Magna Mining — Investor Presentation (November 2026)

46 slides from Magna Mining's investor presentation, Nov 11, 2026

  1. Slide 1: Copper, nickel & precious metal production growth in Sudbury

    www.magnamining.com Copper, nickel & precious metal production growth in Sudbury, North America’s premier mining district NOVEMBER TSX: OTC: 2026 NICU MGMNF

  2. Slide 2: Cautionary Statements

    CAUTIONARY STATEMENTS Cautionary Statement Regarding Forward-Looking Information This presentation contains forward-looking information and forward-looking statements (collectively, "forward-looking statements") within the meaning of applicable securities laws. All statements, other than statements

  3. Slide 3: The Sudbury Advantage

    THE SUDBURY ADVANTAGE Infrastructure & processing facilities Over 100 years of Social license mining to operate World class Local, provincial mineral & federal endowment government support

  4. Slide 4: Pillars of Growth

    MAGNA MINING Pillars of Growth PRODUCTION EXPLORATION SYNERGISTIC ACQUISITIONS Currently one producing copper mine Experienced Sudbury exploration team (McCreedy West) Track record of acquiring accretive Track record of making significant projects in Sudbury Formal approval to restart Levack mine di

  5. Slide 5: Sudbury: A World Class Mining District

    SUDBURY A World Class Mining District ~200km to Timmins LEVACK PODOLSKY Sudbury Glencore Toronto Strathcona Mill Levack Glencore McCREEDY WEST Falconbridge Smelter Chelmsford Vale Clarabelle Mill Vale Copper Cliff Smelter SHAKESPEARE Wanup Whitefish Nairn CREAN HILL Magna Property Massey ~400km to T

  6. Slide 6: A Clear Pathway to Multi-Asset Production in Sudbury

    A Clear Pathway to Multi-Asset Copper-Nickel-Precious Metals Production in Sudbury EXPLORATION PRODUCTION PERMITTED, PAST-PRODUCING DEVELOPMENT PROJECTS & ACQUISITION OF OTHER ASSETS OTHER PROPERTIES SHAKESPEARE Permitted for a 4,500 tpd mill PODOLSKY Strategic existing shaft & ramp to North Zone CR

  7. Slide 7: McCreedy West & Levack

    McCreedy West & Levack North Range, Sudbury Basin Vale Coleman Mine Glencore Strathcona Mill Glencore Fraser Mine McCreedy West Portal Levack #2 Shaft Levack Glencore Townsite Hardy Mine Glencore Craig Mine (Onaping Depth Project) Glencore Onaping Mine 7 07

  8. Slide 8: McCreedy West Mine

    McCreedy West Mine Producing Copper-Precious Metals-Nickel Mine Security Administrative Complex Portal Ore Sorter Crusher, Sample Tower, Shipping 08

  9. Slide 9: McCreedy West Mine

    McCreedy West Mine Producing Copper-Precious Metals-Nickel Mine Current production is from the 700 Footwall Copper Zone Actively evaluating the restart of production from the Intermain Nickel Zone Development and exploration initiatives will focus on the area to the west of the 700 FW Zone towards t

  10. Slide 10: McCreedy West Mine 2026 Guidance

    McCreedy West Mine 2026 Guidance 2026 McCREEDY WEST OPERATIONAL GUIDANCE Updated 2026 Guidance 700 Copper Zone Ore Sales (short tons) 330,000 - 345,000 Copper Equivalent Grade1 (% CuEq) 3.20% - 3.50% Payable Copper Equivalent Production1 (million lbs CuEq) 14.5 - 15.5 Total Cash Cost, excluding stre

  11. Slide 11: McCreedy West Mine 2026 Production Plans

    McCreedy West Mine 2026 Production Plans Isometric Looking North Portal Scale Blue – 2026 Development Green – Planned Development & 2026 Cu Stopes 300 Ft Orange – Planned Cu Stopes Red – Intermain Ni Contact Deposit Initial Mineral Reserve Estimate announced in Q1 2026 to support a 3-year production

  12. Slide 12: Levack Mine

    Levack Mine Past-Producing Nickel-Copper-Precious Metals Mine Administration Security Levack No.2 Shaft Building Vale Coleman Core Shack Mine Proposed Portal Glencore Strathcona Mill Sample Tower Backfill Plant Glencore Onaping Depth Project 12

  13. Slide 13: Levack Mine

    Levack Mine Past-Producing Nickel-Copper-Precious Metals Mine Conceptual MLV-25-21 Ramp From 2.3% Ni, 0.7% Cu over 28.0m Including 6.6% Ni, 0.7% Cu, over 2.4m Surface And 3.3% Ni, 1.0 % Cu over 12.4 m MLV-25-22 2.4% Ni, 0.8% Cu, over 15.5m And 3.2% Ni, 2.2% Cu over 2.4 m Main Ni-Cu Keel Cu-PGE Zone

  14. Slide 14: Levack Mine Preliminary Economic Assessment Results

    Levack Mine Preliminary Economic Assessment Results • 2,200 ton per day underground operation via existing No. 2 shaft. Production Profile Unit Commercial Production Life 7.3 years • 7.3 year mine life with commercial production in mid-2028. Mining rate1 2,141 tons per day • Initial capital of C$70.

  15. Slide 15: Levack Mine R2 Footwall Zone

    Levack Mine R2 Footwall Zone The R2 Footwall Zone area exhibits many mineralogical and structural similarities to the top of the adjacent Morrison Footwall Cu- PGE Deposit. High nickel and PGE grades transition into very high-grade copper and precious metals. 15 Exploration is ongoing with three und

  16. Slide 16: Levack Mine R2 Footwall Zone

    Levack Mine R2 Footwall Zone R2 Footwall Zone has been intersected over a vertical extent of approximately 300 metres and a north-south extent of approximately 150 metres The R2 Footwall Zone remains open up dip towards the No. 3 Footwall Zone as well as at depth towards the Morrison Footwall Cu- 16

  17. Slide 17: Levack Mine Footwall Exploration Target Areas

    Levack Mine Footwall Exploration Target Areas Felsic Norite Morrison 4300 Level Development Back Morrison 4300 Level Sulphide Vein Sublayer Norite Mapping Schematic Granite Breccia Sulphide Vein Granite Gneiss Mafic Gneiss Sudbury Breccia Narrow Sub- Gabbro vertical veins Narrow Sub-vertical veins N

  18. Slide 18: Levack Mine 1800-1600 Ramp Footwall

    Levack Mine 1800-1600 Ramp Footwall Muck Pile Grab Sample 5.7% Cu, 8.4 g/t Pt, 1.0 g/t Pd, and 0.3 g/t Au During development of the 1800-1600 connection, a zone of sulphide mineralization was intersected within an approximately 12 metre section of the ramp. This mineralization occurs approximately 3

  19. Slide 19: Levack Mine Progress Update

    Levack Mine Progress Update Connection of 3900 Level ramp to 3600 Level complete, facilitating Coleman Mine secondary egress. Development complete on the 1800 Level to access the Intermediate Ore Body (IOB). Underground drilling of R2 Footwall Zone underway from 8451 Drill Bay on the 1800 Level. R2

  20. Slide 20: Crean Hill Mine

    Crean Hill Mine Past-Producing Nickel-Copper-Precious Metals Mine Victoria Mine Project (KGHM) Portal Location Water Pre- Outcrop of 109 FW Treatment Plant Waste Rock Stockpile 2024 109 FW Bulk Sample Location 20 20

  21. Slide 21: Crean Hill Project Pre-Feasibility Study Results

    Crean Hill Project Pre-Feasibility Study Results • 11.4 million tons of Probable Reserves. Production Profile Unit Commercial Production Life 12.0 years • 2,400 ton per day underground operation (new ramp followed by shaft refurb). Mining rate1 2,397 tons per day • 12 year commercial mine life. Tota

  22. Slide 22: Crean Hill Mine Infrastructure and Geological Zones

    Crean Hill Mine Infrastructure and Geological Zones MCR-23-013 0.6 % Cu, 0.2% Ni, 7.3 g/t Pt, 2.1 g/t Pd, 1.7 109 FW g/t Au over 95.4m, Including 4,3 % Cu, 2.4 % Ni, 23.1 g/t Pt, 8.7 g/t Pd, 5.4 g/t Au over 5.1 m 105 FW 9400 Zone MCR-23-024 LM04760 0.5% Cu, 2.6% Ni, 2.3 g/t Pt, 1.0 g/t Pd 0.3% Cu, 0

  23. Slide 23: Podolsky Mine

    Podolsky Mine Past-Producing Copper-Nickel-Precious Metals Mine Administration Building Security 2000 Deposit Shaft Waste Water Treatment Plant North Zone Portal 23 23

  24. Slide 24: Podolsky Mine

    Podolsky Mine Past-Producing Copper-Nickel-Precious Metals Mine SW NE Main Shaft Portal Whistle Pit North Zone Contact Ni Zones FNX4199 17.8 % Cu, 1.4% Ni, FNX4400 10.2 g/t Pt+Pd+Au 1.0 Ni, 0.2% Cu, over 7.0 m over 103.7 m Gabbro FNX4205 Zone 21.0 % Cu, 0.7% Ni, 15.9 g/t Pt+Pd+Au FNX40238 over 6.6 m

  25. Slide 25: A Clear Pathway to Multi-Asset Production in Sudbury

    A Clear Pathway to Multi-Asset Copper-Nickel-Precious Metals Production in Sudbury EXPLORATION PRODUCTION PERMITTED, PAST-PRODUCING DEVELOPMENT PROJECTS & ACQUISITION OF OTHER ASSETS OTHER PROPERTIES SHAKESPEARE Permitted for a 4,500 tpd mill PODOLSKY Strategic existing shaft & ramp to North Zone CR

  26. Slide 26: Why Invest?

    MAGNA MINING Why Invest? LEVACK RE-START AND CREAN HILL CONSTRUCTION IN 2027 NEAR TERM EXPLORATION RESULTS - FOOTWALL TARGETS REGIONAL EXPLORATION ON EARLY-STAGE PROPERTIES POTENTIAL SYNERGISTIC ACQUISITIONS 26

  27. Slide 27: Capital Structure

    MAGNA MINING Capital Structure CURRENT CAPITAL STRUCTURE EQUITY PERFORMANCE (TSX: NICU) Issued & Outstanding 313,451,861 Options, RSUs & DSUs 14,059,704 Warrants 0 Fully Diluted 327,511,565 Cash1 C$168.4 million Debt2 C$24.0 million Share Price3 C$1.95 Market Capitalization (Basic) C$610 million 1 A

  28. Slide 28: Alpayana: New Strategic Investor

    ALPAYANA New Strategic Investor Four decades of operating history and 6 producing underground mines in Peru and Mexico. Alpayana invested C$140 million for a 19.9% stake in Magna Mining. Significant polymetallic operating expertise; over 7 million tonnes of ore produced in 2025 across multiple opera

  29. Slide 29: Sudbury's Canadian Mining Company

    SUDBURY’S CANADIAN MINING COMPANY TSX: NICU OTCQX: MGMNF Jason Jessup, CEO Paul Fowler, Executive Vice President www.magnamining.com Jason.Jessup@magnamining.com Paul.Fowler@magnamining.com

  30. Slide 30: Leadership

    MAGNA MINING Leadership Jason Jessup, MBA – Chief Executive Officer & Director Jason has over 25 years of experience in the mining industry comprising operations management, corporate development and project evaluation. Formerly FNX Mining, Sandstorm Gold, Premier Royalty, and INCO. Paul Fowler, CFA

  31. Slide 31: Directors and Strategic Advisors

    MAGNA MINING Directors and Strategic Advisors Ver n Baker, P.Eng., MBA C h a i r m a n Vern has over 30 years of experience in the mining sector. He is currently the COO of Exiro Nickel and the former CEO of Jaguar Mining (TSX). Previously served as General Manager of Goldcorp’s Cerro Negro Mine, VP

  32. Slide 32: Summary

    MAGNA MINING Summary Levack Mine re-start approved, funded by cash flow and cash on hand with commercial production anticipated mid-2028. Continued exploration success at Levack with the new R2 Footwall Zone taking shape with underground rehabilitation and development providing optimal platforms for

  33. Slide 33: Our Core Values

    AAMAGNA Vv IMINING ING. Ye ~—S MAGNAMINING Our Core Values Health & Safety of our Honesty & Integrity in Relentless Pursuit of People & the Environment Everything That We Do Excellence We do things right for ou J ) r on our c n e e e e in all thin orkers, and the omplishn 33 Taking Ownership Through

  34. Slide 34: Sudbury Property Portfolio

    SUDBURY Property Portfolio ~200km to Timmins RAND PARKIN NORTHWEST FOY NORTH RANGE PODOLSKY FROST LAKE LEVACK Capreol BLEZARD Glencore Strathcona Mill KIRKWOOD McCREEDY WEST Levack Glencore Falconbridge Smelter Chelmsford FALCONBRIDGE FOOTWALL TRILL Vale Clarabelle Mill Vale Copper Cliff Smelter SHA

  35. Slide 35: Sudbury Geology – Impact Structure

    SUDBURY Geology – Impact Structure Source: https://craterexplorer.ca/sudbury-impact-structure-geomorphology/

  36. Slide 36: Sudbury Geology – Composite Cross Section

    SUDBURY Geology – Composite Cross Section SUDBURY BRECCIA Contact-type NICKEL-COPPER deposit Footwall-type Sudbury Igneous Complex COPPER-PRECIOUS METALS (SIC) deposit Source: https://www.researchgate.net/figure/Composite-cross-section-showing-the-geological-settings-for-North-and-East-Range-type_fi

  37. Slide 37: Levack Mine Copper-Precious Metal Footwall Deposits

    Levack Mine Copper-Precious Metal Footwall Deposits Magna Mining COO Jeff Huffman in a footwall tCEO Jason Jessup and COO Jeff Huffman in a Morrison Deposit mechanized cut & fill stope circa copper stope at McCreedy West in 2010 captive cut & fill stope in the Morrison Deposit 2010 in 2011

  38. Slide 38: FNX Historical Share Price Performance

    SUDBURY FNX Historical Share Price Performance Source: Bloomberg & Company Filings

  39. Slide 39: McCreedy West Mine Q1-Q3 2026 Highlights

    McCreedy West Mine Q1-Q3 2026 Highlights Produced 12.3 million copper equivalent (“CuEq”) payable pounds in Q1-Q3 2026 McCreedy West shipped 256,014 tons of ore from the 700 Footwall Copper Zone in Q1-Q3, with record tonnage of 98,446 tons achieved in Q2 of 2026 Average grade in Q1-Q3 of 3.33% coppe

  40. Slide 40: McCreedy West Reserve and Resource Estimates

    McCreedy West Reserve and Resource Estimates1 1 See Footnotes to the McCreedy West Mineral Reserve & Mineral Resource Estimate.

  41. Slide 41: Levack Mine Mineral Resource Estimate

    Levack Mine Mineral Resource Estimate 1 1See Footnotes to the Levack Mineral Resource Estimate. 41

  42. Slide 42: Crean Hill Reserve and Resource Estimates

    Crean Hill Reserve and Resource Estimates1 1 See Footnotes to the Crean Hill Mineral Reserve & Mineral Resource Estimate.

  43. Slide 43: Historical Resources

    MAGNA MINING Historical Resources1 Historical Resources1 Deposit Ni Cu Co Pt Pd Au Ag Property Tonnes Type (%) (%) (%) (g/t) (g/t) (g/t) (g/t) Measured & Indicated Podolsky Contact 6,058,000 0.75 0.21 Podolsky Footwall 1,099,900 0.27 2.35 - 1.01 1.01 0.42 13.56 Kirkwood Contact 565,000 1.17 0.49 Tot

  44. Slide 44: Notes on McCreedy West Reserve & Resource Estimates

    Notes on McCreedy West Reserve & Resource Estimates and Historical Resources 1Notes on Mineral Reserves The effective date of the McCreedy West Mineral Reserve Estimate is December 31, 2025. Mineral Reserves are in addition to Mineral Resources. The Mineral Reserve estimate was prepared under the su

  45. Slide 45: Notes on Levack Resource Estimate

    Notes on Levack Resource Estimate Levack Mineral Resource Estimate Notes: 1. The effective date of the Levack Mine Mineral Resource Estimate is August 31, 2025. This is the close out date for the final mineral resource models and mine-out models. 2. The mineral resources are reported at a cut-off gr

  46. Slide 46: Notes on Crean Hill Reserve & Resource Estimates

    Notes on Crean Hill Reserve & Resource Estimates Crean Hill Mineral Resource Estimate Notes: 1. The effective date of the Crean Hill Property Mineral Resource Estimate (MRE) is April 15, 2026. This is the close out date mine out models (as-builts). 2. Allan Armitage, Ph.D., P. Geo. of SGS Geological