Wa Gold Limited · ASX:WAU

Wa Gold — Australian Gold Conference 2026

21 slides from Wa Gold's conference presentation, Oct 15, 2026

  1. Slide 1: An Emerging Western Australian Gold Producer

    ASX: WAU AUSTRALIAN GOLD CONFERENCE Sydney · 13–15 October 2026 An Emerging Western Australian Gold Producer Abercromby and Bullabulling Gold Projects

  2. Slide 2: Important Notice & Disclaimer

    WA GOLD LIMITED Important Notice & Disclaimer General: This announcement includes forward-looking statements that are only predictions and are subject to known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of WA Gold, the directors an

  3. Slide 3: Investment Summary

    WA GOLD LIMITED Investment Summary Abercromby Scoping Study confirms low-capital, high-margin pathway to near-term gold production 518koz A$270M A$8M 7,200m JORC Mineral Pre-tax Pre-production RC Drilling Resource Cashflow Capital Underway 11.1Mt @ 1.45g/t Au at Stage 1 Mine midpoint (A$243– Staged

  4. Slide 4: Corporate Snapshot

    WA GOLD LIMITED Corporate Snapshot Capital Structure Board and Management ASX code WAU Ben Pollard Geologist and project developer; 30 years in WA, from Chief Executive Officer resource definition to production Share price (13 Oct 2026) A$0.013 John Prineas 30+ years in resources, banking and law; p

  5. Slide 5: Project Portfolio

    WA GOLD LIMITED Project Portfolio Abercromby Development 518koz Au JORC resource on granted Mining Leases, Wiluna Greenstone Belt; positive Scoping Study Bullabulling Exploration Adjacent to Minerals 260’s 4.5Moz Bullabulling Gold Mine, 30km west of Coolgardie Invincible Exploration 12.5km of the Wa

  6. Slide 6: Abercromby Gold Project

    01 Abercromby Gold Project 518koz Au Mineral Resource on granted Mining Leases, with a Final Investment Decision targeted for 2027 Wiluna–Agnew region, Western Australia

  7. Slide 7: Location & Geology

    ABERCROMBY GOLD PROJECT Location & Geology Established gold district Wiluna Greenstone Belt, with more than 40Moz Au endowment, second only to Kalgoorlie in historic production. Processing nearby Multiple gold mills in the region, including Northern Star’s Jundee (3.0Mtpa, ~50km) and ~50km) and Wilu

  8. Slide 8: Mineral Resource

    ABERCROMBY GOLD PROJECT Mineral Resource Classification Depth Cut-off Tonnes Au g/t Ounces 518koz Indicated Indicated <200mbs >200mbs 0.40 1.25 3,858,000 294,000 1.18 1.94 146,000 18,000 11.12Mt @ 1.45g/t Au Total Indicated 4,152,000 1.23 165,000 Mineralisation begins near surface and Inferred <200m

  9. Slide 9: Scoping Study Outcomes

    ABERCROMBY GOLD PROJECT Scoping Study Outcomes A$243–297M A$205–253M A$8M Stage 1 total net cashflow, pre-tax NPV7, pre-tax Pre-production capital ~114koz 33x 94% Production Target, ~90% Indicated Return on pre-production investment Metallurgical recovery, free-milling CIL Staged mine plan Gold pric

  10. Slide 10: 2026 Diamond Drilling Results

    ABERCROMBY GOLD PROJECT 2026 Diamond Drilling Results 7/7 holes intersected the targeted eastern lode 9m @ 3.07g/t Au incl. 2.91m @ 5.25g/t 26ABDD003 9.41m @ 2.89g/t Au incl. 0.38m @ 35.21g/t 26ABDD005 3m @ 5.90g/t Au incl. 0.61m @ 28.85g/t 26ABDD006 6m @ 2.90g/t Au from 312m 26ABDD007 Gold minerlis

  11. Slide 11: Scale of the Gold System

    ABERCROMBY GOLD PROJECT Scale of the Gold System 231m @ 0.25g/t Au alteration halo in 26ABDD001 Eastern Lode long section, grade × width contours; new 2026 intercepts shown as stars Footwall lodes outside the resource model Down-dip continuation below the resource ASX Announcement: 4 August 2026 ASX

  12. Slide 12: 7,200m RC Resource Development Program

    ABERCROMBY GOLD PROJECT 7,200m RC Resource Development Program IN PRO G RESS · ASSAYS W ITHIN W EEK S 54 ~7,200m RC holes fully funded Targets resource infill within the planned Stage 1 open pit Feeds an updated MRE and maiden Ore Reserve evaluation Supports mine planning and assessment of the Stage

  13. Slide 13: Pathway to Development

    ABERCROMBY GOLD PROJECT Pathway to Development Apr 2026 Aug 2026 Now Next 2027 Late 2027 – early 2028 Scoping Study Phase 1 diamond 7,200m RC drilling Updated MRE Maiden Ore Development results Reserve and FID Ready Plus geotechnical and Completed Completed Assays within weeks step-out drilling Fina

  14. Slide 14: Bullabulling Gold Project

    02 Bullabulling Gold Project Strategically located adjacent to a 4.5Moz gold system, with newly identified SAM anomalies providing targets for deeper drilling. Coolgardie Mineral Field, Western Australia

  15. Slide 15: Strategic Position

    BULLABULLING GOLD PROJECT Strategic Position 4.5Moz Minerals 260’s Bullabulling Gold Mine, adjacent to WA Gold’s tenure Mi6 grew its holding from 130km² to 1,160km² in May 2026 WA Gold holds the only other significant independently owned tenure in the district. Strategically positioned along the cor

  16. Slide 16: Bullabulling 2026 Exploration Results

    BULLABULLING GOLD PROJECT 2026 Exploration Results 9 4km+ SAM anomalies defined at Combined strike of anomalism Bullabulling North High-resolution Sub-Audio Magnetics (SAM) survey identifies prospective geological structures beneath surface cover. Reconnaissance RC drilling (41 holes for 1,897m) out

  17. Slide 17: Additional Growth Projects

    WA GOLD LIMITED Additional Growth Projects Invincible South Boddington P ILBA RA · 100% OW N ED S OU TH W ES T · A P P LICA TION S 12.5km of the shear hosting the 1.5Moz Warrawoona Gold Mine Saddleback Greenstone Belt, host to Newmont’s +40Moz Boddington Au deposit +5km soil anomaly; historic mine p

  18. Slide 18: Near-Term Catalysts

    WA GOLD LIMITED Near-Term Catalysts Timing Project Catalyst Imminent Abercromby Assays from 54-hole, 7,200m RC program Q4 2026 Bullabulling Deeper RC drilling of SAM and geochemical targets Following RC Abercromby Updated Mineral Resource Estimate Ongoing Abercromby ~6,000m diamond step-out and geot

  19. Slide 19: Why Invest

    WA GOLD L IMITED Why Invest 01 02 03 Permitted resource Low-capex development De-risking underway 518koz Au on granted Mining Leases in a +40Moz A$8m start-up for ~A$270m pre-tax Stage 1 7/7 diamond hits at Abercromby; Au belt cashflow 7,200m RC assays imminent 04 05 06 Resource growth Discovery ups

  20. Slide 20: Thank You

    enquiry@wagold.com.au Thank You +61 8 6109 6178 www.wagold.com.au Ben Pollard, Chief Executive Officer Suite 2, Level 2, 28 Ord Street, West Perth WA 6005 ASX: WAU

  21. Slide 21: Competent Person Statement & References

    APPENDIX Competent Person Statement & References Information in this presentation relating to Exploration Results and Mineral Resources WAU ASX releases is based on information compiled by Mr Ben Pollard, CEO of WA Gold and a Member of the AusIMM. Mr Pollard has sufficient relevant experience to qua

WA Gold — Australian Gold Conference 2026 on 6ix