Cobre Limited · ASX:CBE
Cobre — Sydney Mining Club (June 2024)
18 slides from Cobre's conference presentation, Jun 6, 2024
Slide 1: Unlocking the Kalahari Copper Belt
Unlocking the Kalahari Copper Belt Botswana Corporate Presentation Sydney Mining Club | 6 June 2024 ASX: CBE
Slide 2: Disclaimer
Disclaimer Not for release to US wire services or distribution in the United States. This investor presentation has been prepared by Cobre Limited (ACN 626 241 067). This presentation is for information purposes only. This presentation is not a prospectus nor an offer for securities in any jurisdict
Slide 3: Corporate Structure
Corporate Structure As at 5/06/2024 Capital Structure Shareholder Structure Share Price (as at 5/06/24) A$0.086 Shares on issue 331.13M STRATA INVESTMENT HOLDINGS PLC 22% 4% Market Capitalisation A$28.48M 3% HSBC CUSTODY NOMINEES Cash Position1 c.A$4M 3% (AUSTRALIA) LIMITED 3% Unlisted Options (at a
Slide 4: Three-Pronged Approach to Discovery
Three-Pronged Approach to Discovery Explore Big Identify the next tier 1 deposit with support from BHP Xplor Strategic Target Discovery Drilling Potential for short-term discoveries Focused Exploration ISCR Development Potential Prove viability for copper-silver extraction using in-situ recovery NCP
Slide 5: 1. Explore Big: To Identify the Next Tier 1 Deposit
1. Explore Big: To Identify the Next Tier 1 Deposit Second largest tenement package in the KCB consisting of four Project Areas: Ngami Copper Project (727 km2), Kitlanya East (1,359 km2), Kitlanya West (1,900 km2) and Okavango (1,362 km2) - 100%-ownership Along strike, and adjacent to, producing min
Slide 6: 1. Explore Big: With the Support of BHP Xplor
1. Explore Big: With the Support of BHP Xplor BHP Xplor Accelerator Program Site Visit, May 2024 6 Sydney Mining Club | June 2024 ASX: CBE
Slide 7: 2. Strategic Target Drilling: Potential for Short-Term Discoveries
2. Strategic Target Drilling: Potential for Short-Term Discoveries Ongoing diamond drilling at Okavango OCP locality on lithological interpretation. Target copper-silver mineralised contact along strike from known deposits highlighted with planned diamond holes (green) and historical drilling (red)
Slide 8: 3. Development Potential: A Project of Significant Scale
3. Development Potential: A Project of Significant Scale Estimated scale of between 103Mt and 166Mt @ 0.38 to 0.46% Cu1 Completed to date: 5,300m of diamond drilling 12,000m of RC drilling 8,500 samples collected 8,778km airborne gravity gradient (AGG) survey (Sandfire Resources (ASX: SFR) co-fundin
Slide 9: 3. Development Potential: Hydrogeological Tests Confirm Viability of In-Situ Copper Recovery
3. Development Potential: Hydrogeological Tests Confirm Viability of Extraction Using In-Situ Copper Recovery Conditions Hydrogeological pump and injection testing, NCP Botswana 9 Sydney Mining Club | June 2024 ASX: CBE
Slide 10: 3. Development Potential: In-Situ Copper Recovery Conceptual Model
3. Development Potential: In-Situ Copper Recovery Conceptual Model Long-section through a portion of the Comet Target illustrating a conceptual in-situ copper recovery process. Injection and recovery wells would be reversed as the operation progresses along strike. Ground water pH is restored behind
Slide 11: Video
Video To view, click here ASX: CBE
Slide 12: Strong in Country Relationships
Strong in Country Relationships Excellency Mokgweetsi Masisi (President), Hon Lefoko Moagi (Minister of Mines), Her Excellency Ms Dorcas Kobela Makgato (High Commissioner to Australia) with Cobre’s CEO Adam Wooldridge and Chairman Martin Holland 12 Sydney Mining Club | June 2024 ASX: CBE
Slide 13: The Botswana Department of Mines visited the Okavango Copper Project
The Botswana Department of Mines visited the Okavango Copper Project (OCP) in May 2024 where they toured our ongoing drill programme. 13 Sydney Mining Club | June 2024 ASX: CBE
Slide 14: Local Workforce
Local Workforce CEO, Adam Wooldridge and Executive Chairman, Martin Holland onsite with the technical team in Botswana 14 Sydney Mining Club | June 2024 ASX: CBE
Slide 15: ASX: CBE
15 Sydney Mining Club | June 2024 ASX: CBE
Slide 16: Indicative Exploration Timeline
Indicative Exploration Timeline 2024 Q2 Q3 Q4 Ngami Copper Project Hydrogeological pump tests & modelling ● ● Metallurgical column tests Economic scoping study ● ● Resource diamond drilling ● Kitlanya West Project Seismic survey ● Target drilling ● Okavango Copper Project Diamond drilling priority t
Slide 17: Investment Summary
Investment Summary Vast Land Package District-scale discovery opportunities for copper deposits. Accelerated Development Potential in Botswana projects present discovery and copper development opportunities. Support from BHP Unlocking the Potential through the 2024 Xplor Programme of the Kalahari Co
Slide 18: cobre.com.au
Martin Holland Executive Chairman info@cobre.com.au Learn more and subscribe to email alerts: cobre.com.au Investor & Media Relations Investability investors@investability.com.au