Golden Horse Minerals Limited Chess Depository · ASX:GHM

Golden Horse Minerals Limited Chess Depository — Golden Horse Minerals — Canaccord Genuity Noosa Mining Conference 2026

16 slides from Golden Horse Minerals Limited Chess Depository's conference presentation, Nov 12, 2026

  1. Slide 1: 2026: Year of the Horse

    2026: YEAR OF THE HORSE rsonal use only Canaccord Genuity Noosa Mining Conference 11-13 November 2026

  2. Slide 2: Disclaimer

    DISCLAIMER Disclaimer This investor presentation has been prepared by Golden Horse Minerals Limited (Company) based on information from its own and third-party sources and is not a disclosure document. No party other than the Company has authorised or caused the issue, lodgement, submission, despatc

  3. Slide 3: Investment Thesis: Active Explorer, Future Gold Developer

    Investment Thesis: Active Explorer, Future Gold Developer • Portfolio of high growth, advanced gold projects in an underexplored and well-endowed greenstone belt • Fully-funded aggressive drilling programs across Hopes Hill and regional prospects rsonal use only RIGHT RIGHT RIGHT RIGHT RIGHT LOCATIO

  4. Slide 4: Corporate Summary

    CORPORATE SUMMARY Fully Funded Explorer with a track record of success since IPO Tight Capital Structure Strong Share Price performance (since IPO) Quality Analyst Coverage rsonal use only Share Price1 A$0.44 $0.900 Daily Volume Closing Share Price 7.0m $0.800 6.0m Total Shares & CDIs on Issue2 255M

  5. Slide 5: 2026: The Year of the Horse

    2026: THE YEAR OF THE HORSE • Fully Funded exploration program ($23M1). • + 50 gram-metre intercepts in 2026 include2: • 26HHRC179: 4m @ 73.3 g/t Au • 26GMRC006: 8m @ 16.3 g/t Au (Greenmount) rsonal use only • 26HHRC147: 10m @ 11.3 g/t Au • 26HHDD010: 16m @ 6.8 g/t Au • 26HHRC066: 7m @ 13.0 g/t Au •

  6. Slide 6: GHM's Flagship: Hopes Hill Gold Project

    GHM’S FLAGSHIP: HOPES HILL GOLD PROJECT • Two phases of underground and open pit mining from 1895 to 1989 have produced over 216koz1 at 2.5 g/t Au. rsonal use only • Active drill programs at Hopes Hill and regional drilling activities throughout 2026. 1904 1988 • Broad, high-grade mineralisation tha

  7. Slide 7: Hopes Hill vs Flemington: +4km strike vs 1.2km straight

    HOPES HILL vs FLEMINGTON: +4km strike vs 1.2km straight Hopes Hill North2: Hopes Hill North Wide intercepts +1.5km from the pit crest: • 26HHRC179: 4m @ 73.3 g/t Au from 88m rsonal use only • 26HHRC024: 12m @ 7.0 g/t Au from 278m • 26HHRC027: 16m @ 1.6 g/t Au from 32m M77/551 Historic Tenement • 26H

  8. Slide 8: Building Scale: 2026 Top Ten Hits (To Date)

    BUILDING SCALE: 2026 TOP TEN HITS (TO DATE) More Hits than Slim Dusty: 26 and counting +20 gram-metre intercepts in CY26 rsonal use only Note 1: Refer to the Independent Technical Assessment report annexed to the replacement prospectus lodged with the ASX on 12 December 2024. Note 2: Refer to ASX an

  9. Slide 9: Hopes Hill: Continued Drilling Success

    HOPES HILL: CONTINUED DRILLING SUCCESS • Diamond drilling continues to intercept wide, high-grade mineralisation +350m below surface. • RC drilling successfully intercepts extensions beyond 3km of mineralised strike along Hopes Hill trend. rsonal use only • Mineralisation remains open within a well-

  10. Slide 10: Hopes Hill: Simple & Proven Mineralogy

    HOPES HILL: SIMPLE & PROVEN MINERALOGY Proven Production • 216koz Au recovered to 19891 Exceptional Recoveries rsonal use only • +95% recoveries in 2025 BLEG testwork2 Free-Milling Gold Confirmed • 2026 Microscopy Study completed2 Qtz Hopes Hil CIL plant1 under construction, 1987 Note 1: The Hopes H

  11. Slide 11: Other Ponies in the Stable: Queued for Drilling

    OTHER PONIES IN THE STABLE: QUEUED FOR DRILLING • Greenmount1: High-grade extensional mineralisation confirmed in first pass drill program: rsonal use only 26GMRC006: 8m @ 16.3 g/t Au from 209m 26GMRC004: 8m @ 8.6 g/t Au from 218m 26GMRC005: 12m @ 5.2 g/t Au from 139m • Withers1: Grab sampling confi

  12. Slide 12: Regional Context: Emerging District

    REGIONAL CONTEXT: EMERGING DISTRICT Four major players in the Southern Cross district with >87% of total gold endowment hosted by Golden Horse and three other parties in an increasingly active region. rsonal use only • Edna May (Forrestania Resources Ltd) • ~ 2.9Mtpa Process Plant (C&M) • ~ 1.0Moz A

  13. Slide 13: Sorrel: Low-Cost Exposure to Copper Market

    SORREL: LOW-COST EXPOSURE TO COPPER MARKET • Exposure to copper, cobalt and base metal markets with strategic acquisition in 2025. rsonal use only • Located in the productive McArthur Basin ~30km west of NT / Queensland border. • Following a strategic review, Golden Horse proposed to ‘Spin Out’ the

  14. Slide 14: Backing the Right Horse

    BACKING THE RIGHT HORSE Accelerating growth across advanced high grade gold projects in a Tier 1 jurisdiction Proven ability to deliver exploration success and targeting inaugural MRE for Hopes Hill rsonal use only RIGHT RIGHT RIGHT RIGHT RIGHT LOCATION MOMENT ASSETS PEOPLE STRATEGY Dominant land Ad

  15. Slide 15: Appendix 1: Recap of 2025

    APPENDIX 1: RECAP OF 2025 “To build a significant gold resource base within 18 months following ASX listing and develop production-ready assets’’ +200 holes drilled, all hit mineralisation rsonal use only • +41.5km of drilling completed from 220 holes since Jan 2025. • Consistent broad, high-grade g

  16. Slide 16: rsonal use only

    rsonal use only A: Ground Floor, 34 Colin Street West Perth WA 6005 I E: info@goldenhorseminerals.com.au

Golden Horse Minerals — Canaccord Genuity Noosa Mining Conference 2026 on 6ix