Macro Metals Limited · ASX:M4M
Macro Metals — Kogi Iron — Investor Presentation (November 2013)
39 slides from Macro Metals's investor presentation, November 2013

Slide 1: Company Presentation
ABN 28 001 894 033 Company Presentation Nov 2013 Iggy Tan Managing Director www.kogiiron.com | ASX: KFE

Slide 2: Vision to be an African Iron Ore producer
Vision to be an African Iron Ore producer Significant iron ore resource Project scale upside Advantages in doing business in Nigeria Vision to be an ASX 300 company Strong Board with credentials to develop project www.kogiiron.com | ASX: KFE 2

Slide 3: Very large deposit and potential
Very large deposit and potential Access to transport infrastructure Could attract investment to build project To work and learn from the Iron Ore legend www.kogiiron.com | ASX: KFE 3

Slide 4: Chairman Dr Ian Burston OA
Chairman Dr Ian Burston OA Legend in Iron Ore Has held the following positions MD Hamersley Iron MD Portman Mining NED Fortescue Metals Group Chairman Aztec Exec Chairman Cape Lambert Chairman African Iron Limited Dr Burston has put his own money and time into this project www.kogiiron.c

Slide 5: Kogi Iron: a unique iron ore investment opportunity
Kogi Iron represents a unique iron ore investment opportunity with large resource potential, proximity to infrastructure and potentially significant project scale Corporate Snapshot Project Ownership ASX Code KFE Agbaja Iron Ore Project (196km2) 100% Shares on Issue 306.0m Additional 200km2 underexp

Slide 6: Nigeria country overview
Former British colony, population 163m Gained independence in 1960 President elected by popular vote Oil and oil products 95% of exports and 80% of budget revenue Oil production approx. 2.46 million barrels per day GDP real growth rate 7.2% (2011) GDP per capita of approximately $2,600

Slide 7: Citigroup Beyond BRICs Global Growth Generators
Citigroup1 Beyond BRICs – 11 Global Growth Generators (3G) Highest GDP growth 2010-2050 Two African countries including Nigeria 1. Citigroup Feb 2011 Williem Buiter (Chief Economist) http://enwikipedia.org/wiki/3G-(countries) www.kogiiron.com | ASX: KFE 7

Slide 8: Nigeria forecast to be in top 10 world economies by 2050
Nigeria forecast to be in top 10 world economies by 2050! 3G Counties in green boxes 1. Citigroup Feb 2011 Williem Buiter (Chief Economist) http://enwikipedia.org/wiki/3G-(countries) www.kogiiron.com | ASX: KFE 8

Slide 9: Standard Bank MINT economies
Standard Bank UK – MINT - Mexico, Indonesia, Nigeria & Turkey (MINT) Nigeria - Strongest fiscal balance, lowest public debt, population, market- oriented reforms Foreign direct investment (FDI) at $8.9 billion (16% of Africa’s total FDI) 1. http://businessdayonline.com/2013/04/nigeria-fastest-

Slide 10: China iron ore import needs and Africa
China needs to import 75% of iron ore Controls less than 10% of Australia’s iron ore production China’s total Foreign Investment in Aust is less than 1% Inflated cost base on recent Aust projects Looking to Brazil and Africa as improving investment destinations “Africa is the place where C

Slide 11: Contemporary mining Act and favourable fiscal regime
Contemporary mining Act (2007) and regulations Government is a regulator – no “free carried participation” Relative ease of Cadastre tenement application and approvals Favourable fiscal regime for foreign mining companies: • Corporate tax rate – 30%; • Royalty, iron ore – 3%; • Transparent a

Slide 12: Achievements over the past year
Company name change to Kogi Iron Limited Opening of site office on the Agbaja plateau Completed extensive resource drilling program Maiden JORC Compliant Inferred Mineral Resource of 488mt Completed a 25 hole step-out drilling program and estimating an updated Exploration Target Metallur

Slide 13: Clear strategy and development road map for Agbaja
Defined a clear strategy and development road map for Agbaja Project Closer ties with Nigerian Government and Community Marketing and Communication strategy to raise the profile of Kogi Iron Re-engagement of our current shareholder base Create positive momentum in shareholder support Rai

Slide 14: Agbaja inferred resource and exploration target
Project area of 178km2 Established Inferred Mineral Resource of 488 Mt @ 42.7% Fe1 Only 20% of the prospective plateau area within EL12124 Current Exploration Target2 for Agbaja Project is 1.8 – 3.0 Bt at 32 - 48% Fe 1 At 20% Fe cut-off, after completion of approximately 14,000m of RC drilli

Slide 15: 21,157m of drilling and 488 Mt inferred resource in 18 months
The Nigerian Kogi team achieved 21,157m of drilling, with one drill rig and developed a JORC inferred resource of 488 Mt @ 42.7% Fe in 18 months www.kogiiron.com | ASX: KFE 15

Slide 16: Highly unique channel iron deposit
Highly unique deposit Iron mineralisation hosted in Cretaceous channel iron deposit (CID) Shallow, flat-lying sedimentary sequence CID comprises iron-bearing nodules in an iron-rich matrix CID ave thickness 12.5m (range 8-24m) www.kogiiron.com | ASX: KFE 16

Slide 17: Ideal for continuous surface mining
Ideal for continuous surface mining – cut, break and convey 20 km 3-6 km www.kogiiron.com | ASX: KFE 17

Slide 18: Established transport infrastructure
Established transport infrastructure Niger River barging to sea port Proposed transhipment facility – loading cape size ships Barging will be first phase Railway second phase Proposed Transhipment Facility www.kogiiron.com | ASX: KFE 18

Slide 19: Nearby towns, highway, power, rail and river
Town and facilities of Lokoja close by Major highway from Lokoja to Abuja capital High voltage power lines Niger River close by & ideal for barging Established railway line to Warri port 3G mobile service coverage to ocean shipping www.kogiiron.com | ASX: KFE 19

Slide 20: Mining to shipping process video
Beneficiation Crusher Plant Surface Mining ROM Tailings AGBAJA PLATEAU Water Approx 20 km Banda Barge Facility Warri Port Transshipment 11,500 t Ocean Barge 3,000 t River Barge Niger River 508 km Gulf of Guinea 125 km 170,000 t OGV Movie www.kogiiron.com | ASX: KFE 20

Slide 21: Scoping Study progress
High calibre team, building strong momentum Detailed level of study Strongly directed by Kogi Iron Managing costs Accelerated pace Complying to 2012 JORC Code * On track for completion end Q1 2014 * 2012 JORC Code and ASIC/ASX limits the Company from specifying details of the Scoping S

Slide 22: Study area consultants
Study Area Company Resource Coffey Mining Mine Planning Coffey Mining Metallurgy & Process Tenova Australia Pipeline Patterson & Cooke Barging Prestedge Retief Dresner Wijnberg Operations Wilson & Associates Market AME Group Financial Modelling NPV Pty Ltd Environment & Social Greenwater Pty Ltd www

Slide 23: Conceptual mine designs and strip ratio
Potential location for processing plant identified Conceptual mine designs completed for Stage 1 and Stage 2 mine areas Thickness of target ore body Low estimated 20 year strip ratio of 0.72 to 1 will minimise future mining costs Average strip ratio of 0.42 to 1 in first three years of ope

Slide 24: Plant location
Plant Location www.kogiiron.com | ASX: KFE

Slide 25: Simple beneficiation by magnetic separation
Simple Beneficiation – Magnetic Separation Coarse particle size – 250 micron Process plant design & equipment selection completed Budget quotations received from most equipment suppliers Capital cost estimation underway Site and roads layout completed Manning, infrastructure & building

Slide 26: Scoping Study will consider the following process
Scoping Study will consider the following process www.kogiiron.com | ASX: KFE

Slide 27: Process flow layout
Process Water Pond Mag Separation Screening Plant Crushers ROM Crushed Ore Stockpile Power Road & Pipeline to Plant Banda River Port www.kogiiron.com | ASX: KFE 27

Slide 28: Road and slurry pipeline to Banda
• Road from Banda to Agbaja • Main access to site • 22 kms buried slurry and water pipeline • 244 mm dia slurry line • 500 mm dia water pipe line • Leak detection www.kogiiron.com | ASX: KFE 28

Slide 29: Concentrate barge loading
Concentrate Barges Concentrate Loader Process water intake Concentrate Stockpile Filtration Building www.kogiiron.com | ASX: KFE 29

Slide 30: Barging study
• Barging study completed by PRDW • Barging to Warri and then to trans shipment point • Currently PRDW optimising barging scenario • Will bypass Warri Port (double handling) and straight to trans shipment point • Transfer from river barges to sea going barges www.kogiiron.com | ASX: KFE 30

Slide 31: www.kogiiron.com | ASX: KFE
www.kogiiron.com | ASX: KFE 31

Slide 32: Environmental and Social Impact Assessment
Environmental and Social Impact Assessment (ESIA) – draft completed Base line data collection over the dry and wet seasons completed No environmental show stoppers Large social benefits - local employment Growth in support industrial sector Job creation and up-skilling of local workforce

Slide 33: Risk assessment and financial modelling
Risk Assessment Workshop completed Risk Management Plan in place Operating Cost estimation – in progress Preliminary Financial modelling in progress Helps guide in operational design Market outlook and price forecast – AME Group www.kogiiron.com | ASX: KFE 33

Slide 34: Board has credentials to develop Agbaja
Board has credentials to develop Agbaja MD Iggy Tan – Involved in 7 resource start ups and various capital raisings Chairman Ian Burston – legend in iron ore and mining industry Country Executive Director, Kevin Joseph – 24 years in Africa Don Carroll (Sales BHP), Brian King (Mining), Joe

Slide 35: Government relationships
Good working relationship Mines Director General & Department Highly supportive Minister of Mines and Steel Development Government policy to diversify from oil/gas Kogi setting the standards in mine development High quality environmental work L to R: Director General Armate, Mines Minister

Slide 36: Community partnership
Land consent agreement established Good community partnership with 11 local Agbaja communities Personal support by the Massi of Agbaja 98% current employees are Kogi State locals Local procurement of goods and services Various community development projects Massi HRH Abubakar Isa Alugber

Slide 37: Vision to be an African Iron Ore Producer
Vision to be a African Iron Ore Producer Significant iron ore resource & scale Strong Government and Community Support Entering a very exciting phase Building strong momentum Continuous and regular update to the market Good strong news flow expected On track to complete Scoping Study

Slide 38: Note 1 - Scoping Study
Note 1 -Scoping Study Investors are advised that the purpose of the Scoping Study is to assess the potential viability of the development of a mining and processing operation at the Company’s Agbaja Project against a set of key commercial parameters. Neither the commencement of the Scoping Study, no

Slide 39: For further information, please contact
For further information, please contact: Kogi Iron Limited Media Iggy Tan Michael Vaughan Managing Director Cannings Purple Tel: +61 8 9200 3456 Tel: +61 8 6314 6300 Email: info@kogiiron.com Email:mvaughan@canningspurple.com.au Shareholders are encouraged to visit the Company website (www.kogiiron.c
Source: Internet Archive copy of kogiiron.com
More decks from Macro Metals Limited
Shareholder Meeting (November 2026)28 slides · Nov 20, 2026
Investor Presentation (October 2026)13 slides · Oct 13, 2026
Shareholder Meeting (November 2025)13 slides · Nov 27, 2025
Investor Presentation (February 2025)17 slides · Feb 12, 2025
Non-Deal Roadshow (December 2024)26 slides · Dec 2, 2024
Shareholder Meeting (November 2024)30 slides · Nov 26, 2024