Magna Mining Inc · TSX:NICU

Magna Mining — Investor Presentation (March 2024)

24 slides from Magna Mining's investor presentation, March 2024

  1. Slide 1: North America's Next Nickel & Copper Producer

    TSXV: NICU OTCQB: MGMNF NORTH AMERICA’S NEXT NICKEL & COPPER PRODUCER March 2024 www.magnamining.com

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT No Advertisement or Solicitation This presentation is not, and under no circumstances is to be construed as, a prospectus, an advertisement or a public offering of these securities in Canada, the United States or any other jurisdiction. No securities commission or similar author

  3. Slide 3: The Sudbury Advantage

    T H E S U D B U R Y A D VA N TA G E OVER 100 YEARS OF MINING HISTORY LOW-COST ACCESS TO EXPLORATION AND DEVELOPMENT INFRASTRUCTURE & PROCESSING FACILITIES SOCIAL LICENSE TO OPERATE WORLD CLASS MINERAL ENDOWMENT 32

  4. Slide 4: Sudbury – A Tier 1 Nickel District

    SUDBURY – A TIER 1 NICKEL DISTRICT Sudbury is home to 9 of the 11 Historical production of 8 million tonnes The Sudbury bason has over critical mineral producing each of nickel and copper, 300 tonnes of 100 years of mining history and mines in Ontario. platinum and 100 tonnes of gold for an is domin

  5. Slide 5: Magna Mining's Strategy

    MAGNA MINING’S STRATEGY NEW DISCOVERIES NEAR TERM PRODUCTION 0 SYNERGISTIC ACQUISITIONS THROUGH EXPLORATION • Two advanced stage, past producing • Sudbury has precedent for the discovery of world class deposits in the footwall of • Long term goal to combine existing assets mines with potential for n

  6. Slide 6: Crean Hill Mine

    CREAN HILL MINE 7 7 62

  7. Slide 7: Crean Hill – A Historic Mine with the Potential for World Class Discoveries

    CREAN HILL – A HISTORIC MINE WITH THE POTENTIAL FOR WORLD CLASS DISCOVERIES PAST PRODUCING MINE, BROWNFIELD SITE • A past producing mine for INCO. • Short timelines to production re-start. • Proximity to existing infrastructure. SIGNIFICANT RESOURCE & LONG MINE LIFE CREAN HILL NI 43-101 MINERAL RESO

  8. Slide 8: Crean Hill Resource Expansion Potential

    CREAN HILL RESOURCE EXPANSION POTENTIAL 101 FW E 109 FW MCR-24-060 0.3 % Ni, 2% Cu, 8.6 g/t Pt+Pd+Au % Ni Equivalent over 14m, MCR-23-041 Including 1.1 % Ni, 8.3 % Cu, 0.3 – 0.75 3.0% Ni, 0.7% Cu, 1.2 13.9 g/t Pt+Pd+Au over 3 m Pt+Pd+Au over 31.6 m 0.75 – 1.1 MCR-23-013 1.1– 1.5 MCR-23-042 0.2 % Ni,

  9. Slide 9: Pathway to Near Term Production

    PATHWAY TO NEAR TERM PRODUCTION Crean InHill Critical Path Permitting Documents Place • Closure plan amendment filed March 2024, detailing plan for 400,000 tonnes from Advanced Exploration. Ore Selling Agreement Expected in Q1 / Q2 2024 • Production from surface bulk sample could begin upon finaliza

  10. Slide 10: The Hub – The Shakespeare Project

    THE HUB – THE SHAKESPEARE PROJECT 10

  11. Slide 11: Shakespeare

    SHAKESPEARE ADVANCED STAGE, DE-RISKED CRITICAL MINERAL PROJECT • A feasibility stage, past producing mine. • Major permits in place, known metallurgy. • Impact Benefit Agreement in place with First Nations . SHAKESPEARE NI 43-101 MINERAL RESOURCE ESTIMATE* LARGE EXISTING RESOURCE & Grade & Contained

  12. Slide 12: An Integrated Long-Term Strategy

    A N I N T E G R AT E D L O N G - T E R M S T R AT E G Y SHAKESPEARE MINE CREAN HILL MINE PEA outlines potential $280 million increase to post tax Capex of C$233m (Feasibility Study, Jan 2022). NPV (8%) if ore is processed through Shakespeare. SHAKESPEARE PROCESSING PLANT • 4,500 tpd processing plant

  13. Slide 13: Near Term Catalysts

    NEAR TERM CATALYSTS NEW DISCOVERIES NEAR TERM PRODUCTION 0 SYNERGISTIC ACQUISITIONS THROUGH EXPLORATION • Commencement of surface bulk • 6,000m drilling completed in Q1 sample, ore selling agreement and 2024, assays pending. • Material acquisitions targeted in Permit to Take Water (PTTW) in H1 2024.

  14. Slide 14: A Uniquely Positioned Junior Company

    A U N I Q U E LY P O S I T I O N E D J U N I O R C O M PA N Y WORLD CLASS EXPLORATION TARGETS ADVANCED STAGE PROJECTS WITH LOW CAPITAL COSTS & RAPID PATHS TO PRODUCTION ASSETS TECHNICALLY AND SOCIALLY DE-RISKED PROVEN OPERATIONAL & EXPLORATION EXPERTISE IN SUDBURY PATHWAY TO A MULTI-ASSET, HUB AND S

  15. Slide 15: Nickel for Our Future

    NICKEL FOR OUR FUTURE TSXV: NICU Jason Jessup, CEO Paul Fowler, Senior Vice President Jason.Jessup@magnamining.com Paul.Fowler@magnamining.com www.magnamining.com

  16. Slide 16: Capital Structure

    C A P I TA L S T R U C T U R E CURRENT CAPITAL STRUCTURE Management & Directors 10% Issued & Outstanding 163,379,860 Institutional Retail ~53% ~37% Options & RSU’s 10,600,800 Warrants 1 36,695,491 Fully Diluted 210,676,151 TOP SHAREHOLDERS Dundee Corporation 21% Cash2 $15.5 million Hawkes Point LLC

  17. Slide 17: Management

    MANAGEMENT Jason Jessup, MBA Paul Fowler, CFA Ann-Marie Finney, MBA David King, M.Sc., P.Geo. Jeff Huffman, MBA, PMP CEO & Director Senior Vice President CFO Senior Vice President COO Jason has over 25 years of Paul is an experienced Mining Ann-Marie has over 25 years of David is a registered profes

  18. Slide 18: Directors and Strategic Advisors

    D I R E C TO R S A N D S T R ATEGIC A D V I S O R S Ve r n Baker, P.Eng., MBA C h a i r m a n Vern has +30 years of experience in the mining sector. He is currently the CEO of Jaguar Mining (TSX), previously served as General Manager of Goldcorp’s Cerro Negro Mine, VP Operations at FNX Mining, and P

  19. Slide 19: Crean Hill – PEA (July 2023)

    CREAN HILL – PEA (JULY 2023) Alternative Base Case Processing STRONG ECONOMICS Total Resource Mined (Tonnes) 20,102,605 28,197,495 UG Resource Mined (Tonnes) 16,274,220 21,791,858 Mine Life (Years) 15 19 MODEST PRE-PRODUCTION CAPITAL COSTS Ni in Resource Sold (Million lbs) 276.6 351.2 Cu in Resource

  20. Slide 20: Crean Hill Footwall Potential

    CREAN HILL FOOTWALL POTENTIAL Increased Increased Cu% TPM g/t 109 FW 109 FW Defined to Defined to MCR-22-010 0.4% Ni, 0.5% Cu, 7.2 g/t 350m Level 350m Level Pt+Pd+Au over 98.3 m, Including 3.7 % Ni, 2.8 % Cu, 20.2 g/t Pt+Pd+Au over 7.1 m Footwall SIC Footwall MCR-23-013 0.2 % Ni, 0.6% Cu, 11.0 g/t P

  21. Slide 21: Crean Hill Footwall Potential

    CREAN HILL FOOTWALL POTENTIAL Crean Hill Creighton Mine Sudbury breccia and structure are important controls on the 126, 320, 400 and 461 orebodies Lightfoot, (2016) Example DDH intersections from Creighton: • 461 OB – 2.1% Ni, 5.7% Cu, 5.3 g/t TPM over 10m true width • 320 OB – 2.6% Ni, 4.6% Cu, 4.

  22. Slide 22: Shakespeare NI 43-101 Resource

    SHAKESPEARE NI 43-101 RESOURCE Shakespeare Mineral Resources, January 2022 Category (Mt) Ni (%) Cu (%) Co (%) Pt (g/t) Pd (g/t) Au (g/t) Ni Eq. (%) Open Pit Indicated 16.51 0.34 0.36 0.02 0.33 0.36 0.19 0.56 (0.2% Ni Eq cut off) Underground Indicated 3.83 0.31 0.36 0.02 0.3 0.32 0.19 0.53 (0.4% Ni E

  23. Slide 23: Crean Hill - Existing Resource

    CREAN HILL - EXISTING RESOURCE CREAN HILL MINERAL RESOURCES, OCTOBER 2022 Nickel Copper Cobalt Platinum Palladium Gold Ni Eq Category Tonnes Grade lbs Grade lbs Grade lbs Grade ozs Grade ozs Grade ozs Grade (%) (Millions) (%) (Millions) (%) (Millions) (g/t) (000's) (g/t) (000's) (g/t) (000's) (%) OP

  24. Slide 24: Crean Hill – Notes on Assumptions

    CREAN HILL –NOTES ON ASSUMPTIONS Notes on Mineral Resource Assumptions: (1) The classification of the current Mineral Resource Estimate into Indicated and Inferred is consistent with current 2014 CIM Definition Standards - For Mineral Resources and Mineral Reserves. (2) All figures are rounded to re