WA Gold Limited · ASX:WAU
WA Gold — Brazilian Metals Group — Investor Presentation (November 2011)
17 slides from WA Gold's investor presentation, November 2011

Slide 1: Company Presentation
Brazilian Metals Group Company Presentation BMG November 2011 ASX: BMG

Slide 2: Disclaimers
DISCLAIMERS Exploration Results and Mineral Resources The information in this presentation that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Malcolm Castle, who is a Member of the Australasian Institute of Mining and Metallurgy (“AusIMM”). Mr

Slide 3: Brazil Overview
BRAZIL OVERVIEW World class iron ore province in Northern Minas Gerais Major global investments in RIO PARDO PROJECT Brazil: BHP, Vale, CSN, MMX, Minas Gerais, BRAZIL Ferrous, ENRC, Honbridge Sustainable economic growth 4.5 - 5% pa Stable political system, secure tenure, low sovereign risk

Slide 4: BMG – Overview
BMG – OVERVIEW Strategic intent to develop a 25mt pa premium product operation for export markets with a 20+ year mine life Strategic presence in an emerging world class iron ore province Regional iron ore acquisitions >US$2b in the last 18 months Potential for 3.5bt of deposits to produce p

Slide 5: BMG Projects
BMG PROJECTS Province has potential of • Aeromagnetic image of central iron ore region 20 – 40bt Rio Pardo 2-3bt Significant large scale deposits Major global resource companies in the region All known deposits are associated with A’mag Vale Deposit 3.5bt trends Jiboia Vale Honbridge Blo

Slide 6: Gema Verde Deposit
GEMA VERDE DEPOSIT Maiden Mineral Resource of 458.5mt Honbridge Measured – 230mt Block 8 Indicated – 166.5mt Inferred – 62mt Gema Verde Contiguous with Honbridge’s Block 8 (2.6bt) . Further potential exists to the west and down dip from Block 8 Low Strip Ratio and friable ore zones in

Slide 7: Rio Pardo Project
RIO PARDO PROJECT JOSILENE – SCORPION DEPOSIT Exploration Target 2 to 3b tonnes based on current drilling over 13km strike length with 28 RC holes to date* Mineralisation extends into the adjoining tenements Resource estimation mid 2012 Area: 887km2 * The potential quantity and grade is conc

Slide 8: Conceptual Process Route
CONCEPTUAL PROCESS ROUTE ROM Ore – 100% METS undertaking metallurgical 18% Fe evaluation and process design Coarse grained Hematite - Heavy fraction – 60% Light fraction to 27% Fe Magnetite mineralisation waste – 40% 5% Fe GRINDING GRINDIN Siliceous rock fragments included in host rock CRUSHIN

Slide 9: Australian Comparison
AUSTRALIAN COMPARISON Pilbara Deposits, Magnetite Deposits, Rapitan Deposits Western Australia Western Australia Minas Gerais, Brazil Age Lower Proterozoic Lower Proterozoic NeoProterozoic Banded Iron Formation Banded Iron Formation Glaciomarine Sediments Geological Tertiary Weathering - insitu Low

Slide 10: Brazil Rail Infrastructure
BRAZIL RAIL INFRASTRUSTURE Rail Ilheus to Caetité BELÉM will be completed in EF 151 2012/13 EF 334 State owned open BOQUEIRÃO DA ESPERANÇA access or shared usage FIGUEIRÓPOLIS Project spur line 160km CAETITÉ ILHÉUS to Caetité Rio Pardo Ilheus free access port PORTO MURTINHO capacity initiall

Slide 11: Port Infrastructure
PORT INFRASTRUCTURE Proposed Public Port facility Location: 25km north of the city of Ilhéus, Bahia Port total area of 18km2 Natural water depth at 19m; port construction favourable for cape size vessels Construction by Bahia government; private consortiums considering dedicated facilities

Slide 12: Recent M&A Activity
RECENT M&A ACTIVITY Anglo American purchase of Minas Rio for US$5.5b in 2007/8 Ferrous Resources acquired exploration tenements for US$600m in 2007/8. Current valuation approximately US$3b Steel do Brasil acquired 80% of MIBA (Jiboia) for US$190m (US$240m 100%) in March 2010 Honbridge (HK li

Slide 13: BMG Investment Opportunity
BMG INVESTMENT OPPORTUNITY Opportunity for ground floor investment into multi billion tonne iron ore project in world class province Projected product capacity of 400 to 500mt of pellet feed concentrate at 67% Fe Brazilian OPEX significantly lower than Australian producers Open access rail a

Slide 14: 14
14

Slide 15: Senior Management
SENIOR MANAGEMENT Mr. Bruce Alexander McCracken - Chief Executive Officer BCom, LLB, MBA, GAICD - Corporate Mr McCracken is a business executive with 20 years experience across a broad range of industries. Most recently he was Corporate Development Director of the Kirin Group-owned Lion Pty Ltd (pre

Slide 16: Directors
DIRECTORS Mr. Peter O'Connor – Chairman MA Economics and Political Science, Trinity College, Dublin; called to the Irish Bar, King’s Inns, Dublin (1964) Mr O'Connor has over 40 years experience in international investment management, and is chairman of a number of publicly quoted investment companie

Slide 17: Capital Structure
CAPITAL STRUCTURE ASX Codes: BMG/ BMGO Ordinary Shares* on Issue: 148 Million Tradeable Options: 137 Million (ex at 20c until 31/03/2014) Market Cap: ~ A$10 - 15 Million 52 – Week Trading Range: A$0.06 - $0.33 *Escrowed Shares: 72.2 Million 17
Source: Internet Archive copy of bmgl.com.au
More decks from WA Gold Limited
Australian Gold Conference 202621 slides · Oct 15, 2026
BMG Resources — Investor Presentation (February 2026)17 slides · Feb 10, 2026
Investor Presentation (June 2019)18 slides · Jun 24, 2019
Brazilian Metals Group — Investor Presentation (January 2013)25 slides · January 2013
Brazilian Metals Group — Investor Presentation (June 2012)17 slides · June 2012
Brazilian Metals Group — Shareholder Meeting (November 2011)15 slides · Nov 28, 2011