan Relentless will be delivered in March 2015, and few

  22. Slide 22: Floater Market Bifurcating At A Fast Pace

    Slide 22: Floater Market Bifurcating At A Fast Pace

    Floater Market Bifurcating At A Fast Pace 50 60 70 80 90 100 <5,000' 5,000'-7,499' 7,500'-9,999' 10,000'+ % Worldwide Utilization by Water Depth 22 Floater Market includes drillships and semis. D ata supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 01/02/14)

  23. Slide 23: UDW Day Rates Remain at $550K Or Above

    Slide 23: UDW Day Rates Remain at $550K Or Above

    $300,000 $350,000 $400,000 $450,000 $500,000 $550,000 $600,000 $650,000 $700,000 UDW Day Rates Remain at $550K Or Above 23 $619K $608K $602K Rowan Industry Includes data supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 01/20/14) (1) (1) $461K Transocean 5 th Gen rig contracted for eight month

  24. Slide 24: Rowan Drillships Drive Sector Leading EPS Growth

    Slide 24: Rowan Drillships Drive Sector Leading EPS Growth

    59% 62% 48% 26% 9% 7% 27% 144% 47% 58% 47% 46% 23% 40% 0% 50% 100% 150% 200% 250% RDC NE* ATW* SDRL DO ESV RIG Estimated Earnings Growth Δ 2013( e) - 2014(e) Δ 2013( e) - 2015(e) FactSet e stimates as of 02/05/2014 Rowan Drillships Drive Sector Leading EPS Growth 24 Expect further EPS growth in 2016

  25. Slide 25: Earnings Growth Not Reflected In 2015 Multiples

    Slide 25: Earnings Growth Not Reflected In 2015 Multiples

    25 Earnings Growth Not Reflected In 2015 Multiples As of April 12, 2012 Aggregate Value Price to Share Price to Earnings to EBITDA Book Price 2012 2013 2014 2012 2013 2014 Value ($) (x) (x) (x) (x) (x) (x) Seadrill 50.27 16.7x 10.5x 8.9x 7.4x 6.1x 5.7x 1.1x Transocean 37.27 11.9x 11.0x 9.8x 10.5x 9.

  26. Slide 26: Rowan Is Focused On Execution - Increasing On Rate Time

    Slide 26: Rowan Is Focused On Execution - Increasing On Rate Time

    1.89% 1.65% 3.27% 2.47% 1.37% 0.80% 0.74% 1.32% Rowan Is Focused On Execution - Increasing on Rate Time 11% 11% 14% 10% 9% 8% 13% 10% 11% 9% 5% 5% Out of Service Operational Downtime Includes shipyard, transit and inspection days when:  Rigs are on contract and available to earn day rate, but off r

  27. Slide 27: Rowan Newbuild Drillship Program Fully Financed

    Slide 27: Rowan Newbuild Drillship Program Fully Financed

    Rowan Newbuild Drillship Program Fully Financed (in millions) Projected 12/31/2013 Projected 12/31/2014 Cash and available credit $1,843 $1,142 Total Debt $2,009 $2,808 Total Debt - to - Cap 29% 35% Net Debt - to - Cap 16% 34% 27 Investment Grade Balance Sheet (Baa3/BBB - ) Rowan Newbuild Capex With

  28. Slide 28: Rowan Is Reinstating A Quarterly Dividend

    Slide 28: Rowan Is Reinstating A Quarterly Dividend

    Rowan Is Reinstating A Quarterly Dividend • Initiating a $0.10 per share dividend in Q2 2014 » Confident in the earnings growth expected from Rowan’s well positioned jack - up fleet and ultra - deepwater entry » Expect to be able to sustain and potentially grow the dividend over time » Committed to

  29. Slide 29: Rowan is One Team

    Slide 29: Rowan is One Team

    29 Rowan is One Team built around great equipment, great people, and a shared set of values and purpose.

  30. Slide 30: Appendix

    Slide 30: Appendix

    Appendix 30

  31. Slide 31: Rowan Drillships Built With The Operator In Mind

    Slide 31: Rowan Drillships Built With The Operator In Mind

    Rowan Drillships Built With The Operator In Mind • Two seven - ram BOPs • Equipped with 12,000 ft of riser • DP - 3 compliant with retractable thrusters • Five mud pumps with dual mud systems • Four million pound riser tensioning system • Third load path • Accommodations for 210 people on board 31 E

  32. Slide 32: 2013 Operating Cost Components

    Slide 32: 2013 Operating Cost Components

    2013 Operating Cost Components 52% 11% 18% 4% 3% 3% 9% Labor & Fringes Employee-related * R&M Insurance Rig moves Rebillables All other ** 32 * Employee - related costs include training, catering and crew transportation ** Other includes rentals, medics, agent commissions, satellite communications a

  33. Slide 33: Current Rowan Avg. Regional Offshore Rig Operating Costs

    Slide 33: Current Rowan Avg. Regional Offshore Rig Operating Costs

    Current Rowan Avg. Regional Offshore Rig Operating Costs 33 Region Jack - ups Gulf of Mexico Low – Mid $50s Egypt Low - Mid $60s Middle East Low $50s – Low $70s U.K. North Sea Low – Mid $80s Norway North Sea Low - Mid $160s Southeast Asia Mid – High $50s Trinidad Mid $60s – Low $70s (000’s per day)

  34. Slide 34: Glossary of Terms

    Slide 34: Glossary of Terms

    Glossary of Terms Blowout Preventer (BOP): An emergency shut - off device comprised of a series, or “stack”, of valves that shut the wellbore in the event that hydrocarbons enter the wellbore and pressure containment is compromised. The BOP is intended to serve as a pressure control system of last r

  35. Slide 35: Investor Contact

    Slide 35: Investor Contact

    Investor Contact: Suzanne M. Spera Director, Investor Relations sspera@rowancompanies.com 713.960.7517 Rowan Companies 2800 Post Oak Blvd. Suite 5450 Houston, TX 77056 713.621.7800 www.rowancompanies.com

Source: SEC EDGAR · 8-K filed Feb 10, 2014

More decks from Rowan Companies plc