Rowan Companies — Investor Presentation (May 2014)
39 slides from Rowan Companies's investor presentation, May 19, 2014
Slide 1: Execution Year Investor Presentation
Execution Year Investor Presentation May, 2014
Slide 2: Forward-Looking Statements
Forward - Looking Statements 2 This report contains f orward - looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, as well as statements as to the expectations, beliefs and future expected business, financial performance and p
Slide 3: Rowan's Strategic Transitions And Achievements
Rowan’s Strategic Transitions And Achievements June 2011 Sold manufacturing business for $1.1 bn in cash June 2011 Initiated 4 rig, $ 3 bn UDW drillship expansion September 2011 Sold Land business for $510 mm in cash December 2011 Completed jack - up newbuild program $3 bn over 5 years 11 high - spe
Slide 4: Following A Clear Strategic Path
Following A Clear Strategic Path And Focused On: 4 Continued low operating downtime Execution Successful UDW entry Continued strong safety results Reduced jack - up out of service time Capital Allocation Potential for share buybacks or fleet expansion as free cash flow develops Reinstating quarterly
Slide 5: Rowan Is Reinstating A Quarterly Dividend
Rowan Is Reinstating A Quarterly Dividend • Initiating a $0.10 per share dividend in Q2 2014 » Confident in the earnings growth expected from Rowan’s well positioned jack - up fleet and ultra - deepwater entry » Expect to be able to sustain and potentially grow the dividend over time » Committed to
Slide 6: Rowan's Fleet Is Geographically Diversified
Rowan’s Fleet Is Geographically Diversified 6 6 / North Sea 10 / Middle East 4 / SE Asia 7 / US GOM Drillship #1 19 High - spec Jack - ups 8 Premium Jack - ups 3 Commodity Jack - ups with Skid - base Capability (2) 4 Ultra - Deepwater Drillships (1) 1 / Med 2 / Trinidad Drillship #2 Jack - up Rigs U
Slide 7: Strong Backlog Growth And Diversified Customer Base
7 Strong Backlog Growth And Diversified Customer Base $1.2 Bn $1.5 Bn 2010 2011 2012 Current $2.2 Bn $5.0 Bn 22% 24% 40% 5% 3% 1% 1% 1% 5% Norway Middle East Deepwater UK SEA Egypt Trinidad Growing Backlog Distributed By Geography Rowan’s Diverse Customer Base GOM As of 04/23/2014 Morrocco
Slide 8: Rowan is the Leader in High-Spec Jack-ups
0 2 4 6 8 10 12 14 16 18 20 Current By YE 2017 Rowan is t he Leader in High - Spec Jack - ups Number of High - Spec Jack - ups 19 Rowan High - Spec Jack - ups Includes data supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 05/01/14) 8
Slide 9: Rowan Achieves Higher Jack-up Day Rates and Utilization
Rowan Achieves Higher Jack - up Day Rates and Utilization Comparison of Current Jack - up Earned Day Rates: Rowan vs. Peers (1) (000s) Comparison of Jack - up Marketed Utilization (2) 2004 – 2014 YTD: Rowan vs. Peers (1) 0 20 40 60 80 100 Rowan Peers (1) (1) Peers include DO, RIG, NE, SDRL/ NADL, an
Slide 10: Global Jack-up Fleet Utilization Is 89%, Marketed 95%
Global Jack - up Fleet Utilization Is 89%, Marketed 95% 10 US GOM Indian Ocean North Sea Mediterranean Middle East Southeast Asia Mexico C&S America West Africa Australia 55% 58 Rigs 93% 56 Rigs 82% 17 Rigs 89% 27 Rigs 100% 36 Rigs 100% 1 Rigs 94% 70 Rigs 90% 146 Rigs 94% 18 Rigs 100% 47 Rigs Fleet
Slide 11: Only Competitive Jack-ups Less Than 25 Years Old
Only 182 Competitive Jack - ups Less Than 25 Years Old 0 100 200 300 400 500 600 Total Supply CS / OOS China / Iran Competitive Supply 520 Total Jack - ups 35 Cold Stacked / OOS 56 Non - competitive Countries 429 Competitive Jack - ups 58% Older Than 25 Years 11 Includes data supplied by ODS - Petro
Slide 12: Jack-up Market Bifurcation Continues in Improving Market
Jack - up Market Bifurcation Continues in Improving Market 20 40 60 80 100 IS, MS, MC <300'IC 300'IC 350'+ IC(including High Spec) High Spec* Worldwide Utilization By Rig Class % * Excludes Chinese Rig, Master Driller 12 Includes data supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 05/05/14)
Slide 13: What's Driving Bifurcation In The Jack-up Markets?
What’s Driving Bifurcation In The Jack - up Markets? • Operators need greater rig capabilities to drill challenging wellbore designs » Deep shelf gas » Long reach horizontals » HPHT » Large pipe programs/heavy string weights • IOCs and NOCs are focused on achieving lower wellbore costs rather than t
Slide 14: A Wave Of Jack-up Retirements Could Be Coming
0 50 100 150 200 250 300 A Wave Of Jack - up Retirements Could Be Coming 14 World jack - up rig population over 40 years old is growing… # of jack - ups 40+ years JACK - UPS 40+ YEARS IN 10 YEARS 292 26 JACK - UPS 40+ YEARS TODAY Includes data supplied by ODS - Petrodata, Inc; Copyright 2014 (as of
Slide 15: Newbuild Jack-ups Needed To Replace Aging Fleet
Newbuild Jack - ups Needed To Replace Aging Fleet 15 Jack - ups by Year Built JACK - UPS DELIVERED TO - DATE 177 0 10 20 30 40 50 60 70 80 308 JACK - UPS OVER 25 YEARS 322 JACK - UPS IN LATEST CYCLE Includes data supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 05/05/14)
Slide 16: Newbuild Jack-ups are High-Spec
39 Newbuild Jack - ups are High - Spec 16 • 11% Contracted • ~33% Being built by established drilling contractors • NOCs and IOCs require trained and proven operational and safety systems that many speculative newbuild companies will not be able to provide 7 4 5 24 59 46 0 10 20 30 40 50 60 2014 201
Slide 17: High-Spec Rates Have Increased Through Newbuild Cycle
0 100 200 300 400 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 YTD High - Spec Rates Have Increased Through Newbuild Cycle 17 Average Earned Day Rate Cumulative Jack - ups Delivered * Premium rigs defined as 350’IC+ (inclusive of high - spec jack - ups) 198 17 Includes
Slide 18: Rowan Is Confident About 2014 Jack-up Fleet Rollovers
Rowan Is Confident About 2014 Jack - up Fleet Rollovers • Currently, 13 of 30 Rowan jack - ups are scheduled to rollover in 2014 (1) • Seven of the 13 jack - ups are high - spec rigs, and demand for high - spec equipment continues to be strong • Locations : Middle East (4 rigs), GOM (5 rigs), SEA (3
Slide 19: Rowan Is Entering UDW Market With Advantages
Rowan Is Entering UDW Market With Advantages • High - specification drillship design with built - in redundancies in critical systems • Core team of highly experienced and respected deepwater professionals in place • Contracting success demonstrates customer enthusiasm for Rowan’s design 19
Slide 20: Rowan UDW Construction Program Progressing
Rowan UDW Construction Program Progressing • Commenced drilling first UDW rig, Rowan Renaissance , on April 22, 2014 • UDW manpower ramp up progressing as planned • Construction on schedule for next three drillships: Rowan Resolute , Rowan Reliance and Rowan Relentless 20
Slide 21: UDW Drillships Contracted and Delivery Schedule
3 of 4 UDW Drillships Contracted 21 Delivered January 2014 3 Year Contract Commenced April 22, 2014 Rowan Renaissance 1 Delivery June 2014 2 Rowan Resolute Delivery October 2014 3 Rowan Reliance Delivery March 2015 4 Rowan Relentless 3 Year Contract Commences September 2014 3 Year Contract Commences
Slide 22: Global Drillship Fleet Utilization Is 95%, Marketed 96%
22 22 USA Indian Ocean North Sea Middle East Far East Southeast Asia S. America West Africa Australia 96% 27 Rigs 100% 26 Rigs 96% 26 Rigs 100% 12 Rigs 100% 2 Rig 67% 6 Rigs 100% 2 Rigs 100% 1 Rig 100% 1 Rig Includes data supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 05/05/14) Mediterranea
Slide 23: Few Newbuild Drillships Match Rowan Specs
Few Newbuild Drillships Match Rowan Specs 23 9 4 9 15 12 14 5 6 0 5 10 15 20 25 30 2014 2015 2016 2017+ Contracted Not Contracted 18 21 • 74 Total drillships are under construction – 6 under construction are less than 10,000 ’ • 50% contracted • The Rowan Relentless will be delivered in March 2015,
Slide 24: All of Rowan's Drillships Equipped With Dual BOP Stack
All of Rowan’s Drillships Equipped With Dual BOP Stack 24 Market Share of UDW Drillships equipped* with 2 BOP Stacks and 1250 Hookload : 31 Units 0 2 4 6 8 10 No. of units * Additional units are listed as Dual Stack “capable,” but they are not equipped with the 2 nd BOP (ex. Ensco) Includes data sup
Slide 25: Floater Market Rapidly Bifurcating
Floater Market Rapidly Bifurcating 25 50 60 70 80 90 100 <5,000' 5,000'-7,499' 7,500'-9,999' 10,000'+ % Worldwide Utilization by Water Depth Floater Market includes drillships and semis. D ata supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 05/05/14)
Slide 26: UDW Day Rate Volatility Increasing
UDW Day Rate Volatility Increasing 26 $619K $608K $602K Rowan Industry Includes data supplied by ODS - Petrodata, Inc; Copyright 2014 (as of 05/07/14) (1) (1) $461K Transocean 5 th Gen rig contracted for eight months in Nigeria for Shell. (2) $550K Ensco 6 th Gen rig contracted for three years in US
Slide 27: Rowan Drillships Drive Sector Leading EPS Growth
27% 18% - 2% 29% - 24% - 7% 4% 124% 37% 37% 49% - 1% - 2% - 3% 136% 9% 39% 67% - 18% - 5% - 14% -50% 0% 50% 100% 150% 200% 250% RDC NE ATW SDRL DO ESV RIG Estimated Earnings Growth Δ 2013( a) - 2014(e) Δ 2013( a) - 2015(e) Δ 2013( a) - 2016(e) FactSet e stimates as of 05/08/2014 Rowan Drillships Dri
Slide 28: 2015 Earnings Multiple, Book Value Low
2015 Earnings Multiple, Book Value Low 28 As of April 12, 2012 Aggregate Value Price to Share Price to Earnings to EBITDA Book Price 2012 2013 2014 2012 2013 2014 Value ($) (x) (x) (x) (x) (x) (x) Seadrill 50.27 16.7x 10.5x 8.9x 7.4x 6.1x 5.7x 1.1x Transocean 37.27 11.9x 11.0x 9.8x 10.5x 8.4x 2.8x E
Slide 29: Execution And On Time Top Priorities
1.89% 1.65% 3.27% 2.47% 1.37% 0.80% 0.74% 1.32% 1.10% Execution And On Rate Time Top Priorities 11% 11% 14% 10% 9% 8% 13% 10% 13% 10% 6% 5% Out of Service Operational Downtime Includes shipyard, transit and inspection days when: Rigs are on contract and available to earn day rate, but off rate due
Slide 30: Rowan Newbuild Drillship Program Fully Financed
Rowan Newbuild Drillship Program Fully Financed (in millions) Actual 03/31/2014 Projected 12/31/2014 Cash and available credit $2,440 $1,200 Total Debt $2,808 $2,807 Total Debt - to - Cap 36% 35% Net Debt - to - Cap 22% 33% 30 Investment Grade Balance Sheet (Baa3/BBB - ) Rowan Newbuild Capex With Fo
Slide 31: Rowan is One Team
31 Rowan is One Team built around great equipment, great people, and a shared set of values and purpose.
Slide 32: Appendix
Appendix 32
Slide 33: Rowan May 6, 2014 Guidance
Rowan May 6, 2014 Guidance 1Q 2014 Actual 2Q 2014 Projected FY 2014 Projected Jack - up Out of Service Time 13% 10% 7 - 9% Jack - up Operational Downtime (unbillable) 1.1% 2.5% 2.5% Drillship Operational Downtime (1) N/A N/A Slightly higher than 5% Contract Drilling Expenses (excluding rebills) $212
Slide 34: Current Rowan Avg. Regional Offshore Rig Operating Costs
Current Rowan Avg. Regional Offshore Rig Operating Costs 34 Region Jack - ups Gulf of Mexico Low – Mid $50s Middle East Mid $50s – Mid $70s U.K. North Sea Mid – High $80s Norway North Sea Low - Mid $160s Southeast Asia Mid – High $50s Trinidad Mid $60s – Low $70s (000’s per day) As of 05/06/2014. Ra
Slide 35: 2014 Operating Cost Components
2014 Operating Cost Components 53% 12% 18% 4% 1% 3% 9% Labor & Fringes Employee-related * R&M Insurance Rig moves Rebillables All other ** 35 * Employee - related costs include training, catering and crew transportation ** Other includes rentals, medics, agent commissions, satellite communications a
Slide 36: Outstanding Debt is $2.8B as of March 31, 2014
Outstanding Debt is $2.8B as of March 31, 2014 March 31, 2014 Carrying Value 5% Senior Notes, due 2017 $399,031 7.875% Senior Notes, due 2019 $498,252 4.875% Senior Notes, due 2022 $712,821 4.75% Senior Notes, due 2024 $399,600 5.4% Senior Notes, due 2042 $398,374 5.85% Senior Notes, due 2044 $399,8
Slide 37: Rowan Drillships Built With The Operator In Mind
Rowan Drillships Built With The Operator In Mind • Two seven - ram BOPs • Equipped with 12,000 ft of riser • DP - 3 compliant with retractable thrusters • Five mud pumps with dual mud systems • Four million pound riser tensioning system • Third load path • Accommodations for 210 people on board 37 E
Slide 38: Glossary of Terms and Acronyms
Glossary of Terms and Acronyms Blowout Preventer (BOP): An emergency shut - off device comprised of a series, or “stack”, of valves that shut the wellbore in the event that hydrocarbons enter the wellbore and pressure containment is compromised. The BOP is intended to serve as a pressure control sys
Slide 39: Investor Contact
Investor Contact: Suzanne M. Spera Director, Investor Relations sspera@rowancompanies.com 713.960.7517 Rowan Companies 2800 Post Oak Blvd. Suite 5450 Houston, TX 77056 713.621.7800 www.rowancompanies.com