Slide 1: Mt Forrest Iron Project Investor Update (ASX cover letter)
PRINCIPAL OFFICE Level 2, 25 Richardson Street, West Perth WA 6005 PO Box 92, West Perth WA 6872 T +61 8 9485 2600 F +61 8 9485 2500 www.mindax.com.au ABN 28 106 866 442 14th September 2009 ASX Limited Company Announcements Platform MT FORREST IRON PROJECT INVESTOR UPDATE Please find to follow an in
Slide 2: Mt Forrest Iron Project - Update
YilgIron Pty Ltd MT FORREST IRON PROJECT - UPDATE September 2009 1 14/09/09
Slide 3: Outline
OUTLINE Introduction to Mt Forrest where it is and its background Conceptual Exploration Target what size could it be Enterprise Concept what h t type t off operation ti On The Ground what has been achieved so far Permitting Issues what hurdles remain 2 Forward Schedule where to from here 14/09/09 D
Slide 4: Project Scope
PROJECT SCOPE The h Mt Forrest Iron Projectj iis b based d on an Exploration l i Target** released l d early l iin 2008 2008. The h Exploration l i Target is the scale of the potential iron mineralisation, based on surface geological mapping and systematic surface sampling. Should drilling successfu
Slide 5: Mt Forrest Iron Project
MT FORREST IRON PROJECT Located 650km from Port of Esperance Close to rail/gas/road infrastructure Banded magnetite iron formation over 17 km Hematite (direct shipping ore) focus Target* approximately 90-100 Mtonne of DSO * There has not yet been any drilling of these targets and according
Slide 6: Conceptual Exploration Target
CONCEPTUAL EXPLORATION TARGET* TARGET* * There has not yet been any drilling of these targets and accordingly there has been insufficient exploration to define a Mineral Resource. The target quantity and quality is conceptual in nature. Being conceptual in nature it is not certain that further explo
Slide 7: Ongoing Exploration Work
ONGOING EXPLORATION WORK Since early Si l 2008, 2008 the h CCompany h has h hadd no access to drill but has completed the following drill oriented technical work: detailed 1:1000 mapping over 16.5 km2 of prospective ironstones assay of 1925 Rockchips over mapped hematite and goethite mineralisat
Slide 8: Enterprise Concept
ENTERPRISE CONCEPT To guide the exploration and resource drilling and other project development work, work an Enterprise Concept is being developed to benchmark technical progress and the investment decision. Mining, crushing, screening hematite DSO 50% lump, 50% fines Rail (new) to Menzies, Rai
Slide 9: Enterprise Timetable
ENTERPRISE TIMETABLE MT FORREST DOS HEMATITE PROJECT - MINDAX-YILGIRON - PROVISIONAL PROJECT TIMETABLE Year -4 Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 PROJECT STAGE Exploration Resource Delineation Environmenatl Studies Feasibility Study Approva
Slide 10: "As Is" Position
“AS IS” POSITION Office established in Kalgoorlie Key s18 (1) Heritage approval received for small area Dedicated Project Manager breaks heritage impasse, allows wider area to be cleared Mapping (1000 scale) completed Some conditions S diti – Cultural C lt l H Heritage it Completing su
Slide 11: Mining Approvals
MINING APPROVALS Tenement Acquisition Environment Botany Fauna Baseline chemistry Meteorology Surface Exploration Hydrology Ground Disturbance Environmental Native Title Future Acts Drilling Protection Program P off W Workk Density of Drilling Agency Vegetation Clearing Aboriginal
Slide 12: Provisional Works Schedule
PROVISIONAL WORKS SCHEDULE IInterpretation t t ti off MMapping i commenced d llate t AAugustt Surface Sampling to be completed during September First Fi P Pass DDrilling illi to commence at Toucan T &M Macaw NNovember b 2009 Resource Definition Drilling Dec - June 2010 Exploration E l i T
Slide 13: Forward Schedule
FORWARD SCHEDULE MT FORREST DOS HEMATITE PROJECT - MINDAX - 2009-2010 PROGRAM JUL_09 AUG_09 SEP_09 OCT_09 NOV_09 DEC_09 JAN_10 FEB_10 MAR_10 APR_10 MAY_10 JUN_10 WORK PROGRAM Geology Mapping Interpretation Surface Sampling Drilling Preliminary Resource Definition Resource Studies Target Upgrade Infe
Slide 14: Disclaimer
DISCLAIMER This presentation was prepared by Mindax Limited (ABN 28 106 866 442), a public company listed on the Australian Stock Exchange. The presentation is based on internal company reports, stock exchange announcements and technical information believed to be reliable but Mindax does not make a
Slide 15: 弗里斯特山(Mt Forrest)项目的最新消息
YilgIron 控股有限公司 弗里斯特山( MT FORREST )项目的最新消息 2009年9月 1 14/09/09
Slide 16: 概要
概要 弗里斯特山区( Mt Forrest)的介绍 在哪里,什么背景 概念性的勘探靶区 有多大面积 企业概念 何种营运方式 矿场地面 至今取得什么成果 许可证问题 还有什么障碍 2 进程表 现从哪里着手 14/09/09 声明 HKG_Mt Forrest_090909 FINAL.pptx
Slide 17: 项目范围
项目范围 弗里斯特山(Mt Forrest)铁矿项目形成于2008年公布的一个勘探靶区中。勘探靶区的范围就是潜在 弗里斯特山( )铁矿项目形成于 年公布的 个勘探靶区中 勘探靶区的范围就是潜在 的铁矿化的范围,是根据地表地质绘图和系统性地表采样所得的数据来划分的。如果经过钻探能够 确定矿产资源量,而且在所有其他经济因素都支持最终的投资决定的情况下,这个靶区的范围就成 为该项目的范围。 YILGIRON - MT FORREST IRON PROJECT - CONCEPT Year -4 Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Y
Slide 18: 弗里斯特山(Mt Forrest)铁矿项目
弗里斯特山(MT FORREST)铁矿项目 距离希望港(Port 离希望港 of Esperance )650公里 公 临近铁路/天然气/道路基础建设 17多公里长的条带状磁铁矿构造 聚焦于赤铁矿(直接装运矿石) 目标*为约9千到1亿吨的直接装运矿石 * 这些靶区范围内并没有进行过钻探工作,而且并没有进行过可以确定 矿产资源相应的勘探工作 靶区的数量和质量本质上都是概念性的 也 矿产资源相应的勘探工作。靶区的数量和质量本质上都是概念性的,也 就是说进一步的勘探工作不一定就能确定矿产资源。 已经进行了绘图和地表采样,并未进行钻 探 4 在伊尔干(Yilgarn )铁矿
Slide 19: 概念性的勘探靶区
概念性的勘探靶区** 概念性的勘探靶区 * 这些靶区范围内并没有进行过钻探工作,而且并没有进行过可以确定矿产资源相应的勘探工作。靶区的数量和质量本质上都是概念性的,也 些靶 围内 有 过钻 作 有 过 确 产资 应的勘 作 靶 的数 本 都 概念性的 也 就是说进一步的勘探工作不一定就能确定矿产资源。 2008年初进行的初步绘图和岩屑采样表明了长达17多公里的含铁构造形 成了以下的概念性矿化 成了以下的概念性矿化: 75米深,数量达6.5-7.5亿吨的磁铁矿构造 含铁品位为25%到65%(平均含铁量45%) 75米深,数量达9000万到1亿吨的直接装运赤铁矿 含铁品位为57
Slide 20: 持续进行的勘探工作
持续进行的勘探工作 自2008年初,公司未能对该区进行钻探,但是已 自 年初 公司未能对该区进行钻探 但是 经完成了以下面向钻探的技术工作: 对16.5多平方公里中潜在的铁矿石进行了 1:1000的详细绘图工作 对针对赤铁矿矿化和针铁矿矿化的已绘图区中 采得的1925 件岩屑样品进行了化验 确定了14个靶区,并且 确定了279个第一孔型的建议钻孔位置 6 Mining One 咨询公司已完成了直接装运矿石采 14/09/09 矿的概念性研究,以及随之的磁铁矿采矿概念 性研究 HKG_Mt Forrest_090909 FINAL.pptx
Slide 21: 企业概念
企业概念 为指导勘探和资源钻探以及其他项目的发展工作,建立了一个企业概念来作为技术 为指导勘探和资源钻探以及其他项目的发展工作 建立了一个企业概念来作为技术 进程和投资决定的基准。 挖掘,粉碎和筛选直接装运的赤铁矿 50%块状, 50% 粉状 到达孟席斯镇(Menzies )的(新的)铁路干线,(现有的)到达 希望港(Esperance Port )的铁路干线 出口市场 最终加上磁铁矿精粉的营运 7 14/09/09 HKG_Mt Forrest_090909 FINAL.pptx
Slide 22: 企业时间表
企业时间表 MT FORREST DOS HEMATITE PROJECT - MINDAX-YILGIRON - PROVISIONAL PROJECT TIMETABLE Year -4 Year -3 Year -2 Year -1 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 PROJECT STAGE Exploration Resource Delineation Environmenatl Studies Feasibility Study Approvals Project Desi
Slide 23: 现今状况
现今状况 在考古里(Kalgoorlie )设立了 小块地区已经通过了文物保护法 办事处 中非常重要的第s18 (1) 条 聘有专职的项目经理 打破文物保护僵局,扩大许可范 围 完成了(1:1000比例)的绘图 通过文物保护管理计划的规定 完成了地表采样 需要通过第s18 (2) 补充条例 选择了进行第一期钻探的(14个) 靶区 充分安排好了对文物保护和环境 的调查 9 取得了矿场和道路的进入许可 14/09/09 计划好了第一期钻探279个钻孔 对更多靶区的持续进行地质/地 已申请工作计划(1)- 27个钻孔 球物理识别 HKG_Mt
Slide 24: 矿权许可证
矿权许可证 获得矿权 环境 植物 动物 基本化学 气象 地表勘探 水文 钻探对土地的干扰 原住民土地所有权 工作计划 环保部门 未来的法令 钻探密度 就 植物的砍伐 原住民遗产 职业健康安全 文化遗产的保护 确认文化遗产的监管机构 10 进行人类学,人志学, 考古学方 面的调查 14/09/09 递交地区申请–批准地区的确定 通过 s18条例 18条例 采矿 政府对项目的监控 HKG_Mt Forrest_090909 FINAL.pptx
Slide 25: 临时工作计划
临时工作计划 8月底开始进行图释 9月份完成地表取样工作 11 月在Toucan 和Macaw进行第 和Macaw进行第一期钻探 期钻探 2009年11月更新勘探靶区 12月到2010年6月进行资源定量钻探 2010年3月完成符合澳大利亚联合矿石储量委员会的 初始推断资源定量工作 2010年4月开始可行性研究 11 14/09/09 HKG_Mt Forrest_090909 FINAL.pptx
Slide 26: 进度计划表
进度计划表 MT FORREST DOS HEMATITE PROJECT - MINDAX - 2009-2010 PROGRAM JUL_09 AUG_09 SEP_09 OCT_09 NOV_09 DEC_09 JAN_10 FEB_10 MAR_10 APR_10 MAY_10 JUN_10 WORK PROGRAM Geology Mapping Interpretation Surface Sampling Drilling Preliminary Resource Definition Resource Studies Target Upgrade Inferred Indica
Slide 27: 声明
声明 此演示稿由澳大利亚证券交易所上市的Mindax有限公司(澳大利亚商号28 106 866 442)提供。 此演示稿是根据公司的内部报告、证券交易所发布的消息和公认为可靠的信息资料而编写,但是Mindax公司并不表明或保证其精确 度、完整性及其更新程度。 些关于未来事件的预测是前视的陈述,包含着可能引起实际结果背离预测结果的风险和不确定因素。 度、完整性及其更新程度。一些关于未来事件的预测是前视的陈述,包含着可能引起实际结果背离预测结果的风险和不确定因素。 Mindax公司不负责纠正或更新演示稿中包含的信息或意见。Mindax公司作演示时,为表达其当时的看法,可以不经过事先通知,当 场对此