Slide 1: Prudently Building the Next Mid-Tier Mining Company
Prudently Building the Next Mid-Tier Mining Company TSX: WM December 2015
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT This presentation may contain forward-looking statements (including "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of the US Private Securities Litigation Reform Act of 1995) rela
Slide 3: Wallbridge Strategy
WALLBRIDGE STRATEGY • Build value through the discovery, development, and production of metals • Build on strengths and capabilities demonstrated by recent successes – Broken Hammer open-pit operation – Ongoing partner-funded exploration – Previous spin-out companies • Establish a self-financing pip
Slide 4: Established Expertise and Asset Base in Sudbury
ESTABLISHED EXPERTISE AND ASSET BASE IN SUDBURY SUDBURY MINING CAMP JV Funded • Over a century producing high-value poly- Drilling metallic ore • Past-production & current resources – 1.648 billion tonnes (Naldrett, 2005) – 1.08 % Cu (40 B lbs) – 1.20 % Ni (44 B lbs) – 1.17 g/t Pt + Pd (62 M Oz) – L
Slide 5: Management and Directors
MANAGEMENT AND DIRECTORS MANAGEMENT DIRECTORS ALAR SOEVER WARREN HOLMES Executive Chairman and Director • Professional Geoscientist • Mining executive with +40 yrs. experience in mining • +30 yrs. experience • Director for HudBay Minerals, Atlanta Gold, Foraco International • Chairman Miocene Metals
Slide 6: Wallbridge Value-Creation Plan
WALLBRIDGE VALUE-CREATION PLAN EXPLORATION STUDIES DEVELOPMENT OPERATIONS BUILDING A STRONG FINANCIAL POSITION • Financial strength at time of significant PROJECT “Z” uncertainty • Healthy Balance Sheet • Build on strengths and capabilities demonstrated PROJECT “Y” BROKEN by recent successes HAMMER
Slide 7: Project Opportunity Sequence
PROJECT OPPORTUNITY SEQUENCE • Broken Hammer Operation – Project was completed on October 31, 2015 and closure activities are currently being completed WALLBRIDGE OPPORTUNITY REQUIREMENTS • Project “Y” ‘15 ‘16 ‘17 ‘18 ‘19 ‘20 ‘21 – Development stage project – 6-12 months to production – 1-2 year ope
Slide 8: Broken Hammer
BROKEN HAMMER 295,000 Tonnes Mined to October 31, 2015 The project was completed on October 31, 2015 and closure activities are 8 currently being completed
Slide 9: Parkin Properties Overview
PARKIN PROPERTIES OVERVIEW • 1999 Initial WM Acquisition • 2002 Historic Parkin Resource Estimate • 2008 Parkin Offset Joint Venture with Implats – Amalgamation of historically fragmented 9.5 km – Significant intersections beneath surface resource – Deep, wide-spaced platform holes for geophysics •
Slide 10: Parkin Project - Near Surface Exploration
PARKIN PROJECT- NEAR SURFACE EXPLORATION Exploration Target: 1.5-5 Mt high-grade polymetallic Offset dyke deposit above 600 meters depth 10
Slide 11: Highlight Intervals In/Near Parkin Resource
HIGHLIGHT INTERVALS IN/NEAR PARKIN RESOURCE Hole-ID From To Length Horizontal Ni Cu TPM Pt Pd Au Ag Included in (*Channel) m m m Thickness (%) (%) (g/t) (g/t) (g/t) (g/t) (g/t) Resource? *FLTR3-01 0.00 6.40 6.40 6.38 1.22 0.33 4.31 1.09 2.78 0.44 6 Y *FLTR3-02 0.00 5.50 5.50 5.48 1.10 0.50 2.70 1.10
Slide 12: Parkin Blue-Sky Exploration Potential
PARKIN BLUE-SKY EXPLORATION POTENTIAL Longitudinal section of the Parkin Offset dyke plotted to scale against the Copper Cliff and Worthington Offset dykes. Over 240 million tonnes of high-grade poly- metallic past-production and current resources are hosted in the Copper Cliff Offset dyke (Lightfoo
Slide 13: Parkin Milnet 1500 Zone – High Grade Upside at Depth
PARKIN MILNET 1500 ZONE – HIGH GRADE UPSIDE AT DEPTH Mineralisation & geophysics define 400 x 35-60 metre zone and open. WMM-014: 0.78% Ni 2.57% Cu 8.00g/t TPM 14.24 m WMM-014-W1: 0.44% Ni 0.96% Cu 2.46g/t TPM 12.66 m WMM-014-W2: 0.72% Ni 1.05% Cu 2.11g/t TPM 8.00 m 1.55% Ni 0.42% Cu 4.61g/t TPM 1.4
Slide 14: Active Partner Funded Exploration
ACTIVE PARTNER FUNDED EXPLORATION 25,000 WM Exploration & Development Discovery Level Drilling Expenditures (Millions) (Metres) 14.00 Partner Funded Exploration 20,000 WM Funded Sudbury Exploration WM Broken Hammer 12.00 WM G&A Canadian Exploration Expenditures (Billions) ** North Range JV with Lonm
Slide 15: Founding Spin-Out Equity Investment
FOUNDING SPIN-OUT EQUITY INVESTMENT • Carube Copper Corp (CUC:TSX-V) • June 2015 merger between WM spin-out Miocene Metals Limited and Carube Resource Inc. • 62.2 M shares outstanding, tightly held – WM 17.6% with board representation – Tigers Realm Group 17.9% – Oz Minerals 7.7% – Directors and Man
Slide 16: Share Structure / For Further Information
SHARE STRUCTURE Broken Hammer Operation, March, 2015 Issued & Outstanding 167.2 M Options 13.2 M Warrants & Compensation Options 4.7 M RSU’s & DSU’s 4.5 M Fully Diluted 189.6 M Share Price October 30, 2015 $0.030 FOR FURTHER INFORMATION Linda Zubal, VP Corporate Communication 705-682-9297 ext. 263 l